- Before
- Runs seven validations against go-live dates. Spends weeks on scripts and only minutes on the risk call that decides them.
- Now
- Opens a grid already placed, with the reason and source for each function. Spends the time on the calls that need a person, such as where the SOP is stricter.
A LIMS stability module placed on the risk grid and signed for testing
A drug maker is adding the stability module of its LIMS at one plant. The module's results support the shelf life given to an injectable product. Go-live is 40 days out. Here is what happens next, screen by screen, in the working solution.
A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.
- 01The first morning
Six sources in, and an empty risk grid
Validation leadThe validation opens with its six sources attached. They are the URS, the user requirements specification (38 pages), and the configuration specification (61 pages). Next come the intended use signed by the system owner and the supplier's validation package (312 pages). The last two are the supplier's SOC 2 Type II audit report and the company's CSV/CSA SOP, its written validation procedure. The grid already says how each cell is proven. Where impact and likelihood are both high, full scripts take 6 h. Supplier evidence takes 1.5 h, and a recorded rationale 0.5 h.
“6 sources in · 42 requirements · 15 functions to place. The agents group the requirements into functions and place each one by impact and likelihood. You decide every placement.”
- 02One click
One click on Place functions, and six agents read 214 pages
The agentsFirst, the Requirements Reader splits the sources into 42 requirements, each anchored to its page. Then the Intended-Use & GxP Assessor records direct use in the quality system, GAMP category 4, a configured product, delivered as SaaS. The Function Risk Classifier places 15 functions. The Vendor Evidence Matcher finds that the supplier package and the SOC 2 report cover 2 functions and 5 requirements. The SOC 2 report's period ended within the accepted window. The functions land on the grid cell by cell.
“Each function lands in the cell its impact and likelihood point to. The cell sets the method and the hours; nothing is final until you sign.”
- 03Seconds later
Six functions in the high-risk corner, and one decision
Function Risk ClassifierSix functions land where impact and likelihood are both high. Four are stability protocol set-up, pull-point schedule calculation, result entry against specification, and flagging results out of specification or out of trend. The other two are the audit trail on result changes and the result import from the chromatography data system. Together they need 36 h of full scripts. Backup, restore and retention, and hosting and installation, rest on supplier evidence. The lab news board needs only a rationale. In all, testing comes to 55.5 h, against 118 h if each requirement were scripted. One function is flagged. User access and roles sits in an unscripted cell, at 73% agent confidence.
“Our SOP is stricter than the grid here.” The cell says unscripted. But the procedure asks for a script whenever a function controls who can approve GMP results.
- 04The lead's call
The lead follows the SOP and adds a limited script for user access
Validation leadTwo options are on screen. The first follows the SOP with a limited script. Its three steps prove that only Reviewers can approve results, for +0.5 h. The second keeps it unscripted and sends an SOP deviation request to IT Quality. The lead takes the recommended option and follows the SOP. The limited script is drafted, and user access moves to scripted, limited. The total becomes 56 h.
“Decided by you: user access follows the SOP, and a limited script is added.”
- 05The plan
A validation plan drafted from the grid, each section cited
Test Strategist & Script WriterThe plan has eight sections, and each cites the passage it rests on. They cover purpose and scope, system and intended use, risk determination, assurance approach, supplier evidence, records, roles and acceptance. The supplier evidence section records 1,146 supplier tests with 0 open deviations and a SOC 2 report with no exceptions. It also says plainly that the company tests its own configuration. Any section can be redrafted, and the plan exports to Word.
Results are recorded as digital evidence (test logs, system audit trails and exported reports), without screenshots unless a step needs one.
- 06Full script
A full script proves the stability pull windows step by step
Test Strategist & Script WriterA pull point is the date a stability sample is taken out for testing. The pull-point schedule calculation gets a full script because a miscalculated pull window means samples get tested out of window. In that case the stability data behind the shelf life is lost. The script has five steps on the company's template. They test the 3-month pull with its ±7-day window and the 18-month pull with ±14 days. They also check that a start-date change is blocked without a reason. The last checks that the audit trail records the old value, new value and reason when one is given.
Each step names the requirement it proves. No step is written without one.
- 07Unscripted charter
A mission and a time box in place of 40 screenshots
CSA engineerSample login and labels is medium impact, medium likelihood. A wrong label is caught by the scan-to-confirm step at the chamber. So it gets a charter, a short written mission for unscripted testing, on the company's charter template. The mission is to explore logging and labeling a full 6-month pull for two conditions, trying wrong-sample scans and reprints. A named CSA engineer has 45 minutes and records notes, issues and a conclusion.
- 08Trace matrix
All 42 requirements trace to their proof
Trace & Consistency CheckerEach requirement traces to a script, a charter, supplier evidence or a recorded rationale, with its grid cell and proof id. The first draft had one gap. It was the requirement to keep records and their audit trail for 10 years. The checker closed it with the supplier's SOC 2 retention control C1.1 and a supplier evidence review. In that review, the reviewer confirms that 10-year retention is configured. The matrix filters by method and exports to Excel.
An untraced requirement blocks signing.
- 09Sign as author
The lead signs as author and states what the signature means
Validation leadThe signature covers the validation plan and test strategy and the risk assessment of 15 functions. It also covers the trace matrix of 42 requirements, 9 scripts and 3 charters. The lead chooses the meaning, “I am the author of this validation plan, risk assessment and trace matrix”, and enters a password.
“Your name, the date and time, and the meaning are recorded with the signature and shown on every exported page.”
- 10Signed
On to the system owner and IT Quality
System owner and IT QualityAll five checks before signing are green. Each function is placed with its cited passage, and 42 of 42 requirements are traced. The SOP conflict is decided, supplier evidence is current and the system owner has signed the intended use. The validation moves to QA approval. Next, the system owner signs as reviewer (“I confirm the intended use and every grid placement”). After that, IT Quality approves it for testing. People and agents are on the same audit trail.
“Signed. Moved to QA approval; the system owner and IT Quality notified.”