WorkflowIT & Data

Computer Software Assurance

Computer software assurance that puts scripted testing only where the risk is

See one case, screen by screen ↓
Watch with transcript →

Built forValidation leadsValidation engineersSystem ownersIT quality approvers

The Problem Today

Validation teams write a test script and take screenshots for each requirement, retesting features the supplier already proved.

118 h
to script and test each requirement of one lab system module our estimate
5 days
to a complete first draft of one validation, by hand our estimate

Read and scripted by hand

  • User specs
  • Config spec
  • Supplier
  • SOP
  • Same depth for each functionA lab news board tested as deeply as a result calculation
  • Risk judged by gutEngineers rate risk differently, and rarely on the record

The Solution

  1. Six sources readSpecs, supplier package and audit report split into requirements
  2. Each function placed on riskImpact on patient safety against likelihood of failure sets the method
  3. Supplier evidence reusedSupplier tests and audit reports accepted where they cover a function
  4. Plan drafted and signedPlan, scripts and trace matrix drafted, with each requirement traced

Built-in controls

  • A qualified person decides each placement
  • Where the SOP is stricter, a person decides on the record
  • One audit trail for people and agents

What You Get

Fewer testing hours stand between a system and go-live, and the supplier's proof is not paid for twice.

56 h
of risk-based testing on the same module, against 118 h our estimate
  • A risk call inspectors can followEach placement cites the passage behind it
  • The same call from each engineerOne approved grid sets the method for each function
  • Lighter proof, still recordedUnscripted charters with notes, issues and a conclusion
In short

What is Computer Software Assurance?

Computer software assurance (CSA) is the risk-based approach FDA describes in its guidance, Computer Software Assurance for Production and Quality System Software. The guidance became final in September 2025. Scripted testing, full or limited, goes where a function's failure could harm safety. The rest gets unscripted testing, and the supplier's own testing counts where it applies. The Computer Software Assurance solution applies it function by function, on a grid your IT Quality team approves.

How to choose AI solutions for life sciences →

Updated

The problem

Validation teams test every requirement in full, even what the supplier already proved

Drug makers run many computer systems for GxP work. GxP is the set of rules for good practice in making and testing medicines. Such a system might be a LIMS, the lab's data system, or an eQMS, the electronic quality system. It might also be a batch release console or a validated spreadsheet. Each one has to be proven fit for its intended use before go-live and after each change. In practice, validation teams still write a test script for each requirement and take screenshots as proof. By the solution's own estimate, scripting all 42 requirements of one new LIMS module takes about 118 hours of testing. Most of that tests again what the supplier already tested, such as the audit-trail engine, the e-signature engine, backup and hosting.

FDA's Computer Software Assurance guidance, final in September 2025, asks for effort sized to the risk of each function. So does GAMP 5, 2nd edition, an industry guide to validating computer systems. Functions whose failure could harm safety get scripted tests. The rest get unscripted testing, and the supplier's own testing and audits count where they apply. But someone still has to judge the risk of each function by hand. Engineers judge it differently, and they rarely write it down in a form an inspector can follow. So the shelf-life calculation gets the same depth of testing as the lab news board.

estimated118hof testing to script all requirements of one LIMS module
Where a validation's working days go, to a complete first draftestimated
By hand5 days
With the solution0.4 days
  • Reading the URS, specifications, supplier package and SOC 2 report1 → 0.1 d
  • Grouping requirements into functions and making the risk call1 → 0.1 d
  • Writing the validation plan and test strategy1 → 0.1 d
  • Writing scripts and unscripted charters on the templates1.5 → 0.1 d
  • Building the trace matrix and closing gaps0.5 → 0.1 d

Our estimated split for one new module of a configured GxP system, by hand and with the solution. The dashboard puts a first draft by hand at about 5 working days.

How it works

Each function's risk sets its test: the computer software assurance flow

What comes in
Sources inRequirements + supplier packages · specifications, audit reports, intended use
Agents at work
Requirements Readernumbered requirements
Then
Intended-Use & GxP AssessorGxP impact + category
Function Risk Classifierimpact × likelihood
Then
Vendor Evidence Matcherwhat the supplier proves
Test Strategist & Script Writermethod set by the cell
Then
Trace & Consistency Checkertrace matrix + gaps
A person decides
Validation leaddecides every placement; owner and IT Quality sign
What comes out
Function risk grid with hours
Plan, scripts + trace matrix
Part 11 signed record
One case, step by step

A LIMS stability module placed on the risk grid and signed for testing

A drug maker is adding the stability module of its LIMS at one plant. The module's results support the shelf life given to an injectable product. Go-live is 40 days out. Here is what happens next, screen by screen, in the working solution.

A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.

  1. 01The first morning

    Six sources in, and an empty risk grid

    Validation lead

    The validation opens with its six sources attached. They are the URS, the user requirements specification (38 pages), and the configuration specification (61 pages). Next come the intended use signed by the system owner and the supplier's validation package (312 pages). The last two are the supplier's SOC 2 Type II audit report and the company's CSV/CSA SOP, its written validation procedure. The grid already says how each cell is proven. Where impact and likelihood are both high, full scripts take 6 h. Supplier evidence takes 1.5 h, and a recorded rationale 0.5 h.

    “6 sources in · 42 requirements · 15 functions to place. The agents group the requirements into functions and place each one by impact and likelihood. You decide every placement.”

  2. 02One click

    One click on Place functions, and six agents read 214 pages

    The agents

    First, the Requirements Reader splits the sources into 42 requirements, each anchored to its page. Then the Intended-Use & GxP Assessor records direct use in the quality system, GAMP category 4, a configured product, delivered as SaaS. The Function Risk Classifier places 15 functions. The Vendor Evidence Matcher finds that the supplier package and the SOC 2 report cover 2 functions and 5 requirements. The SOC 2 report's period ended within the accepted window. The functions land on the grid cell by cell.

    “Each function lands in the cell its impact and likelihood point to. The cell sets the method and the hours; nothing is final until you sign.”

  3. 03Seconds later

    Six functions in the high-risk corner, and one decision

    Function Risk Classifier

    Six functions land where impact and likelihood are both high. Four are stability protocol set-up, pull-point schedule calculation, result entry against specification, and flagging results out of specification or out of trend. The other two are the audit trail on result changes and the result import from the chromatography data system. Together they need 36 h of full scripts. Backup, restore and retention, and hosting and installation, rest on supplier evidence. The lab news board needs only a rationale. In all, testing comes to 55.5 h, against 118 h if each requirement were scripted. One function is flagged. User access and roles sits in an unscripted cell, at 73% agent confidence.

    “Our SOP is stricter than the grid here.” The cell says unscripted. But the procedure asks for a script whenever a function controls who can approve GMP results.

  4. 04The lead's call

    The lead follows the SOP and adds a limited script for user access

    Validation lead

    Two options are on screen. The first follows the SOP with a limited script. Its three steps prove that only Reviewers can approve results, for +0.5 h. The second keeps it unscripted and sends an SOP deviation request to IT Quality. The lead takes the recommended option and follows the SOP. The limited script is drafted, and user access moves to scripted, limited. The total becomes 56 h.

    “Decided by you: user access follows the SOP, and a limited script is added.”

  5. 05The plan

    A validation plan drafted from the grid, each section cited

    Test Strategist & Script Writer

    The plan has eight sections, and each cites the passage it rests on. They cover purpose and scope, system and intended use, risk determination, assurance approach, supplier evidence, records, roles and acceptance. The supplier evidence section records 1,146 supplier tests with 0 open deviations and a SOC 2 report with no exceptions. It also says plainly that the company tests its own configuration. Any section can be redrafted, and the plan exports to Word.

    Results are recorded as digital evidence (test logs, system audit trails and exported reports), without screenshots unless a step needs one.

  6. 06Full script

    A full script proves the stability pull windows step by step

    Test Strategist & Script Writer

    A pull point is the date a stability sample is taken out for testing. The pull-point schedule calculation gets a full script because a miscalculated pull window means samples get tested out of window. In that case the stability data behind the shelf life is lost. The script has five steps on the company's template. They test the 3-month pull with its ±7-day window and the 18-month pull with ±14 days. They also check that a start-date change is blocked without a reason. The last checks that the audit trail records the old value, new value and reason when one is given.

    Each step names the requirement it proves. No step is written without one.

  7. 07Unscripted charter

    A mission and a time box in place of 40 screenshots

    CSA engineer

    Sample login and labels is medium impact, medium likelihood. A wrong label is caught by the scan-to-confirm step at the chamber. So it gets a charter, a short written mission for unscripted testing, on the company's charter template. The mission is to explore logging and labeling a full 6-month pull for two conditions, trying wrong-sample scans and reprints. A named CSA engineer has 45 minutes and records notes, issues and a conclusion.

  8. 08Trace matrix

    All 42 requirements trace to their proof

    Trace & Consistency Checker

    Each requirement traces to a script, a charter, supplier evidence or a recorded rationale, with its grid cell and proof id. The first draft had one gap. It was the requirement to keep records and their audit trail for 10 years. The checker closed it with the supplier's SOC 2 retention control C1.1 and a supplier evidence review. In that review, the reviewer confirms that 10-year retention is configured. The matrix filters by method and exports to Excel.

    An untraced requirement blocks signing.

  9. 09Sign as author

    The lead signs as author and states what the signature means

    Validation lead

    The signature covers the validation plan and test strategy and the risk assessment of 15 functions. It also covers the trace matrix of 42 requirements, 9 scripts and 3 charters. The lead chooses the meaning, “I am the author of this validation plan, risk assessment and trace matrix”, and enters a password.

    “Your name, the date and time, and the meaning are recorded with the signature and shown on every exported page.”

  10. 10Signed

    On to the system owner and IT Quality

    System owner and IT Quality

    All five checks before signing are green. Each function is placed with its cited passage, and 42 of 42 requirements are traced. The SOP conflict is decided, supplier evidence is current and the system owner has signed the intended use. The validation moves to QA approval. Next, the system owner signs as reviewer (“I confirm the intended use and every grid placement”). After that, IT Quality approves it for testing. People and agents are on the same audit trail.

    “Signed. Moved to QA approval; the system owner and IT Quality notified.”

Who it’s for

Validation leads, CSA engineers, system owners and IT Quality approvers

Four people author, run, review and approve a validation. Here is each one's work before the risk grid, and with it.

Validation lead
Signs as author
Before
Runs seven validations against go-live dates. Spends weeks on scripts and only minutes on the risk call that decides them.
Now
Opens a grid already placed, with the reason and source for each function. Spends the time on the calls that need a person, such as where the SOP is stricter.
CSA engineer
Runs scripts and unscripted charters
Before
Runs scripts and records evidence step by step. Would rather have a mission and a time box than 40 screenshots.
Now
Gets full scripts only where the risk is. The rest get charters with a mission, focus areas and a 45-minute time box.
System owner
Owns the QC lab system, signs as reviewer
Before
Needs the stability module live by its go-live date, and asks why the team is retesting what the vendor already proved.
Now
Sees backup and hosting rest on the supplier's evidence, confirms the intended use and each grid placement, and signs as reviewer.
IT Quality approver
Approves before testing starts
Before
Approves each validation before testing starts, and needs to see why each function is tested the way it is.
Now
Can change the risk grid and the rules in Settings, and approves a validation in which each placement cites its source.
The agents

The computer software assurance agents behind each placement, script and trace

Requirements and supplier evidence are read and every function placed on a risk grid. The scripts and trace matrix are drafted, and the validation lead decides every placement.

Requirements Reader

Reads the URS, specifications, supplier packages and SOC reports in place, and splits them into numbered requirements with page anchors.

  • Quotes requirements with id and page, and never rewrites them
  • Ignores superseded versions unless asked
Intended-Use & GxP Assessor

States the intended use, GxP impact and GAMP category from the signed intended-use statement and the system inventory.

  • Proposes; the system owner signs the intended use
Function Risk Classifier

Groups requirements into functions and places each on the risk grid by impact and likelihood of failure. Each placement has a one-line reason and the cited passage. It raises a decision when the company SOP is stricter.

  • Every proposal cites a source paragraph
  • Never resolves an SOP conflict; the lead decides
Vendor Evidence Matcher

Matches the supplier validation package and SOC 2 controls to the requirements they already prove, and checks the SOC 2 period against the acceptance window.

  • The SOC 2 period must have ended within the accepted window
  • Customer configuration is never covered by supplier evidence
Test Strategist & Script Writer

Drafts the validation plan on the company templates. Writes full or limited scripts as each function's grid cell asks, and time-boxed charters for the rest.

  • No test step without a requirement
  • Charters always carry a tester and a time box
Trace & Consistency Checker

Builds the requirement-to-test trace matrix, flags gaps, proposes the cheapest sufficient proof to close each one and checks the plan against the risk grid.

  • An untraced requirement blocks signing
Validation lead

Decides every placement.

Ask in plain words

A validation lead's questions on placements, scripts and SOC 2 reports

Ask about any function, risk placement, requirement or source, or say what to change. Each answer points to the passage it rests on. These answers use the sample data.

Why is the pull-point calculation in the full-script cell?

Because it sits at high impact, high likelihood. On impact, a miscalculated pull window means samples tested out of window, and the stability data behind the shelf life is lost. On likelihood, the windows are our own configuration, which the supplier did not test. The full script proves the ±7 and ±14-day windows and the reason-for-change rule in 5 steps.

Is the supplier SOC 2 report still acceptable?

Yes. The period of the supplier's SOC 2 Type II report ended within our 12-month window. Backup and restore (control A1.2) and retention (C1.1) were tested with no exceptions. The supplier package covers the signature engine and installation, but not our configuration.

How is the e-signature on result approval tested?

E-signatures are high process risk and always scripted. The supplier's package already tests the signature engine itself. So our script is a limited one that tests our configuration. It checks the meaning on the report and that no one can approve their own results.

Add a rule: each unscripted charter needs a named tester and a 45-minute time box

Done. Each unscripted charter now needs a named tester and a 45-minute time box, as our SOP asks for unscripted records. The open validations already comply. The rule is on in Settings and recorded in the audit trail.

The screens

Risk grid, scripts, charters and trace matrix in computer software assurance

From the working solution, on its sample data. Pick one to see it large.

The function risk gridFifteen functions placed by their impact on patient safety and product quality against their likelihood of failure. It shows the hours per cell and the one decision the SOP raises.
Sources inThe validation's six sources, its intended use and the grid with the method and hours each cell sets, before placement.
Agents at workEach agent's step runs in view while the functions land on the grid, with the testing effort against scripting all requirements.
The SOP decisionUser access follows the company SOP with a limited script. The function's requirements, reason and cited passage stay beside the grid.
Validation planEight sections drafted from the grid, each with its citations, a redraft per section and export to Word.
A full scriptAction, expected result and the requirement each step proves, on the company script template.
An unscripted charterMission, time box, tester and focus areas for a function that is not high risk.
Trace matrixEach requirement with its function, grid cell, proof and status: 42 of 42, with the closed gap noted.
Sign as authorWhat the signature covers, the signer, the meaning and the password.
Sign & recordChecks before signing, the audit trail of people and agents, and the three signatures.
All validationsNew systems, changes, SaaS releases and spreadsheets, each with its assurance mix, stage, go-live clock and system owner.
DashboardValidations placed, time to a first draft and how functions are proven. It also shows where validation hours go (writing, testing and review) and where people changed the agents' placements.
Your rulesThe method for each grid cell, approved by IT Quality, the risk rules and the supplier evidence window.
Governance

Cited placements and Part 11 signatures behind computer software assurance

Each placement cites its sourceEach function's place on the grid carries a one-line reason, the agent's confidence and the passage it rests on. That passage may be the requirement, the intended use, the supplier package, the SOP or the guidance.
A qualified person decides each placementAgents place and draft. The validation lead decides each placement and can move any function. The system owner confirms the intended use and placements, and IT Quality approves before testing starts.
Where the SOP is stricter, a person decidesWhen the company procedure asks for more than the grid, the agent raises a decision with both options and their sources. It never resolves the conflict itself.
Supplier evidence within its limitsSupplier testing and SOC 2 controls count only when the report period ended within the accepted window. They never count for protocols, specifications, roles or interfaces the company configures.
Signed with name, time and meaningAuthor, reviewer and approver sign electronically with their password. The name, date, time and meaning are recorded with each signature and shown on each exported page. An untraced requirement blocks signing.
One audit trail for people and agentsEach agent step, decision, move and signature is recorded with who, what and when, and cannot be edited. Sources are read in place from the approved version, cited and never copied.
Configuration

The risk grid, the SOC 2 window and the signing rules IT Quality sets

The risk grid and the rules each validation is placed against are settings, approved by IT Quality and on the audit trail. Changing a cell re-places each open validation.

SettingDefaultChoose from
High impact, high likelihoodScripted, full · 6 hScripted, full · Scripted, limited · Unscripted · Supplier evidence · Rationale only, for each of the nine cells
High impact, low likelihoodSupplier evidence · 1.5 hAny of the five methods
Scripted testing for every Part 11 electronic-signature functionOnRequired by the company's CSV/CSA SOP
Raise a decision when our SOP is stricter than the guidanceOnOn · Off
Block signing while any requirement is untracedOnRequired by the company's CSV/CSA SOP
Accept SOC 2 Type II reports whose period ended within12 months6 months · 12 months · 18 months
Customer configuration is always ours to testOnSupplier evidence never covers protocols, specifications, roles or interfaces we configure
ApprovalsAuthor · reviewer · approverValidation lead signs as author, the system owner reviews, IT Quality approves
Connections

URS, supplier packages and the CSV/CSA SOP a validation already uses

Requirements and specificationsURS, functional and configuration specifications, read with their ids from the requirements tool
Supplier evidencevendor validation packages and SOC 2 Type II reports
Intended use and GxP assessmentthe signed intended-use statement and GAMP category
Your CSV/CSA procedurethe company SOP and its script and charter templates
System inventorysystem id, GAMP category and owner from the configuration database
Validation tool exportsigned validations with scripts, charters and the trace matrix
What it changes

Testing hours and draft time with computer software assurance

Each figure carries its label: a target the solution is built to, an estimate, a typical published result, or a proven one.

estimated
53%
fewer testing hours on one LIMS module, 56 h risk-based against 118 h scripting every requirement
Script everything≈ 118 h
Risk grid≈ 56 h
estimated
6of 15
functions get full scripts. The rest are proven by limited scripts, charters, supplier evidence or a rationale
functions with full scripts
target
3.2h
median to a complete first draft of the validation

“demo” means seen in the working solution, on its sample validation data. “target” means the design goal, measured in the live solution. “estimated” means the solution's own estimate on its sample module, or our estimate where noted. The sources are FDA's guidance Computer Software Assurance for Production and Quality System Software (final, September 2025) and ISPE GAMP 5, 2nd edition. The third is 21 CFR Part 11, the FDA rule on electronic records and signatures. Names on the screens are sample data.

Questions

Computer software assurance questions from validation and IT Quality teams

What is computer software assurance?

Computer software assurance (CSA) is the risk-based approach FDA describes in its guidance, Computer Software Assurance for Production and Quality System Software. The guidance became final in September 2025. Scripted testing, full or limited, goes where a function's failure could harm safety. The rest gets unscripted testing, and the supplier's own testing counts where it applies. The Computer Software Assurance solution applies it function by function, on a grid your IT Quality team approves.

How is it different from traditional computer system validation (CSV)?

CSV usually scripts and screenshots each requirement. Here each function is placed on a grid of impact against likelihood of failure, and the cell sets the method and hours. On the sample LIMS module, 6 of 15 functions get full scripts. The plan comes to 56 h of testing, against an estimated 118 h for scripting them all.

How does it use supplier evidence and SOC 2 reports?

A SOC 2 report is an independent audit of a supplier's controls. The Vendor Evidence Matcher links requirements only to supplier tests and SOC 2 controls that prove the same behavior. It also checks that the report period ended within your window, 12 months by default. Functions it covers, such as backup or hosting, get a supplier evidence review. Configuration you own, such as protocols, specifications, roles and interfaces, is always tested by you.

What happens when our SOP is stricter than the guidance?

The agent raises a decision instead of choosing. On the sample module, user access sat in an unscripted cell. But the SOP asks for a script for any function that controls who approves GMP results. The validation lead chose a limited script. The other option was to keep it unscripted and request an SOP deviation from IT Quality.

Does it produce the trace matrix and the validation record?

Yes. It drafts the validation plan, scripts and charters on your templates. It also builds a requirements traceability matrix, where each requirement reaches a script, a charter, supplier evidence or a recorded rationale. The record exports with the audit trail and, once signed, the signature manifest.

Who signs off on a risk placement before testing starts?

Agents place and draft. The validation lead decides each placement and can move any function. The system owner confirms the intended use and placements, and IT Quality approves before testing starts. Each change is on the audit trail, and a validation cannot be signed while a requirement is untraced.

Can we change the grid and the rules?

Yes. The method and hours for each of the nine cells, the SOP-stricter decision, the supplier evidence window, signers, templates and connections are settings. Changing a cell re-places each open validation.

What do we hand over to set it up on our own systems?

Your CSV/CSA procedure, its templates and a sample of past validations. The Agentic Solution Engine builds and deploys it from those requirements and documents, and it goes live once every quality gate has passed. We will walk you through it on one of your own systems first.

Bring your next validation
and see where the scripts go.

We'll run Computer Software Assurance on one of your own upcoming validations.