WorkflowIT & Data

The complete guide · November 2026

Computer software assurance, explained.

When software does part of a job regulators oversee, such as making a medical device or testing a drug, the company has to prove it works for that use. Computer software assurance, or CSA, is FDA's name for doing that proof in proportion to risk: the most evidence where a failure could hurt someone, and far less where it could not. FDA's guidance on it is written for medical device makers, and this guide says exactly where it stops.

This guide is for validation leads, computer system validation (CSV) and CSA engineers, IT quality staff, system owners and quality assurance (QA) approvers at device, drug, biotech and contract manufacturing companies. It also serves leaders deciding whether to automate the paperwork. No background needed.

See one case, screen by screen →
Watch with transcript →
A quick example · fictional

Imagine you are the validation lead at Northwind Bio, a biologics company, which makes you the person who proves its software does its job. Today is October 7, 2026, and you have 40 days. On November 16, the quality control lab at Plant 3 in Leiden goes live on the stability module of Tessarine LIMS 10, its laboratory information management system. The module tracks drug samples aging in storage, and its results will support the shelf life of a drug called Veltrimab.

The module has 42 requirements. Writing a step-by-step test script for each one and screenshotting every step comes to about 118 hours of testing, by your own estimate. The same depth goes to the calculation that sets when samples leave the stability chamber and to the news board on the sign-in page. So you group the requirements into 15 functions and ask of each one how much harm a failure could do. Six end up with robust scripts, FDA's word for its fuller grade of written test.

Script every requirement
Depth
the same for all 42
Testing
about 118 hours
Size each function to its risk
Robust scripts
6 of 15 functions
Testing
about 56 hours
Your grid says no script for user accessYour procedure (SOP), section 6.2, says script itbecause that function controls who can approve good manufacturing practice (GMP) results. You follow the SOP, and record why.

Good assurance work catches the place where a tidy risk score and your own procedure disagree. One more catch: this company makes a drug, so FDA's device guidance is a borrowed method here, and EU GMP Annex 11, Europe's rule for computerized systems in medicine making, is what its inspector will read.

Computer software assurance guide
Part A · Understand it

CSA from FDA's scope line to the inspector's question: what the guidance covers, what binds drug and clinical systems, and how the testing is sized

What FDA issued and for whom, which rules apply if you make drugs or run trials, how to judge high process risk, what each kind of test must leave behind, what supplier evidence can carry, what inspectors cite and how teams work today, explained without selling anything. If you are new to validation, start here.

01 · In plain words

Computer software assurance means testing each software function as hard as its failure could hurt

A device plant checks a weld with a camera and software decides pass or fail. A quality system routes a complaint to the right person. A laboratory system calculates when a stability sample is due. In each case software has taken over part of a regulated job, so the company has to show that the software does that job correctly. Showing it is called validation, and the promise being made is about a specific use: this software, set up this way, for this purpose. That purpose is the intended use.

For years the common way to do this, usually called computer system validation or CSV, gave everything the same treatment. Write a requirement. Write a step-by-step script to prove it. Run it. Take a screenshot of every step. Have someone sign each page. Its weakness is that it spends evenly. A calculation that sets a shelf life and a news board on the sign-in page each get a script, a tester and a reviewer, and the people doing the work can spend more of their week formatting evidence than looking for defects.

Computer software assurance, or CSA, is FDA's name for spending unevenly on purpose. Ask first what the software is used for and what would happen if each function failed. Put the most testing and the fullest record where a failure could compromise safety. Use lighter methods elsewhere, including unscripted testing, where an experienced tester explores with a goal in mind and writes down what was tried and found. Reuse the supplier's proof, and keep digital logs in place of screenshots. FDA's own summary of the idea is that the burden of validation should be "no more than necessary to address the risk".1

Two things are easy to get wrong. CSA asks for better-aimed proof, and a company that uses it to test less without a written reason has made its position worse. And FDA wrote its guidance for medical device production and quality systems. Drug makers, biotechs and clinical teams hear the same idea from other sources in other words, so they may borrow the method, and they should say that they are borrowing it. Most of this guide is about keeping those two things straight.

Five steps that take a software function from intended use to staying validated

  1. Say what it is forThe system owner writes the intended use: this LIMS module manages stability studies and is used directly in the quality system.
  2. Judge each function's riskGroup requirements into functions and ask what a failure of each could do. This step decides everything after it, and it is the step this guide is about.
  3. Choose the proofRobust scripted testing, limited scripted testing, an unscripted test, the supplier's evidence or a written reason, sized to that risk.
  4. Test and keep the recordRun the tests. Keep the intended use, the risk result, what was tested, what was found, who did it and when.
  5. Stay validatedEvery change, patch and supplier release goes back through the same question, for as long as the software is in use.

Steps 2 and 3 are the subject of this guide. The people, company and figures in the example are fictional.

Four things newcomers get wrong about FDA's CSA guidance, starting with who it covers

The guidance has a scope line, and it says devices

It covers systems "used as part of production or the quality management system for medical devices".1 Some of what is written about CSA for pharma skips that sentence. A drug maker can use the same thinking, and has other texts to rest it on (section 3).

FDA asks what is foreseeable, and likelihood is a different question

The analysis "should consider which failures are reasonably foreseeable (as opposed to likely)".1 A rare failure with a serious result still counts, and FDA's example is a power outage. Many risk grids score likelihood anyway, which is allowed if you know what you changed.

FDA's version is newer than most articles about it

The September 24, 2025 final guidance was replaced on February 3, 2026, under a new title, the day after the device quality rule changed.1,2 Advice citing 21 CFR 820.70(i) as today's hook is out of date, because that section is gone.

Europe's draft rule still talks about scripts

The draft revision of EU GMP Annex 11 asks for evidence "in the form of executed test scripts, and where relevant, screen dumps", and has no mention of unscripted testing.3 It is a draft, and it shows why a global SOP needs care.

Learn these first: intended use, high process risk, unscripted test and validated state

Intended use

What this software, or this one function, is used for in your process. The whole risk call starts here, and it differs from the intended use of a device itself.1

High process risk

FDA's phrase for a function whose failure may cause a quality problem that foreseeably compromises safety. Everything else is "not high process risk".1

Unscripted test

A test where the tester's actions are not laid out in advance as written steps. Scenario testing, error guessing and exploratory testing are the three kinds FDA names.1

Validated state

Software held under control throughout its life, so that it stays fit for its intended use after every change.1

Fourteen terms are defined in the one-page summary.

02 · The scope line

Exactly what FDA's computer software assurance guidance covers, and where it stops

In shortFinal guidance, issued February 3, 2026, titled "Computer Software Assurance for Production and Quality Management System Software". It covers computers and automated data processing systems used as part of medical device production or the quality management system. It is written by FDA's device and biologics centers, in consultation with its drug center. It is nonbinding. It does not cover software that is itself a device, and it does not reach drug manufacturing or clinical systems by its own terms.

FDA's CSA text is younger than most advice about it: the current version is dated February 3, 2026
  1. January 2002General Principles of Software Validation

    Section 6 covers production and quality system software, device side.

  2. 2022Draft CSA guidance

    Docket FDA-2022-D-0795.

  3. September 24, 2025First final CSA guidance

    Replaces Section 6 of the 2002 text.

  4. February 2, 2026Device quality rule changes

    21 CFR 820.70 goes; ISO 13485:2016 comes in by reference.

  5. February 3, 2026Current final guidance

    New title, written to the new rule. Supersedes September 2025.

Source 1 4 5 2 6 7

Show the numbers
WhenWhat
January 2002General Principles of Software Validation
2022Draft CSA guidance
September 24, 2025First final CSA guidance
February 2, 2026Device quality rule changes
February 3, 2026Current final guidance

The words that decide whether FDA's CSA guidance is about your system

QuestionWhat the document saysWhat it means for you
Who is it for?Systems "used as part of production or the quality management system for medical devices"1Device manufacturers, including devices regulated by FDA's biologics center. CBER's contact line reads "CBER-regulated devices".
Who wrote it?Prepared by FDA's device center (CDRH) and biologics center (CBER) "in consultation with" its drug center (CDER), the Office of Combination Products and the Office of Inspections and Investigations1The drug center was consulted. Consultation does not extend the scope line to drugs.
What does it hang from?Validation requirements in subclauses 4.1.6, 7.5.6 and 7.6 of ISO 13485, through 21 CFR Part 8201These are device rules. A drug plant's validation duties come from other places.
What is left out?Design and development verification or validation of device software functions: software that is itself a device under section 201(h)1For software in or as a device, use FDA's 2002 guidance and the device software guidances.
What is used as part of production or the quality system?Software automating production, inspection, testing, quality processes or quality records, and support tools such as test tools. Generally out: email, accounting, networking, user authentication, backup and restore, unless they hold quality records1Your first written decision is about scope. FDA recommends you document it.
Does it name AI and cloud?Automation tools, "data analytic tools, artificial intelligence/machine learning tools, and cloud computing" when used as part of production or the quality management system1A cloud quality system, or an AI tool helping with one, needs its own intended-use assessment.
Is it binding?"Contains Nonbinding Recommendations"; you can use another approach that satisfies the rules1The rule binds you. The guidance shows one accepted way to meet it.
FDA's guidance speaks directly to device production and quality systems, and to everything else only by analogy, if at all

Which text speaks to which system. A drug plant's LIMS has its own rules, and FDA's CSA text is a method it may borrow.

Does not reach itAnalogy onlySpeaks to it
FDA CSA guidancePart 820 and ISO 13485Part 211 and FDA's 2018 Q&AEU GMP Annex 11ICH E6(R3) section 4US device plant: production or quality systemSpeaks to itSpeaks to itDoes not reach itDoes not reach itDoes not reach itSoftware that is itself a deviceDoes not reach itSpeaks to itDoes not reach itDoes not reach itDoes not reach itEU drug plant: lab or production systemAnalogy onlyDoes not reach itDoes not reach itSpeaks to itDoes not reach itUS drug plant: lab or production systemAnalogy onlyDoes not reach itSpeaks to itDoes not reach itDoes not reach itClinical trial data systemAnalogy onlyDoes not reach itDoes not reach itDoes not reach itSpeaks to itEmail or accounting softwareDoes not reach itDoes not reach itDoes not reach itDoes not reach itDoes not reach it

Our reading of the sources 1 8 9 10 11

Show the numbers
FDA CSA guidancePart 820 and ISO 13485Part 211 and FDA's 2018 Q&AEU GMP Annex 11ICH E6(R3) section 4
US device plant: production or quality systemSpeaks to itSpeaks to itDoes not reach itDoes not reach itDoes not reach it
Software that is itself a deviceDoes not reach itSpeaks to itDoes not reach itDoes not reach itDoes not reach it
EU drug plant: lab or production systemAnalogy onlyDoes not reach itDoes not reach itSpeaks to itDoes not reach it
US drug plant: lab or production systemAnalogy onlyDoes not reach itSpeaks to itDoes not reach itDoes not reach it
Clinical trial data systemAnalogy onlyDoes not reach itDoes not reach itDoes not reach itSpeaks to it
Email or accounting softwareDoes not reach itDoes not reach itDoes not reach itDoes not reach itDoes not reach it
How to write this down. If you make drugs and like the method, say so in plain words: "Our procedure applies risk-based assurance under Part 211, FDA's 2018 data integrity guidance, Annex 11, ICH Q9(R1) and GAMP 5. We have also read FDA's device guidance on computer software assurance and use its test methods as an analogy." An inspector who reads "per FDA CSA guidance" in a drug plant's SOP may ask how a device guidance came to govern it. Section 3 explains each of those texts.

As of November 3, 2026, we found no counterpart to this guidance issued by CDER, FDA's drug center. Its July 2026 guidance agenda does list a planned document, "Computer Software Assurance for AI-Based Systems in Drug Manufacturing and Clinical Investigations; Supplemental Guidance". The title is all that can be read: no text is published, and CDER says it is not bound to issue what the agenda lists.12

Combination products sit in between. A single-entity or co-packaged product can show compliance with each set of good manufacturing practice rules for its parts, or follow the streamlined route in 21 CFR 4.4, which starts from either drug or device rules and adds specified provisions of the other.13 The Office of Combination Products was consulted on the guidance, and the guidance does not say how it applies to them.1 Ask your regulatory group which operating system you declared. Then say whether CSA applies directly or by analogy to the system in question.

03 · Drug and clinical rules

If you make drugs or run trials: the texts that already ask for validation in proportion to risk

In shortDrug and clinical teams do not need FDA's device guidance to size validation by risk. FDA's own drug data integrity guidance says validation should be in proportion to the risk. EU GMP Annex 11 says decisions on the extent of validation should rest on a documented risk assessment. ICH Q9(R1), the international guideline on quality risk management, sets the same logic, and ICH E6(R3), the international trial guideline, and FDA's 2024 questions and answers set it for trials. Use those as your authority, and treat CSA as a useful analogy.

Text and status, November 2026ReachesWhat it says on proportion
Drugs, United States
21 CFR 211.68, in force8Finished drug manufacturingInput and output checks at a "degree and frequency" based "on the complexity and reliability" of the system. Changes only by authorized people. Backups exact, complete and secure.
FDA data integrity Q&A, final December 20189Drug manufacturing"The extent of validation studies should be commensurate with the risk posed by the automated system." Each CGMP workflow is an intended use to be checked.
21 CFR Part 11, in force, and FDA's 2003 scope guidance14,15Electronic records required by any FDA rule11.10(a) requires validation. The guidance recommends basing the approach "on a justified and documented risk assessment".
Drugs, Europe
EU GMP Annex 11, revision of January 2011, the version on the Commission's list10,16Computerised systems in GMP activities"Decisions on the extent of validation and data integrity controls should be based on a justified and documented risk assessment."
Draft Annex 11, consultation July 7 to October 7, 2025, still a draft3,17,16If adopted, all computerised systems in making medicines and active substancesScope and extent based on a risk assessment "of individual requirements", considering product quality, patient safety and data integrity. Asks for test scripts (section 8).
All good practice work
ICH Q9(R1), final January 18, 2023; FDA May 202318,19Drug quality systems"The level of effort, formality and documentation of the quality risk management process should be commensurate with the level of risk."
ISPE GAMP 5, 2nd edition, July 2022, an industry guide20GxP computerized systems. FDA's CSA guidance lists it as a further resource.1Critical thinking by experienced people, more use of supplier work, and iterative methods. Discusses FDA's CSA activity.
Clinical trials
ICH E6(R3), final January 202511Systems used in clinical trialsValidation "should be based on a risk assessment" of intended use, the data's importance and the effect on participants and results (section 4.3.4).
FDA electronic systems Q&A, final October 202421Clinical investigations"We recommend that regulated entities use a risk-based approach for validating the electronic systems they deploy" (question 7). It does not mention computer software assurance.
EMA computerised systems guideline, March 9, 202322Systems and data in EU clinical trialsSets expectations for validating, and keeping records on, the systems used in EU trials.

A qualified MES platform can still make a wrong batch record: FDA's point about workflows

The most useful sentence for a drug plant is one FDA wrote eight years ago. Qualifying a manufacturing execution system (MES) platform, the software that runs production, "ensures that it meets its relevant requirements and specifications; however, it does not demonstrate that a given MPCR generated by the MES contains the correct calculations."9 An MPCR is a master production and control record, the approved instructions for making a batch. Replace MES with LIMS and master record with stability protocol, and you have the reason why configuration stays yours to test, whatever your supplier proved.

The same answer says that controls for a system validated for intended use "address software, hardware, personnel, and documentation".9 That is why a clean test result alone does not close a validation.

Say this, at a drug plant
Authority
Part 211, 2018 Q&A, Annex 11, Q9(R1)
Method
GAMP 5, with CSA's test types as an analogy
Avoid this
Authority
"Per FDA's CSA guidance"
Reader's question
Which of your products is a device?
04 · FDA's risk test

How FDA separates high process risk from the rest, and why a human check moves the line

In shortFDA asks one question of each feature, function or operation: if it failed, could that cause a quality problem that foreseeably compromises safety? Yes makes it high process risk, and the testing is then scaled to the harm a device could do. No makes it not high process risk, and the testing is scaled to the process. A later check by a qualified person can move a function from one side to the other, and FDA's example shows how.

FDA's framework runs from intended use to a record, and the risk question comes second
  1. 1Name the intended use

    Is this function used as part of production or the quality system, directly or in support? Document the decision.

    System ownerFirst
  2. 2Ask the risk question

    Could a failure foreseeably compromise safety? High process risk, or not.

    Validation leadPer function
  3. 3Choose the activities

    Rigor scaled to device risk when high, to process risk when not. Scripted, unscripted or both.

    Validation leadPer function
  4. 4Count what already protects you

    Supplier work, later inspections, monitoring and process controls can lower the extra effort.

    Validation and QAPer function
  5. 5Keep the record

    Intended use, risk result, what was tested, issues, conclusion, who and when.

    Tester and reviewerAlways

Our reading of the sources 1

Show the numbers
StepWhat happensWhoTime
Name the intended useIs this function used as part of production or the quality system, directly or in support? Document the decision.System ownerFirst
Ask the risk questionCould a failure foreseeably compromise safety? High process risk, or not.Validation leadPer function
Choose the activitiesRigor scaled to device risk when high, to process risk when not. Scripted, unscripted or both.Validation leadPer function
Count what already protects youSupplier work, later inspections, monitoring and process controls can lower the extra effort.Validation and QAPer function
Keep the recordIntended use, risk result, what was tested, issues, conclusion, who and when.Tester and reviewerAlways

What FDA lists as generally high process risk, and what it lists as generally not

Generally high process risk1Generally not high process risk1
Maintaining process parameters, such as temperature or pressure, identified as essential to device safetyCollecting and recording process data for monitoring and review, with no direct effect on production
Measuring, inspecting or determining acceptability with limited or no human reviewCorrective and preventive action (CAPA) routing, complaint logging, change control management, procedure management
Adjusting parameters from automated feedback without human reviewManaging data, automating an existing calculation, increasing monitoring, alerting on an exception
Producing instructions for use or labeling needed for safe operationSoftware that supports production or the quality system, such as test tools
Automating surveillance or tracking of data identified as essential to safety and qualityAny function whose failure causes no quality problem, or one that does not foreseeably reach safety

FDA's best teaching case is a pair of similar features. An enterprise resource planning system automates restocking of materials. In the first example a qualified person checks materials before use, so wrong materials should be rejected, and the manufacturer calls it intermediate, which FDA treats as not high. In the second, a similar feature in another such system also automates the check, no qualified person looks first, and the manufacturer calls it high process risk.1 The job is much the same in both, and the process around it sets the risk.

A later human check moves a similar feature from the top of the risk picture to the bottom

FDA's own examples, placed by our reading. FDA's text uses high and not high; positions show the reasoning and carry no measured value.

Foreseeable effect on safety →
High: most rigor
Test the check
Look closer
Lighter methods
Essential parameterAccept, no reviewRestock, no checkRestock, checkedCAPA routingRecords data
How much a later check would catch →

Our reading of the sources 1

Show the numbers
ItemHow much a later check would catch (0–1)Foreseeable effect on safety (0–1)
Essential parameter0.100.78
Accept, no review0.140.67
Restock, no check0.180.57
Restock, checked0.780.29
CAPA routing0.660.19
Records data0.800.10

Three places a common risk grid drifts from FDA's wording

FDA saysA typical grid doesWhat to do about it
"Reasonably foreseeable (as opposed to likely)"1Scores likelihood of failure, sometimes after counting supplier testingKeep the axis if your procedure wants it. Never let "unlikely" lower a function FDA would still call high, unless a control you can name is what lowers it, and write that control down.
A binary presentation: high and not high; more levels are allowed, and "moderate" or "low" then fall under the not-high text1Three levels each way, nine cellsFine for planning. In a device record, say which cells are high process risk in FDA's sense.
Risk analysis of the software is distinct from ISO 14971 device risk analysis1Reuses the device risk file's severity scores as if they settled the matterUse device risk as the input to how much rigor a high process risk needs, after the process question is answered.
Reading this on a drug system. None of those three is a rule for a drug plant, since FDA's text is written for devices. ICH Q9(R1) and Annex 11 let you choose your tool, including a likelihood score, so long as the assessment is justified and documented.18,10 The drift matters there only if your SOP claims to follow FDA's guidance word for word.
05 · Test types

Scripted, limited, scenario, error guessing, exploratory: what each test is and what it must leave behind

In shortFDA's Table 1 gives five worked examples. Every one, including an exploratory session with no step-by-step plan, ends in a record with the intended use, the risk result, what was tested, the issues found, a conclusion and who did it when. Unscripted testing is lighter on planning. It carries the same duty to record the result.

FDA's table names two grades of scripted testing, and this guide uses its words: robust and limited. FDA says "a more robust scripted testing" is one where the test cases and evidence "may include detailed requirements for repeatability, traceability, or auditability".1 "Robust" here names that grade and says nothing about quality, and you will see the same word on screens in Part B.

For high process risk FDA says you "may choose to consider" scripted testing or a mix of scripted and unscripted; for the rest, unscripted methods may be suitable. It also says those pairings are not exclusive. Unscripted testing may suit a high-risk function better, and a manufacturer may find an automated script more effective and efficient for a function that is not high risk.1

MethodWhat the tester doesAn example in a stability module: a drug lab's system, so FDA's methods by analogy
Robust scripted testingFollows written step-by-step cases with expected results, for each case a resultEnter a storage start date of October 1, 2026, and check that the 3-month pull is due January 1, 2027, window December 25 to January 8
Limited scripted testingFollows fewer cases, and names any unscripted testing addedThree steps proving only reviewers can approve a result, resting on the supplier for the signature engine itself
Scenario (FDA: also called ad hoc)Works through sequences of interactions a real user would makeLog in a full 6-month pull for two storage conditions, start to finish
Error guessingDesigns tests from past failures or known failure typesScan a label from another time point. Print the same label twice.
ExploratoryDesigns and runs tests on the spot, toward stated objectives with pass and fail criteriaExplore the dashboard against a physical count of one chamber shelf, within 30 minutes
Every test type in FDA's table ends in a named result and a person, and only the two scripted ones need written steps

From FDA's Table 1, Examples of Assurance Activities and Records. Each record also carries the intended use, risk result, issues found and a conclusion.

Not askedAsked
Step-by-step casesExpected resultsPass or fail objectivesResult per caseDetailed reportSummary of testingWho and whenRobust scripted testingAskedAskedNot askedAskedAskedNot askedAskedLimited scripted testingAskedAskedNot askedAskedNot askedAskedAskedScenario testingNot askedNot askedNot askedNot askedNot askedAskedAskedError guessingNot askedNot askedNot askedNot askedNot askedAskedAskedExploratory testingNot askedNot askedAskedNot askedNot askedAskedAsked

Our reading of the sources 1

Show the numbers
Step-by-step casesExpected resultsPass or fail objectivesResult per caseDetailed reportSummary of testingWho and when
Robust scripted testingAskedAskedNot askedAskedAskedNot askedAsked
Limited scripted testingAskedAskedNot askedAskedNot askedAskedAsked
Scenario testingNot askedNot askedNot askedNot askedNot askedAskedAsked
Error guessingNot askedNot askedNot askedNot askedNot askedAskedAsked
Exploratory testingNot askedNot askedAskedNot askedNot askedAskedAsked

We found no study in regulated software on whether unscripted testing finds as many defects as scripted. One academic experiment, with 51 students testing a text editor, found no difference in defect detection between exploratory and test-case-based testing, less design effort for exploratory testing, and more false defect reports from test cases. It also found a weakness in each: choosing the right level of detail for test cases, and designing and logging exploratory sessions. Its authors add that test cases have other benefits for managing testing in large organizations.23

We read the abstract only, and students on a text editor tell you little about a LIMS. So measure your own: count the defects each method finds on your next validations (section 21).

What an unscripted record looks like. FDA prints one. A spreadsheet that graphs nonconformance data, not high process risk because other controls stop bad product, gets rapid exploratory testing. The record lists the intended use, the risk reasoning, the version, five objectives with pass or fail, one deviation (text typed into a numeric field), the fix, the conclusion, the date and the tester.1 It fits on a page, and a reader can follow every step of the reasoning.
06 · A worked grid

From 118 hours to 56 on one LIMS module: the arithmetic of a nine-cell risk grid

In shortThis worked example is fictional and the hours are the company's own planning estimates. Scripting all 42 requirements at about 2.8 hours each comes to about 118 hours. Grouping them into 15 functions and letting a nine-cell grid set the method comes to 55.5 hours. One procedural decision adds half an hour, for 56 hours. The grid is this company's chosen method, built on impact and likelihood, and FDA's text does not prescribe it.

118 hours

to script all 42 requirements: 42 × 2.8 hours, rounded.

Fictional example's estimate
56 hours

when each of 15 functions gets the method its cell sets, after one decision.

Fictional example's estimate
53%

less planned testing: (118 − 56) ÷ 118, about 52.5%.

Our arithmetic on the example
Impact, down · likelihood of failure, acrossLow: supplier-tested, a standard feature not configuredMedium: standard feature with own configurationHigh: configured or built in-house, new, or crossing an interface
High: a failure could reach a patient, a release or a shelf-life decisionSupplier evidence, 1.5 h each: backup, restore and retention; hosting and installationLimited script, 3 h each: shelf-life regression and report; e-signature on result approvalRobust script, 6 h each: stability protocol set-up; pull-point schedule calculation; result entry against specification; out-of-specification and out-of-trend flagging; audit trail on result changes; chromatography result import
Medium: disrupts GxP work; a later control catches itUnscripted, 2.5 h: pull reminders and escalationUnscripted, 2.5 h each: sample login and labels; user access and rolesLimited script, 3 h: none in this module
Low: no effect on product quality or GxP recordsWritten reason only, 0.5 h: lab news boardWritten reason only, 0.5 h: noneUnscripted, 2.5 h: chamber inventory dashboard
Six high-risk functions take 36 of the 56 hours, which is the point of the grid
Robust scripts, 6 functions36 hours
Limited scripts, 3 functions9 hours
Unscripted, 3 functions7.5 hours
Supplier evidence, 2 functions3 hours
Written reason, 1 function0.5 hours

Fictional example from this guide

Show the numbers
ItemValue
Robust scripts, 6 functions36 hours
Limited scripts, 3 functions9 hours
Unscripted, 3 functions7.5 hours
Supplier evidence, 2 functions3 hours
Written reason, 1 function0.5 hours
Nine of 15 functions still get a script after the risk call
Robust script: 6Limited script: 3Unscripted: 3Supplier evidence: 2Written reason: 1
15functions
  • Robust script6
  • Limited script3
  • Unscripted3
  • Supplier evidence2
  • Written reason1

Fictional example from this guide

Show the numbers
PartValue
Robust script6
Limited script3
Unscripted3
Supplier evidence2
Written reason1

How the example adds up, and the half hour one SOP clause adds

Add the cells of the first pass, left to right and top to bottom. High impact: 2 functions × 1.5 hours is 3; 2 × 3 is 6; 6 × 6 is 36. Medium impact: 1 × 2.5 is 2.5; 2 × 2.5 is 5. Low impact: 1 × 0.5 is 0.5; 1 × 2.5 is 2.5. So 3 + 6 + 36 + 2.5 + 5 + 0.5 + 2.5 = 55.5 hours. The two charts above show the plan after the decision that follows, so their limited scripts include one more function.

Then the procedure speaks. User access and roles sits in a 2.5-hour unscripted cell, because roles come from a directory and are reviewed each quarter, so a wrong role would be caught by a procedural control. The company's SOP section 6.2 says any function that controls who may approve GMP results gets a scripted test, whatever the risk result. A three-step limited script at 3 hours replaces the charter, the short brief an unscripted test would have run from. That adds 0.5 hours, for 56.

A good grid raises this kind of disagreement in the open. Reading the same function through FDA's list would give another answer again, because FDA names user authentication among the infrastructure generally outside the validation duty.1 For a drug plant that reasoning does not apply, and draft Annex 11 names "access privileges" among the things to test with increased focus.3 This is why the method belongs in your SOP, and the source of each rule in your SOP should be named.

Where the savings come from. Half of those hours fall away because of a decision about method, and that decision costs nothing but thought. A team using a spreadsheet can get the same result. Software earns its place in the writing, the tracing and the record, which section 18 keeps separate in the sums.
07 · Supplier evidence

What a supplier's test package and SOC 2 report can carry, and what stays yours to test

In shortFDA, Annex 11 and GAMP 5 all let you build on what a supplier has done, after you assess the supplier by risk. A SOC 2 Type II report tells you about the supplier's controls over its service. A supplier's test package tells you about the product as supplied. Neither says anything about your configuration or your intended use. The responsibility stays with you.

FDA says a device maker "could incorporate the software development practices, validation work, and electronic information already performed by developers of the software as the starting point", and that for some lower-risk functions "this may be all the assurance that is needed".1

FDA lists what a vendor assessment may consider: onsite audits where feasible, Service Organization Controls reports and ISO certifications, development and security practices, and the vendor's data integrity controls.1 Annex 11 says the need for an audit "should be based on a risk assessment" and that documentation supplied with commercial products should be reviewed "to check that user requirements are fulfilled".10

The draft Annex 11 puts the limit bluntly: relying on a vendor "does not change the requirements", the regulated user "remains fully responsible", and it should "carefully consider whether it covers the implemented version" and supports company processes "as is".3

Supplier evidence is strong for what the supplier built and says little about what you configured

Our reading of how each kind of evidence supports each kind of function. Your own assessment of your own supplier decides.

Says littleCan supportMain proof
Supplier test packageSOC 2 Type II reportYour own testingAudit-trail engine, as suppliedMain proofSays littleCan supportE-signature engine, as suppliedMain proofSays littleCan supportHosting and change controlCan supportMain proofSays littleBackup and restoreCan supportMain proofCan supportYour specifications and calculation windowsSays littleSays littleMain proofYour roles and who may approveSays littleSays littleMain proofYour interfaces to other systemsSays littleSays littleMain proof

Our reading of the sources 1 10 3

Show the numbers
Supplier test packageSOC 2 Type II reportYour own testing
Audit-trail engine, as suppliedMain proofSays littleCan support
E-signature engine, as suppliedMain proofSays littleCan support
Hosting and change controlCan supportMain proofSays little
Backup and restoreCan supportMain proofCan support
Your specifications and calculation windowsSays littleSays littleMain proof
Your roles and who may approveSays littleSays littleMain proof
Your interfaces to other systemsSays littleSays littleMain proof

SOC 2 explained for a validation team, in four plain statements

StatementWhat it means for your validation
It is an auditor's report on a service organization's system-level controls, under criteria for security, availability, processing integrity, confidentiality and privacy24It tells you about how the supplier runs its service. It was not written against your requirements.
Type II looks at a period. The auditor judges whether controls were operating effectively over a specified time period,25 so a report ending June 30 says nothing direct about OctoberSet an acceptance window in your procedure. If your window needs cover for the months since the report ended, ask for a bridge letter: the supplier's own signed statement, which no auditor has tested.26
Criterion numbers are general. A1.2 concerns recovery infrastructure, and C1.1 concerns identifying and keeping confidential information27A retention control filed under C1.1 proves how the supplier keeps records. You still check your own retention setting, and whether it meets your rule. AICPA posted proposed 2027 criteria for comment on October 26, 2026, so note which edition a report uses.24
It reports exceptions and leaves judgment to youRead the exceptions and the complementary controls the supplier expects you to run.25 A clean opinion does not end the review.

Backup is outside FDA's validation duty in one reading and on Annex 11's test list in another

FDA generally treats software for "continuity of operations (e.g., backup and restore)" as infrastructure, outside the validation duty, unless it stores quality records, in which case effort goes to the integrity of those records and Part 11.1 Annex 11 says the "ability to restore the data should be checked during validation and monitored periodically".10 The drug rule also asks that backup data be "exact and complete" and secure.8 A device maker and a drug maker reading the same supplier report may reach different plans, and both can be right. Write down which rule you are answering.

The test of a supplier claim. Ask three things. Does it cover the version you run? Does it cover the function as you configured it? Does it prove the same behavior your requirement asks for? A yes to all three means a recorded review may be enough. Anything else goes back to your own test list.
08 · The record

Screenshots, system logs and trace matrices: the validation record FDA and draft Annex 11 expect

In shortFDA recommends digital records such as system logs and audit trails "as opposed to paper documentation, screenshots, or duplicating results". The draft Annex 11 asks for executed test scripts and, where relevant, screen dumps, with every test traced to a requirement. A global company needs one SOP that satisfies both, which usually means a fuller record for GMP systems in the EU. Part 11's enforcement discretion does not cover device quality system validation.

An inspector should be able to follow one line from the requirement to the signature
  1. 1Requirement

    What the function must do, with an id and its source.

    System ownerURS
  2. 2Risk result

    The cell or category, the reason and who decided.

    Validation leadPlan
  3. 3Activity

    The script, charter, supplier review or written reason.

    EngineerTest
  4. 4Result

    Pass or fail, issues found and how each was resolved.

    TesterRun
  5. 5Conclusion

    Accepted for the intended use, with any remaining risk stated.

    ReviewerReport
  6. 6Signature

    Name, date and time, and what the signature means.

    ApproverClose

Our reading of the sources 1 10 3

Show the numbers
StepWhat happensWhoTime
RequirementWhat the function must do, with an id and its source.System ownerURS
Risk resultThe cell or category, the reason and who decided.Validation leadPlan
ActivityThe script, charter, supplier review or written reason.EngineerTest
ResultPass or fail, issues found and how each was resolved.TesterRun
ConclusionAccepted for the intended use, with any remaining risk stated.ReviewerReport
SignatureName, date and time, and what the signature means.ApproverClose

The same evidence question, read against FDA's guidance and the draft EU text

PointFDA's CSA guidance, final, devices1Draft Annex 11, a draft, medicines3
Form of evidenceSystem logs, audit trails and other digital records, in place of paper, screenshots or duplicates"Executed test scripts, and where relevant, screen dumps" (9.4)
Unscripted testingNamed as a method to consider where it suits the risk, with examples of recordsNot mentioned. Tests "according to approved plans, protocols and test scripts", detailed enough to be repeatable (9.7)
TraceabilityNamed among tools and scripted test evidence; "requirement traceability tools"Tests not traceable to a requirement "do not meet the requirements" (9.5)
What gets the most focusHigh process risk featuresAccess privileges, release of products and results, calculations, audit trails, error handling, alarms, boundary and negative testing, reports, interfaces, restore from backup (9.6)
Supplier documentsA starting point, sometimes enough for lower riskMay be used "in parts or in whole"; the regulated user "is fully accountable" (9.9)

Annex 11 itself, the January 2011 revision on the Commission's list, says "evidence of appropriate test methods and test scenarios should be demonstrated", and user requirements "should be traceable throughout the life-cycle".10,16

Where Part 11 enters a validation record, and what FDA's 2003 discretion leaves out

Part 11 sets the conditions under which FDA treats electronic records and signatures as equivalent to paper.1 Section 11.10(a) asks for validation of systems "to ensure accuracy, reliability, consistent intended performance, and the ability to discern invalid or altered records".14 Section 11.50 asks a signed electronic record to show the signer's printed name, the date and time, and the meaning of the signature.28

FDA said in 2003 that it would use enforcement discretion, meaning it would choose not to enforce, on some of those validation points, and recommended a risk-based approach.15 The CSA guidance adds a limit: that discretion "expressly does not apply" to validation of production or quality system software under ISO 13485.1

Both Part 11 and data integrity expectations apply to the validation record itself, once it exists in electronic form. FDA's example: documents showing that a system correctly automates checking materials are evidence for a validated state, so Part 11 generally applies to them. A routine activity log that is not needed as such evidence falls outside Part 11.1

MHRA's data integrity guidance adds the ALCOA test that records be attributable, legible, contemporaneous, original and accurate.29 A screenshot is one way to meet that. An audit trail with the same facts can be another, if your procedure and your inspector's reading allow it.

A practical rule for a mixed site. Write one assurance SOP with two evidence profiles: a device profile that reaches for digital records and unscripted testing as FDA describes, and a medicines profile that keeps approved plans, executed scripts and an explicit trace for critical functions. Review the second profile when the Annex 11 revision is published.
09 · Citations

What FDA inspectors cite on computer systems: 110 drug citations in fiscal 2025, most of them about access

In shortBy our sum of FDA's rows, 21 CFR 211.68(b) drew 110 citations on drug Form 483s, the lists of observations an FDA inspection produces, in fiscal 2025, the sixth most cited paragraph. Most of those concern who can change records, more than validation as such. Device software validation under the old 820.70(i) drew 20. Warning letters show the same pattern: shared logins, deleted data and missing audit trails on the drug side, and unvalidated inspection or quality software on the device side.

Computer system citations fell in fiscal 2020 and 2021, then climbed back, with drug citations highest in fiscal 2025

Sums of FDA's rows for 21 CFR 211.68(b) on drug forms and 21 CFR 820.70(i) on device forms, by fiscal year. Our sums.

Drugs, 21 CFR 211.68(b)Devices, 21 CFR 820.70(i)
05010015011020
FY18FY19FY20FY21FY22FY23FY24FY25

Source 30

Show the numbers
Drugs, 21 CFR 211.68(b)Devices, 21 CFR 820.70(i)
FY189328
FY1910241
FY205711
FY21416
FY228317
FY238121
FY248029
FY2511020
Computer controls were the sixth most cited drug paragraph in fiscal 2025

Citations per paragraph on drug Form 483s, by our sum of FDA's rows. 713 drug forms were issued from FDA's system that year.

211.22(d) quality unit procedures243
211.192 investigations236
211.100(a) written procedures169
211.160(b) laboratory controls149
211.84(d) testing of components136
211.68(b) computer controls110
211.113(b) sterile contamination105

Source 30

Show the numbers
ItemValue
211.22(d) quality unit procedures243
211.192 investigations236
211.100(a) written procedures169
211.160(b) laboratory controls149
211.84(d) testing of components136
211.68(b) computer controls110
211.113(b) sterile contamination105
How to read these numbers. FDA says the files are "not a comprehensive listing of all inspectional observations" and that some forms made by hand are left out.30 Of the 110 drug citations in fiscal 2025, 87 sit in one row about authorized changes to records, so most of the count concerns access. Just 2 are about a written record of the program and its validation data. Fiscal 2025 ended September 30, 2025, before the device quality rule changed, and fiscal 2026 data is not yet out. The file gives the counts and no reasons, so we offer none for the dip.

Two drug letters, two device letters and a Form 483: what each says about computer systems

RecordWhat FDA wroteWhat it teaches
Drug laboratory, warning letter, April 14, 202631One shared username and password on chromatography equipment. "Analysts had administrator privileges to modify and delete data." Deleted sequences found in the recycle bin. FDA asks for an assessment of each lab computer system, including its "qualification/validation status"Inspectors start at access and audit trails, and then ask for validation status.
Drug manufacturer, warning letter, May 22, 202632An instrument "was not adequately qualified because you failed to validate the control software". Audit trails not enabled, missing data files, no backup on that computer. The response had no timeline for validationLaboratory instrument software counts, and a promise to validate later needs a date.
Device maker, warning letter, October 18, 202433X-ray quality control software used for final tests, not validated for its intended use according to an established protocol, under 820.70(i). The response gave no supporting documentsSoftware deciding a final test is the plain case of high process risk.
Device maker, warning letter, May 9, 202534Inspection software "was installed many years ago and has not been validated", though the firm's own procedure required it. In a demonstration "the software was not performing as it should". Cited under 820.75(a)An old system with no record is a finding, and the firm's own SOP is the yardstick.
Device importer, Form 483, December 4, 202535The firm "has not validated Microsoft and cloud storage systems" used in the quality system. An observation by an investigator, and no final Agency determinationEveryday office and cloud tools can come into scope when they hold quality records.

These records are cited for what they say, and none of them rests on computer software assurance. The two device letters predate the first final guidance, and the Form 483 predates the new quality rule.

These five records point at missing basics: what that means for risk-based testing

Read together, the records make an awkward point for anyone selling less testing. Each of those firms fell short on something more basic than the amount of testing a risk grid sets: no validation at all, no audit trail, no unique logins, or no record. The first gain from CSA is that a team has time to look at the oldest instrument PC in the laboratory, a system nobody put on the list.

Patient impact sits behind each of these. When a stability pull is missed, the data behind a shelf life is lost. When results can be changed without a trace, a release decision rests on something nobody can check.

10 · Common errors

How CSA programs go wrong: testing less with no reason, trusting the platform and losing the validated state

In shortThe expensive mistakes come from misreading the method more than from weak testing: citing the guidance outside its scope, removing scripts with no written risk call, treating a supplier's report as validation, running unscripted sessions with no record, and validating once and forgetting. Software releases are where a validated state can slip away.

The errorWhy it happensWhat prevents it
Citing FDA's CSA guidance for a drug or clinical system as the authoritySome articles and vendor pages drop the scope lineName your binding rule, and call CSA an analogy (section 2)
Cutting scripts with no written risk resultCSA is heard as "test less"No method without a recorded reason. FDA asks for the risk result in every record.1
Scoring failures as unlikely and dropping themLikelihood feels objective, and rare events look smallAsk what is foreseeable first, and name the control that lowers it1
Treating a SOC 2 report or supplier package as validationThe report is long and cleanMatch evidence to a requirement, a version and a behavior. Configuration stays yours.9,3
Unscripted testing with no record"No script" is heard as "no paperwork"A charter with a goal, a tester, a time box, issues and a conclusion1
Writing a global SOP to one regulatorTeams follow the loudest guidanceSeparate evidence profiles for device and medicines systems (section 8)
An SOP left stricter than the method, with nobody noticingThe risk template changes while the SOP staysCheck each result against the SOP, and raise each conflict to a named person
Spreadsheets and instrument PCs left off the inventoryNobody thinks of them as systemsAnnex 11 asks for an up-to-date inventory.10 FDA's guidance works through spreadsheet formulas.1
Testing against draft specifications that later changeThe go-live date is fixed and the specification is notReopen what a change touches. Date and version every cited source.

How a quarterly cloud (SaaS) release stays validated, one change at a time

Cloud systems change on the supplier's calendar, often several times a year. Each release is a small validation question: what changed, which of our functions does it touch, and what proof does that need? FDA says to apply the same risk analysis to changes. For devices with approved applications, a software change that could foreseeably compromise safety goes in a 30-day notice, and others may go in an annual report.1

Annex 11 says changes to systems, including configurations, should be made "in a controlled manner" and that systems "should be periodically evaluated to confirm that they remain in a valid state".10 The draft adds that contracts should agree "the process for release of new system versions".3

A supplier release should reach only the functions it touches

A fictional quality system release: 14 requirements across 9 functions, 2 of them high risk.

  1. 1Release notes arrive

    The supplier publishes notes 30 days before release.

    SupplierDay 0
  2. 2Map the changes

    Each change is matched to validated functions.

    Validation engineerDay 2
  3. 3Re-place what moved

    A changed due-date rule goes high. A new search filter stays low.

    Validation leadDay 3
  4. 4Prove and record

    Scripts for high-risk changes, charters for the rest, a supplier review for the platform.

    Engineer and QADays 5 to 25
  5. 5Release day

    Records signed before the release date. System stays in its validated state.

    System owner and IT QualityDay 30

Fictional example from this guide

Show the numbers
StepWhat happensWhoTime
Release notes arriveThe supplier publishes notes 30 days before release.SupplierDay 0
Map the changesEach change is matched to validated functions.Validation engineerDay 2
Re-place what movedA changed due-date rule goes high. A new search filter stays low.Validation leadDay 3
Prove and recordScripts for high-risk changes, charters for the rest, a supplier review for the platform.Engineer and QADays 5 to 25
Release dayRecords signed before the release date. System stays in its validated state.System owner and IT QualityDay 30
Periodic review catches the slow drift. The draft Annex 11 has a whole section on it: after go-live, reviews should verify that the system remains in a validated state, and should be run and closed according to plan.3 Today's Annex 11 asks for it too. A list of what changed, what broke and what was retested shows an inspector you know your system.
11 · AI and validation

Using AI to write validations: draft Annex 22, FDA's January 2025 draft and who checks the tool

In shortSoftware can read specifications, group requirements, propose a risk call and draft scripts. FDA's CSA guidance names AI tools among what it covers, when used in device production or quality systems. Draft EU Annex 22 says large language models "should not be used in critical GMP applications", and it remains a draft under active debate. In every reading, a qualified person answers for the output, and you assess the tool for what you use it for.

The AI rules around validation are mostly drafts and principles, and the Annex 22 text may still change
  1. September 9, 2024EMA reflection paper

    Adopted.

  2. January 2025FDA draft guidance on AI

    Regulatory decision-making. Still a draft.

  3. July 2025GAMP AI guide; draft Annex 22 opens

    Consultation closes October 7, 2025.

  4. January 14, 2026EMA and FDA common principles

    Ten principles, for medicine development.

  5. June 30, 2026EMA workshop on Annex 22

    Comments favored allowing such models; drafting group discussing it.

  6. July 2026CDER guidance agenda

    Lists a planned CSA supplement for AI-based systems in drug manufacturing and clinical investigations. No text yet.

  7. July 27, 2026EU AI Omnibus in force

    Annex III December 2, 2027; Annex I August 2, 2028.

Source 36 37 38 39 40 41 42 43 12

Show the numbers
WhenWhat
September 9, 2024EMA reflection paper
January 2025FDA draft guidance on AI
July 2025GAMP AI guide; draft Annex 22 opens
January 14, 2026EMA and FDA common principles
June 30, 2026EMA workshop on Annex 22
July 2026CDER guidance agenda
July 27, 2026EU AI Omnibus in force
Q4 2026Target for final text to the Commission
TextWhat it says that touches this workHow to use it
FDA CSA guidance, final1Its framework can be applied to "artificial intelligence/machine learning tools" used as part of production or the quality management systemA device maker assesses an AI tool's intended use and risk like any other software.
Draft Annex 22, section 1, draft36,16Applies to static models with deterministic output. Generative AI and large language models are not covered "and such models should not be used in critical GMP applications". In non-critical uses, trained and qualified people answer for outputsDecide and record whether your use has a direct effect on patient safety, product quality or data integrity. That is your call under a draft.
EMA workshop report, EMA/156789/202637Consultation comments favored allowing such models. The drafting group "has therefore discussed" widening scope under a documented control strategy, and concerns remain. No revised text is publishedPlan for either result. Keep your use reversible, and keep a person in the loop.
FDA AI draft, January 2025, draft40Excludes "operational efficiencies (e.g., internal workflows, resource allocation, drafting/writing a regulatory submission)" that do not affect patient safety, drug quality or study reliabilityA validation drafting aid is usually an internal workflow. Check that against what you do with the output.
CDER guidance agenda, July 2026, a plan12Lists "Computer Software Assurance for AI-Based Systems in Drug Manufacturing and Clinical Investigations; Supplemental Guidance", and "AI and ML Quality Considerations in Pharmaceutical Manufacturing". CDER says it is not bound to issue what the agenda lists. We found neither published as of November 3, 2026Watch for both. Until text exists, a drug or clinical team has nothing from CDER on CSA to cite.
EMA reflection paper, September 202441Sets expectations for AI use across the medicine lifecycle, with the sponsor, applicant or marketing authorization holder responsibleRead it for how Europe thinks about responsibility.
ISPE GAMP AI guide, July 2025, industry39Developing and using AI-enabled computerized systems in GxP areas, alongside GAMP 5A shared vocabulary with your QA team and auditors.
EU AI Act after the Omnibus43Regulation (EU) 2026/1744 in force July 27, 2026. High-risk rules in Annex III from December 2, 2027, and for products in Annex I from August 2, 2028Ask your counsel. Internal drafting aids are seldom the case the high-risk rules were written for, and your use may differ.
Reading and drafting sit where a person can check the work, and final risk calls stay with people

Our reading, for one common way of working. Your own risk assessment places your own use.

Harm if wrong and unnoticed →
A person decides
Assist, signed review
Avoid
Good first use
Decide final riskPropose a placementMatch controlsDraft a scriptFind untraced lines
How easily a person can check the output →

Our reading of the sources 1 36 40

Show the numbers
ItemHow easily a person can check the output (0–1)Harm if wrong and unnoticed (0–1)
Decide final risk0.120.78
Propose a placement0.800.62
Match controls0.800.29
Draft a script0.660.19
Find untraced lines0.800.10

What software does well in validation work, and what stays with qualified people

Software does wellPeople keep
Splitting specifications into numbered requirements, with page anchorsSigning the intended use
Proposing how to group requirements into functions, each with its reasonEach risk decision, and what your process does when a function fails
Finding which supplier test or control mentions the same behaviorAccepting that evidence, for that version and that configuration
Drafting scripts, charters and a plan on your templatesRunning the tests and judging what a defect means
Showing any requirement with no proof, and any conflict with the SOPResolving the conflict, and signing with a stated meaning
Who validates the validation tool? You do, for your use. If the tool helps keep a quality record, it may itself be in scope.1 Ask how its output is checked, and test its errors on your own past validations. A tool with citations makes a reviewer faster only if the reviewer opens them, so sample that too.
12 · The trend

How far CSA has spread: one vendor's surveys, rising workloads and the figures nobody publishes

In shortThe only recurring numbers we found come from annual surveys by one validation software vendor, so read them as directional. In 2024, 64% of respondents said they were using or adopting CSA and 15% said it was fully integrated. In 2025, 66% reported a higher workload. In 2026, 39% were using or evaluating AI for validation. We found no public figure for hours per system, cost per validation or defects found by method in regulated software.

64%

of respondents using or adopting CSA in 2024, across industries the survey counts together.44

Vendor survey, 2024
60%

said validation takes 8% to 10% or more of project budgets.44

Vendor survey, 2024
39%

using or evaluating AI for validation, from 614 respondents.45

Sponsored vendor survey, 2026
Few respondents say CSA is fully built in: 15 in 100 in 2024
15 in 100

respondents to a vendor's 2024 survey reported full integration of CSA processes

Source 44

Show the numbers
MeasureValue
respondents to a vendor's 2024 survey reported full integration of CSA processes15 of 100
Most respondents report a rising validation workload every year the survey gives a figure

Share saying their validation workload rose. The survey publisher sells validation software. The questions may differ by year, and we read no figure for 2023.

81%2022
61%2024
66%2025

Source 44 46

Show the numbers
PeriodValue
202281%
202461%
202566%
What nobody publishes. We found no public figure for hours or cost per validated system, for how many systems a typical company runs, for defects found by scripted against unscripted testing in regulated software, for inspection results before and after a change to CSA, or for a market size from a primary source. Vendors may quote their own savings: ask how each was measured, on what system, and against what baseline. Section 17 shows how to find your own.

The direction is clearer than the amounts. The same survey reported 57% using or adopting CSA in 2023, against 64% in 2024.47,44 The 2025 survey, with over 300 respondents, says 58% now use a digital validation system, up from 30% the year before, and places audit readiness as the top challenge for the first time.46

The 2026 sponsored article reports 614 respondents and "rising workloads against constrained resources", and 78% confident AI will be standard practice by 2030.45 Device and drug respondents are counted together in those pages, so none of these figures tells you how widely drug makers use the device guidance.

13 · How teams do it today

How a validation runs today: five roles, five hand-offs and where the first-draft days go

In shortA validation passes among four or five people, and we found no public figure for how its calendar divides. Teams run it on document templates, on a digital validation system, or with a consultancy. Whichever they use, the risk call may be made in a meeting and written in a form that later readers find hard to follow.

The validation lead, the engineer, the system owner, the approver and the supplier, and what each wants

Typical roles, by description
VL

Validation lead

Owns the plan, makes the risk calls with the system owner, signs as author, and usually runs several validations against go-live dates.

Cares about: a risk call she can defend in a year's time.
CE

CSV or CSA engineer

Writes scripts and charters, runs tests and records evidence.

Cares about: testing that finds defects, in place of paperwork that restates them.
SO

System owner

Often the laboratory or operations head. Writes or signs the intended use and owns the go-live date.

Cares about: the go-live date, and how the system will be used day to day.
IQ

IT Quality or QA approver

Approves the plan and final report, and answers to the inspector.

Cares about: why each function was tested the way it was.
SP

Supplier quality contact

Provides the test package, SOC reports and release notes, and hosts an audit where one is needed.

Cares about: answering each customer's questions once.
On a typical path, a validation changes hands five times before anyone runs a test

A typical path. Timings vary widely, and we found no public benchmark.

  1. 1System owner states the need

    Intended use and first requirements.

    System ownerStart
  2. 2Supplier assessed

    Questionnaire, reports and an audit if the risk needs one.

    IT QualityHand-off 1
  3. 3Risk assessment

    Requirements grouped, each function judged, in a meeting.

    Validation lead and ownerHand-off 2
  4. 4Plan and scripts written

    On company templates, with a trace by hand.

    EngineerHand-off 3
  5. 5Plan approved

    Review rounds with QA before testing.

    IT QualityHand-off 4
  6. 6Testing and report

    Runs, deviations, conclusion and signatures.

    Engineer, then allHand-off 5

Illustrative · replace with your own numbers

Show the numbers
StepWhat happensWhoTime
System owner states the needIntended use and first requirements.System ownerStart
Supplier assessedQuestionnaire, reports and an audit if the risk needs one.IT QualityHand-off 1
Risk assessmentRequirements grouped, each function judged, in a meeting.Validation lead and ownerHand-off 2
Plan and scripts writtenOn company templates, with a trace by hand.EngineerHand-off 3
Plan approvedReview rounds with QA before testing.IT QualityHand-off 4
Testing and reportRuns, deviations, conclusion and signatures.Engineer, then allHand-off 5
Across five working days to a first draft, script writing takes the largest share of one team's estimate

Working days per step, for one new module of a configured system: one fictional company's planning estimate. Replace it with a stopwatch.

Reading the sourcesGrouping and the risk callPlan and test strategyScripts and chartersTrace matrix and gaps
First draft by hand1 day1 day1 day1.5 days0.5 days

Illustrative · replace with your own numbers

Show the numbers
Reading the sourcesGrouping and the risk callPlan and test strategyScripts and chartersTrace matrix and gaps
First draft by hand1 day1 day1 day1.5 days0.5 days

Documents, a digital validation system, a consultancy or drafting software: how teams run CSA

Way of workingWhat it does wellWhere it runs out
Documents and spreadsheetsCheap, flexible and familiar to any inspectorThe trace is manual, reuse is copying, and the reasoning scatters across files
A digital validation systemPaperless execution, electronic signatures, a trace and a library of testsHolds the work well, and leaves the risk call and the reading to your people
Consultancy or contract validation teamExperienced people, capacity for a peak, and a CSA transition methodKnowledge can leave with the contract, and you still own and answer for the result
Software that reads and drafts, with your people decidingReads every source, proposes each placement with a citation, and spots gaps earlyNew. Needs your own assessment, and only a pilot on your own files will show how well it works

Validation programs are often run site by site: 48% of respondents to the vendor's 2024 survey said they structure them by individual site.44 GAMP 5's categories are the usual shared shorthand for how much of a system is configured or custom: commonly 1 for infrastructure, 3 for non-configured, 4 for configured and 5 for custom software.48

Part B · See it working

One sample LIMS module in Botminds Computer Software Assurance: from six source documents to a signed plan

Part A described the work without naming a product. This part shows how Botminds does it for the module in the example at the top of the page. Every company, person, system, requirement and hour on the screens is sample data, and Botminds never validates anything on your behalf: you validate your systems, and your use of this one.

14 · One module, start to finish

VP-2614, October 7: fifteen functions placed, one SOP conflict decided and a plan signed by 9:29 am

In shortOmar Haddad, the validation lead, opens the validation with its six sources. Six agents read them, group 42 requirements into 15 functions and place each on the company's risk grid, with a reason and a citation. He decides the one conflict with the SOP, reads the plan and trace matrix, and signs as author. The system owner and IT Quality sign next, and testing has not yet begun.

Read this case with Part A in mind. Northwind Bio makes a biologic in Leiden, so its inspectors work from EU GMP Annex 11, and from Part 211 for anything it ships to the United States.10,8 Its SOP says it follows FDA's computer software assurance approach and GAMP 5. For this drug system, FDA's text is a method the company chose to borrow, and it has no force of its own here. The grid is the company's own method, and its likelihood axis is its own choice. Your SOP sets yours.
1

Six sources in, and a grid that already says how each cell is proven

Validation VP-2614 opens with the requirements (URS v1.3, 38 pages), the configuration specification (v0.9, 61 pages), the intended use (v1.0, signed by Dr. Maya Chen, the system owner), the supplier's validation package 10.0 (312 pages, a 16-page summary read), the SOC 2 Type II report and the company's QA-SOP-0412 v7.

The grid is empty, and the method and hours per cell were set by IT Quality: 6 hours for a robust script where impact and likelihood are both high, 1.5 for supplier evidence, 0.5 for a written reason. "Robust" is FDA's word for the fuller grade of scripted testing, and the screen uses it.

Six sources and an empty grid. On the right, each source with its version and pages, and the intended use the system owner signed.
2

"Place functions": six agents read 214 pages

The Requirements Reader finds 42 requirements with page anchors. The Intended-Use and GxP Assessor records direct use in the quality system and GAMP category 4, software as a service. The Function Risk Classifier places 15 functions. The Vendor Evidence Matcher finds that the supplier package and the SOC 2 report, for a period ended June 30, 2026, cover 2 functions and 5 requirements.

Each function lands in its cell as you watch, and nothing is final until a person signs.

Agents at work. Six steps in view, each with its finding, while functions land in the high-high cell.
3

Six functions in the high-risk corner, and one decision raised

Stability protocol set-up, pull-point calculation, result entry, out-of-specification flagging, the audit trail on result changes and the chromatography import land where both axes are high: 36 hours of robust scripts. Backup and hosting rest on supplier evidence. The lab news board needs a written reason. The strip reads 55.5 hours against about 118 if every requirement were scripted.

The function risk grid. Impact down the side, likelihood across, and the hours each cell sets. The amber flag marks the one decision. Sample estimates.
4

"Our SOP is stricter than the grid here"

User access and roles sits in an unscripted cell at 73% agent confidence. SOP section 6.2 asks for a scripted test of any function controlling who approves GMP results. The agent lays out two options with their citations and chooses neither. Omar can follow the SOP with a three-step limited script, for half an hour more. Or he can keep it unscripted and send a deviation request to IT Quality.

He follows the SOP. The total becomes 56 hours, and the decision is recorded under his name.

A decision for the lead. The second option's "guidance" is the FDA device text, an analogy at this plant, so a real lead would weigh it against the SOP and Annex 11.
5

A plan drafted from the grid, and a trace with one closed gap

The plan's eight sections each cite what they rest on, and any section can be redrafted. Records will be digital evidence, with screenshots only where a step needs one, which is close to FDA's device wording and lighter than the draft Annex 11 text. A real Leiden lead would check that against the company's own reading of Annex 11.

The trace matrix reads 42 of 42. The first draft left URS-031, keeping records and audit trails for 10 years, with no test. The checker proposed the supplier's retention control plus an evidence review, in which the reviewer confirms that 10 years is what is set.

The one closed gap. SOC 2's C1.1 criterion concerns keeping confidential information, so the review still checks the setting.27
6

Omar signs as author, with the meaning stated

The signature covers the plan and test strategy, the risk assessment of 15 functions, the trace of 42 requirements, 9 scripts and 3 charters. He confirms the meaning: "I am the author of this validation plan, risk assessment and trace matrix." 21 CFR 11.50 asks a signed record to show name, date and time, and meaning.28

VP-2614 moves to QA approval at 9:29 am. Dr. Chen reviews next, then Dana Okafor approves it for testing.

Sign as author. What the signature covers, who signs, what it means, and a password. Sample data.
What a careful validation lead would still ask. The configuration specification is still draft v0.9, so anything cited from it may change before testing. Backup and retention sit at high impact with low likelihood and rest on supplier evidence: Annex 11 asks that the ability to restore be checked during validation, so a real Leiden plan would likely name a restore check of its own.10 And "low likelihood" means supplier-tested on this grid, which is a different thing from FDA's "reasonably foreseeable".1
Forty-two requirements became 15 functions, 6 in the high-risk corner and 1 conflict for the lead
Requirements read42
Functions placed15
In the high-high cell6
SOP conflicts for the lead1

Fictional example from this guide

Show the numbers
StageCount
Requirements read42
Functions placed15
In the high-high cell6
SOP conflicts for the lead1
15 · The other screens

Why a function sits where it does, the plan, scripts, charters, trace, dashboard and the rules you set

In shortBehind the grid sit the reason for each placement, the plan and its risk table, robust and limited scripts, time-boxed charters, supplier evidence reviews, the trace matrix, the audit trail and signatures, every validation in flight, a library of sources, a dashboard and the settings that hold your own rules. Each number opens its source.

The grid after the decision. 56 hours, with user access now marked SOP and the decision on the right under the lead's name.
Why it sits here. A miscalculated pull window means samples tested out of window and stability data lost. Below: the requirements and the passage it rests on, highlighted.
A person moves a function. Moving pull reminders to high likelihood changes its method and test id everywhere, and takes the total to 56.5 hours. Shown as a separate what-if; the case above stays at 56.
The validation plan. Eight sections drafted from the grid, each citing its sources, with a redraft per section and export to Word.
The risk table in the plan. FDA's guidance recommends that the record include the risk result. Here it sits in one table per function.1
A robust script. TS-2614-02: the 3-month pull due January 1, 2027, plus or minus 7 days; the 18-month pull due April 1, 2028, plus or minus 14; a date change blocked with no reason. Every step names a requirement.
A limited script. TS-2614-09, the result of the decision in the case above: three steps on who can approve.
An unscripted charter. A mission, 45 minutes, a named tester, and notes, issues and a conclusion. Priya Ranvelle, the CSA engineer in the sample, would run it.
A supplier evidence review. The lead checks that the report's period falls within 12 months, reads for exceptions and confirms the 10-year setting. The cited passage is the sample supplier's report.
The trace matrix. Each requirement with its function, cell, proof and status, filtered by method. It exports to Excel. An untraced requirement blocks signing.
Checks, audit trail and signatures. People and agents on one trail that cannot be edited. Author signed; reviewer and approver waiting.
All validations. New systems, changes, SaaS releases and a spreadsheet, each with its mix of methods, its stage and its go-live clock. Filter by stage or plant.
A supplier release on the grid. Release 26R3, 12 days out: a changed due-date rule lands high, a new search filter stays low. 27.5 hours against 39.
Sources. Read in place and cited by page. The row for FDA's guidance holds the sample's paraphrase of its key passages, with the title and date updated for this guide; read the real text at FDA.1
A source, with its cited passages. Highlights mark what is cited. The side list shows which functions rest on each one.
The dashboard. Validations placed, time to a first draft, and how functions are proven. Sample figures; hours are the solution's estimates.
Where people changed the agents. A frequent change can become a rule. This table is what a QA team should watch: if people never change anything, ask whether they are reading.
Your grid and rules. The method per cell and the rules are settings approved by IT Quality. Changing a cell re-places every open validation. You could rename the axis, or mark which cells are high process risk.
Supplier window and approvals. The SOC 2 window is 12 months here, and configuration is always yours to test. Author, reviewer and approver are named.
16 · Roles, signatures, systems

The six validation agents, the three signatures and the documents a validation runs on

In shortSix agents each do one narrow job, and each has something it must never do. People decide every placement and sign every record, with maker and checker kept apart. Sources are read in place. Outcome figures here are labeled estimates and design targets, to be measured on your own files.

Six agents draft in sequence, and three people sign before any test runs
  1. 1Requirements Reader

    Numbered requirements with page anchors.

    Agent214 pages
  2. 2Intended-Use and GxP Assessor, Function Risk Classifier

    GxP impact, category, and each function's place with its reason.

    Agents15 functions
  3. 3Vendor Evidence Matcher, Test Strategist and Script Writer

    What the supplier proves, then plan, scripts and charters.

    Agents9 scripts, 3 charters
  4. 4Trace and Consistency Checker

    Every requirement reaches proof, or it blocks signing.

    Agent42 of 42
  5. 5Validation lead decides and signs

    Every placement and every SOP conflict.

    Omar HaddadAuthor
  6. 6Owner and IT Quality sign

    Confirms intended use and placements, then approves for testing.

    Dr. Maya Chen, Dana OkaforReviewer, approver

Fictional example from this guide

Show the numbers
StepWhat happensWhoTime
Requirements ReaderNumbered requirements with page anchors.Agent214 pages
Intended-Use and GxP Assessor, Function Risk ClassifierGxP impact, category, and each function's place with its reason.Agents15 functions
Vendor Evidence Matcher, Test Strategist and Script WriterWhat the supplier proves, then plan, scripts and charters.Agents9 scripts, 3 charters
Trace and Consistency CheckerEvery requirement reaches proof, or it blocks signing.Agent42 of 42
Validation lead decides and signsEvery placement and every SOP conflict.Omar HaddadAuthor
Owner and IT Quality signConfirms intended use and placements, then approves for testing.Dr. Maya Chen, Dana OkaforReviewer, approver

Requirements Reader to Trace Checker: each validation agent's job and its limit

AgentWhat it doesWhat it never does
Requirements ReaderSplits requirements, specifications, supplier packages and SOC reports into numbered items with page anchorsRewrites a requirement, or reads a superseded version
Intended-Use and GxP AssessorStates intended use, GxP impact and GAMP category from the signed statement and the inventorySigns the intended use. The system owner does.
Function Risk ClassifierGroups requirements into functions, proposes a place on your grid with a reason and citation, and raises a decision where the SOP is stricterResolves an SOP conflict. The lead decides.
Vendor Evidence MatcherLinks requirements to supplier tests and SOC 2 controls that prove the same behavior, and checks the report period against your windowCovers your configuration
Test Strategist and Script WriterDrafts the plan, scripts and charters on your templatesWrites a step with no requirement, or a charter with no tester and time box
Trace and Consistency CheckerBuilds the trace, flags gaps, proposes the lightest sufficient proof, and checks the plan against the gridLets an untraced requirement pass to signing

Omar, Maya, Dana and Priya: who signs and who tests on this LIMS validation

Fictional, from the sample data
OH

Omar Haddad · validation lead

Decides each placement and SOP conflict, and signs as author.

"I spend weeks on scripts and minutes on the risk call that decides them."
PR

Priya Ranvelle · CSA engineer

Runs scripts and charters, and records evidence.

"Give me a time box and a mission."
MC

Dr. Maya Chen · system owner, QC laboratory

Signed the intended use. Reviews every placement, and signs as reviewer.

"Why are we re-testing what the vendor already proved?"
DO

Dana Okafor · IT Quality approver

Approves the grid and rules in settings, and approves each validation before testing starts.

"Show me why each function is tested the way it is."

From URS and supplier package to a signed plan, scripts and trace matrix

Read in place

  • User requirements and functional or configuration specifications
  • Supplier validation packages and SOC 2 Type II reports
  • Supplier release notes
  • Intended-use and GxP assessment
  • System inventory, with owners and GAMP category

From your team

  • Your CSV or CSA procedure, and its templates
  • Your grid, rules and approvers
Agents read, place and draft Every line points to its source
The lead decides every placement
Three people sign

What comes out

  • Function risk grid, with the reason per function
  • Method and hours per function
  • Validation plan and test strategy
  • Scripts and charters on your templates
  • Requirements traceability matrix
  • A signed record with its audit trail, exported to your validation tool

The 3.2-hour draft and the 53% test cut: sample figures to test on your own files

3.2 hours

median to a complete first draft of a validation, against about 5 working days by hand.

Design target; the 5 days is our estimate
53%

fewer planned testing hours on the sample module: 56 against about 118.

Estimate on sample data
42 of 42

requirements reach proof before signing, since an untraced one blocks the signature.

Sample run

Targets are design goals, to be measured in the live solution. A pilot on your own files should test them, and section 21 shows how.

Roles, audit trail, credentials, and what you still validate yourself

Enterprise controls. Role-based access, maker-checker sign-off with three named roles, versioned rules, a full audit trail of every agent step and human decision, audit export, and connections to your requirements tool, system inventory and validation tool. Botminds is SOC 2 Type II audited, and its information security is managed to ISO 27001.

What software cannot claim. GxP, 21 CFR Part 11 and EU Annex 11 cannot be certified for a product, and no product arrives validated for your use. These are controls that support your compliance. You assess Botminds as a supplier, you validate your use of it to your own SOP, and your people sign.

Where the draft AI rules touch this. Agents that read documents and draft may use large language models. Draft EU Annex 22 says such models "should not be used in critical GMP applications", and it is still a draft; EMA's 2026 workshop report shows that wording under debate.36,37,16

FDA's drug center lists a planned supplement on computer software assurance for AI-based systems in drug manufacturing and clinical investigations, with no text yet.12 Here agents propose and draft, and a qualified person decides and signs. Whether that makes your use non-critical is your own documented assessment. Ask us how each step works.

Part C · Are you ready to automate?

Risk-based validation at your own company: the cost of over-testing and weak records, the case for a new method and the case for software

You run validation or IT quality, or you own a system waiting on a go-live date. This part is written for you: what uneven testing and thin records cost, what changing the method and automating the writing could each return, whether your team is ready, and what to ask any vendor of validation software, including us.

17 · What it costs you

Script-everything testing costs you hours; a thin validation record costs you in an inspection

In shortTwo costs sit on opposite sides. Testing everything evenly costs hours you can count, and it delays go-lives. A missing or unreadable record may be rarer, and it costs more when it shows up in an inspection. Nobody publishes the cost of a validation, so the numbers that matter most are the ones you can find in a week.

110

citations under 21 CFR 211.68(b) on drug Form 483s in fiscal 2025, by our sum of FDA's rows.30

FDA data
20

citations under 21 CFR 820.70(i) on device Form 483s in fiscal 2025, by our sum, the last full year before that section was removed.30,2

FDA data
60%

of respondents said validation takes 8% to 10% or more of project budgets.44

Vendor survey, 2024
Reading and writing are where the days to a first draft can come down

Working days per step for one new module, by hand and with the solution. Your people's review and signing come on top.

By hand (our estimate)With the solution (design estimate)
Reading the sources1 day0.1 days
Grouping and the risk call1 day0.1 days
Writing the plan and strategy1 day0.05 days
Writing scripts and charters1.5 days0.1 days
Building the trace and closing gaps0.5 days0.05 days

Illustrative · replace with your own numbers

Show the numbers
By hand (our estimate)With the solution (design estimate)
Reading the sources1 day0.1 days
Grouping and the risk call1 day0.1 days
Writing the plan and strategy1 day0.05 days
Writing scripts and charters1.5 days0.1 days
Building the trace and closing gaps0.5 days0.05 days
The cost figures you will not find. We found no public figure for what a validation costs, how many hours a function takes by method, or how often risk-based testing misses a defect that scripted testing would catch. The 118 and 56 hours in this guide are one fictional company's planning estimates. Measure yours before you rely on anyone's.

A one-week baseline for your own validations: hours by method, supplier overlap and slipped go-lives

CostWhere it hidesHow to find your number in a week
Hours per requirement by methodTimesheets booked to one project codeTake your last three validations, and divide test hours by requirements
Re-testing what the supplier provedScripts for audit trail, signature and backup enginesMark each script against the supplier package, and count the overlap
Defects found per test hourDeviation logs nobody comparesCount defects by function risk over the last 10 validations. Where do real ones cluster?
Go-live delay from validationProject plans, moved quietlyList planned against actual go-lives for a year, and find what each slip waited on
Review rounds on plans and scriptsEmail threads with QACount rounds and elapsed days on five recent plans
Systems with no current recordInstrument PCs and spreadsheetsWalk one laboratory, and compare what you see with the inventory
Supplier release effortRegression packs rerun in fullTake one release, and divide hours spent by functions changed

Lost stability data, an unreadable rationale, a forgotten PC: validation costs left out of the sums

Data you cannot get backA pull calculated wrongly means samples tested out of window. A stability study cannot simply be rerun in a week.
The rationale nobody can followA risk call that made sense in the meeting may be unreadable two years later, when its author has left and the inspector asks.
The tester's attentionPeople who spend the day on screenshots spend less of it looking for what could go wrong.
The system nobody listedTime freed on a news board could go to the instrument PC with shared logins, the pattern in a 2026 FDA letter.31
Fear of changeIf every patch costs a full revalidation, people postpone updates and live with known problems longer than they should.
18 · Your return

Two separate savings: risk-sized testing needs no new software, and automated drafting does

In shortPut in your own numbers. Two savings sit apart on purpose. Sizing tests to risk is a decision about method, available to you with or without new software. Faster reading, writing and tracing is what software can add. The calculator counts time alone, and takes away what the software would cost you.

Method, drafting, supplier reuse, releases: where CSA and automation can each pay

The method

Test hours sized to risk

Robust scripts where a failure matters, lighter proof elsewhere, each with a written reason.

validations × (hours today − hours sized to risk) × hourly cost
The writing

First drafts in hours

Plan, scripts and trace drafted from your sources, for people to check.

validations × (writing hours today − writing and checking hours) × hourly cost
The supplier

Evidence used once

Supplier tests read, matched and recorded in place of being re-run.

overlapping scripts × hours per script × hourly cost
The releases

Regression sized to the change

Each release note mapped to the functions it touches.

releases × (hours today − hours sized to the change) × hourly cost
The date

Earlier go-lives

Real for the system owner, and left out of the calculator because its value depends on the system.

days earlier × value per day of the system
The record

A reason an inspector can follow

One line per function, cited. Real, and left out of the calculator.

questions answered from the record ÷ all questions on validation

A calculator for test, writing and supplier release hours across your validation load

Test hours start from the fictional module in this guide: 118 and 56. Writing hours start from about 5 working days (40 hours, our estimate), against 10 including people's review and the 3.2-hour design target. Every other default is a placeholder.

New systems and modules
Supplier releases
Cost
Illustrative yearly value
Test hours freed by the method0
Writing hours freed by automation0
Release hours freed0
Time saved, valued$0
After the yearly cost$0

Formula: (validations × test hours freed + validations × writing hours freed + releases × hours saved) × hourly cost − yearly cost. The first line is available without new software. If you already size tests to risk, set the two test figures equal, and the case rests on writing, tracing and releases alone.

19 · Readiness check

Score your validation program on eight points, from the rule that binds each system to the AI tool you would assess

In shortAnswer honestly, 0 to 2 on each. Your score suggests whether to fix the method first, pilot on one system, or plan a rollout. Nothing you choose leaves this page.

1
Which rule binds each system

For each kind of system, can you say which rule applies: Part 820, Part 211, Annex 11 or E6(R3)?

Why it mattersFDA's CSA guidance reaches device production and quality systems. Everything else needs its own authority.
A strong answer"Yes, it is a column in our inventory, and our SOP names each rule."
2
An inventory you trust

Does your inventory include spreadsheets, instrument PCs and cloud tools that hold quality records?

Why it mattersAnnex 11 asks for an up-to-date inventory. One recent FDA letter cites inspection software installed many years ago and never validated.
A strong answer"Checked by walking one lab a quarter."
3
A written risk method

Does an approved SOP say how a function is judged and what each result requires?

Why it mattersA tool can apply only a method you have written and approved.
A strong answer"Yes, with a grid, its sources and the hours for each cell."
4
Requirements a reader can use

Do requirements have stable ids, one behavior each, and an approved version?

Why it mattersTracing is impossible when one line holds five requirements, or when drafts keep moving.
A strong answer"Ids from our requirements tool, one behavior per id."
5
Supplier assessments on file

Do you hold a current assessment and report for your main suppliers, with a window for accepting them?

Why it mattersReusing evidence depends on having assessed who produced it.
A strong answer"Yes, risk-ranked, with SOC 2 reports inside a 12-month window."
6
A baseline in hours

Do you know test and writing hours per validation, by kind of system?

Why it mattersWithout one, no vendor's number means anything, including ours.
A strong answer"Three validations timed, by step."
7
QA on board with unscripted testing

Will your QA approvers accept a charter, and has anyone agreed what the record looks like?

Why it mattersTeams stall when engineers adopt the method and approvers still ask for screenshots.
A strong answer"Agreed template, tried on one system, with evidence profiles by region."
8
Ready to assess an AI tool

Do IT and quality know how they would assess a tool that reads and drafts, and have they read draft Annex 22?

Why it mattersYou validate your use of the tool, and record who checks its output.
A strong answer"Intended use drafted, risk assessed, reviewer checks defined."
9
The hours you get back · for reflection

If your engineers had a third of their test hours back next year, where would you point them first: forgotten systems, audit trail reviews, supplier oversight, or failure scenarios nobody has tried? Not scored.

A low score means writing your risk method before buying anything

0–6

Explore

Name the binding rule for each kind of system, finish the inventory, write the method in an SOP and time three validations. All of it pays off before any software arrives.

7–11

Ready to pilot

Take one closed validation and one coming up. Have your team make the risk calls blind, compare them with the tool's, and fix what the comparison shows up.

12–16

Ready to implement

Plan connections to your requirements tool, inventory and validation tool, your grid and approvers, your assessment of the supplier and your validation of your use.

20 · Questions for any vendor

Vendor questions for CSA software: scope, the risk call, supplier evidence, compliance claims and proof

In shortAsk every vendor the same questions, us included. The answers show whether the tool knows where FDA's guidance stops, whether a person makes the risk call, what it does with supplier evidence, and how you would measure it on your own validations.

AskA good answerA warning sign
Scope and rules
Which version of FDA's guidance do you reference, and which products does it cover?February 3, 2026; device production and quality systems"The 2025 guidance, for all GxP"
How do I configure a drug plant under Annex 11?Your SOP and rule set, with the rule named on the recordOne built-in "CSA template" for everyone
Can I keep executed scripts and screen evidence for some systems?Yes, by evidence profile"Screenshots are obsolete"
The risk call
Who decides a function's risk, and where is that recorded?A named person, with reason and source on the recordA score with no reason
Can I replace your grid and axes with my own?Yes, approved in settings, with changes on the audit trailA fixed scoring model
What happens when my SOP disagrees with the risk score?It raises a decision with both sourcesThe score wins silently
Supplier evidence
Can supplier evidence ever cover my configuration?No, and you can see where the line is"The vendor validated it"
How do you check a report's period and version?Against your window and the version you runAny report on file
Compliance claims and AI
Is your product validated, Part 11 compliant or GxP certified?No product can be for your use. Here are the controls, and here is what you validate."Pre-validated and fully compliant"
Which steps use a language model, and what does a person check?A step-by-step map, and your own risk call under draft Annex 22"AI handles it"
What security credentials do you hold?Named audits and reports, which you can readLogos with no report
Proof and scale
Will you run a blind test on a validation I already closed?Yes, and you hold the answer keyDemo data only
How were your savings figures measured?System, baseline and method statedA percentage and a logo
How does it handle hundreds of systems, several sites and quarterly releases?One rule set per site, roles and audit export, shown on your second site"One validation at a time"
What can I export if I leave?Everything, in a form an inspector can readRecords live only in the tool
21 · A pilot

A ten-week CSA pilot on one closed validation and one live one, ending in five numbers

In shortStart with your method, then a validation you already closed, where you know the answers. Have your own people make the risk calls blind and compare. Then run one live validation with defects counted by method. Decide on the numbers below. If the pilot succeeds, extend system by system.

  1. Weeks 0 to 2. Write your method and name the binding rule for each kind of system. Time your baseline on three past validations.
  2. Weeks 2 to 4. Assess the tool as a supplier and write its intended use. Load your SOP, templates and one closed validation.
  3. Weeks 4 to 6. Two of your senior people place the functions blind. Compare both with the tool, and with what was done at the time.
  4. Weeks 6 to 9. Run one live validation of medium risk, with people deciding and signing. Count defects by method and by function.
  5. Weeks 9 to 10. Show the record to QA and an auditor who was not involved. Decide on the numbers below, and write down why.
A ten-week pilot ends in a decision built on five numbers
Your teamWith the vendor
Write the method; time three validations
Assess the tool; load one closed validation
Blind risk calls, compared
One live validation
Independent review of the record
Decide, and record why
Week 0246810

Illustrative · replace with your own numbers

Show the numbers
ActivityFromTo
Write the method; time three validations02
Assess the tool; load one closed validation24
Blind risk calls, compared46
One live validation69
Independent review of the record89.5
Decide, and record why9.510

Risk call agreement, defects by method and citations: how to score a CSA pilot

MeasureHowWhy
Risk call agreementSame cell, two senior people against the tool, and each otherPeople disagree too, so measure that first
High-risk functions missedFunctions your people call high and the tool places lowerThis is the failure that matters most
Citation validityOpen 100 citations. Does the passage say it?A citation that fails to prove the line is worse than none
Defects by methodReal defects per test hour: robust scripts, limited scripts, unscriptedPublic evidence is thin, so yours is what counts
Hours to a signed planStart to author's signature, against your baselineYour baseline, since no public one exists
Deep questions to settle before you scale

Legacy systems. Do you re-assess validated systems under the new method, or only at their next change?

Your SOP. Will you say that a risk-sized plan is acceptable for a system whose earlier validation was script-everything, and how do you explain that to an inspector?

Regions. If the final Annex 11 keeps "test scripts", what happens to your unscripted records for EU systems? Plan an evidence profile that can change.

The likelihood axis. If you score likelihood, what stops supplier-tested functions from always looking safe? Consider a floor for functions with serious impact.

Reliance on the tool. How will you know whether reviewers still read the sources after six months? Sample it.

Skills. Unscripted testing relies on experienced testers. Who trains the next ones, and how do you know a charter was run well?

22 · Questions people ask

CSA questions: FDA's final guidance, CSA vs CSV, pharma scope, unscripted testing and Part 11

In shortShort answers to what validation teams search for, each one complete on its own. Rules and statuses are as of November 2026.

What is computer software assurance?

Computer software assurance is FDA's risk-based approach to establishing confidence that software used in medical device production or quality systems is fit for its intended use. You put the most testing and evidence on functions whose failure could foreseeably compromise safety, and lighter methods elsewhere. The approach also draws on supplier work, unscripted testing and digital records.

Is FDA's computer software assurance guidance final?

Yes. The current final guidance is titled "Computer Software Assurance for Production and Quality Management System Software" and was issued February 3, 2026. It supersedes the version of September 24, 2025, and followed a 2022 draft. It contains nonbinding recommendations, and it replaces Section 6 of FDA's 2002 General Principles of Software Validation.

Does FDA's CSA guidance apply to pharmaceutical companies?

Not by its own terms. Its scope is computers and automated data processing systems used as part of production or the quality management system for medical devices, and it was prepared by CDRH and CBER in consultation with CDER. Drug makers can use its methods as an analogy, and should rest their validation on Part 211, FDA's 2018 data integrity guidance, Annex 11 and ICH Q9(R1). CDER's July 2026 agenda lists a planned supplement on computer software assurance for AI-based systems in drug manufacturing and clinical investigations, and we found no published text as of November 3, 2026.

What is the difference between CSA and CSV?

Computer system validation is the long-standing general term for proving that a system fits its intended use, and in practice often meant scripting and screenshotting every requirement. Computer software assurance is FDA's name for sizing that proof to risk. The duty to validate stays: FDA describes it as providing assurance that software maintains a validated state.

Does CSA replace GAMP 5?

No. GAMP 5 is an ISPE industry guide for GxP computerized systems, with a second edition from July 2022, and FDA's guidance lists it as a further resource. CSA is FDA guidance for device production and quality systems. A drug company can use GAMP 5 as its main method, and ISPE's own title for it calls it a risk-based approach.

What is high process risk?

FDA calls a software feature, function or operation high process risk when its failure may result in a quality problem that foreseeably compromises safety. Examples include software that maintains essential process parameters, or that decides product acceptability with little or no human review. FDA asks what is reasonably foreseeable, as opposed to likely. A later check by a qualified person can change the answer.

What is unscripted testing, and is it allowed?

Unscripted testing is dynamic testing where the tester's actions are not prescribed by written instructions, such as scenario testing, error guessing and exploratory testing. FDA's device guidance describes it, and gives record examples. Each still needs a record of what was tested, what was found, a conclusion, and who did it when. The draft revision of EU Annex 11 does not mention it, so check your own regional position.

Do I still need screenshots for validation?

FDA's device guidance recommends digital records such as logs and audit trails over paper, screenshots or duplicate results where they do the job. Draft EU Annex 11 asks for executed scripts and, where relevant, screen dumps, and it is not yet in force. Decide by rule and by risk, and write the evidence you require into your procedure.

Is a supplier's SOC 2 report enough to validate a system?

No. A SOC 2 Type II report describes a service organization's controls over a period, and can support your assessment of hosting, change control and backup. It says nothing about your configuration or intended use. FDA allows supplier work as a starting point, and Annex 11 and its draft keep you responsible for what you rely on.

What happened to 21 CFR 820.70(i)?

The Quality Management System Regulation took effect February 2, 2026, and removed most of the old Part 820, including section 820.70. The rule now incorporates ISO 13485:2016 by reference. FDA's guidance now points to subclauses 4.1.6, 7.5.6 and 7.6 for validating software used in production or the quality management system. FDA says the requirements are substantially similar in level of assurance.

Does CSA change what Part 11 requires?

No. Part 11 still governs electronic records and signatures under FDA rules, and FDA says a document required under Part 820 kept in electronic form is generally an electronic record. FDA adds that its 2003 enforcement discretion on validation does not apply to validation of production or quality system software under ISO 13485. A signed record must show name, date and time, and meaning.

Can AI write validation plans or make risk calls?

Software can draft plans and propose risk placements with citations, and a qualified person should decide and sign. Draft EU Annex 22 says large language models should not be used in critical GMP applications, and EMA's 2026 workshop report shows that wording is under debate. Neither text is final. Assess your own use, and validate the tool for what it does.

Can a software product be validated or GxP certified?

No product can be certified for GxP, Part 11 or Annex 11, and no product arrives validated for your use. Those duties fall on the regulated company, which validates its own intended use. A supplier can offer test evidence and controls that support your compliance, such as audit trails, signatures showing name, time and meaning, and access controls.

How do I start moving from CSV to CSA?

Name the rule that binds each kind of system first, since the answer differs for devices, drugs and trials. Write your risk method and evidence rules into an SOP, with QA agreeing the unscripted record. Then run one closed validation and one new one, counting defects by method and hours by step, before you change anything at scale.

23 · One-page summary

CSA at a glance: how to size proof to risk, where each text stands in November 2026, and 14 terms

Print this page

In shortThe whole guide on one screen: the method, the rules as of November 2026, the readiness bands and the terms.

The method
  1. Name the rule that binds this system. Call FDA's guidance an analogy outside devices.
  2. Write the intended use, function by function.
  3. Ask what a failure could foreseeably do, and record the answer.
  4. Choose the proof: robust script, limited script, unscripted, supplier evidence or a written reason.
  5. Build on the supplier only for the version and behavior it proved. Your configuration stays yours.
  6. Where your SOP disagrees, raise it to a named person.
  7. Keep intended use, risk result, testing, issues, conclusion, who and when. Trace every requirement.
  8. Send every change and release back through the same questions.

Readiness: score 0–2 on eight questions: 0–6 explore · 7–11 pilot · 12–16 implement.

As of November 2026: FDA CSA guidance final, February 3, 2026, device production and quality systems · Part 820 QMSR in effect February 2, 2026 · 21 CFR 211.68 and FDA's 2018 data integrity Q&A for drugs · EU GMP Annex 11 at its January 2011 revision · draft Annex 11 and draft Annex 22 still drafts · ICH Q9(R1) final 2023 · ICH E6(R3) final 2025 · FDA's AI guidance a draft · CDER's agenda lists a planned CSA supplement for AI-based systems, no text yet · AI Omnibus in force July 27, 2026.

14 terms
CSV
Computer system validation: the general term for proving a system fits its intended use.
CSA
Computer software assurance: FDA's risk-based approach for device production and quality systems.
GxP
Good practice rules, here for manufacturing, clinical trials, laboratories and distribution.
Intended use
What the software or function is used for in your process.
High process risk
A failure may cause a quality problem that foreseeably compromises safety.
Robust scripted testing
FDA's term: step-by-step test cases with expected results and a detailed report.
Limited scripted testing
FDA's term: fewer step-by-step cases, with a summary and any unscripted testing named.
Unscripted test
Scenario, error-guessing or exploratory testing, with no written steps in advance.
Charter
A one-page brief for an unscripted test: mission, time box, tester.
URS
User requirements specification.
Trace matrix
A table linking each requirement to the test or evidence that proves it.
SOC 2 Type II
An auditor's report on a service organization's controls over a period.
QMSR
FDA's Quality Management System Regulation, in effect February 2, 2026.
Validated state
Software kept under control and fit for its intended use throughout its life.
24 · Sources

Sources

Accessed November 2026. Regulatory status statements are as of November 2026. Warning letters and the Form 483 are cited from FDA's own copies, for what each one says. Survey figures from a validation software vendor are labeled as such.

  1. FDA, "Computer Software Assurance for Production and Quality Management System Software", final guidance, document issued February 3, 2026, supersedes the version of September 24, 2025; prepared by CDRH and CBER in consultation with CDER, the Office of Combination Products and the Office of Inspections and Investigations; docket FDA-2022-D-0795. fda.gov
  2. FDA, "Quality Management System Regulation (QMSR)", content current February 2, 2026: effective February 2, 2026; QSIT replaced by Compliance Program 7382.850. fda.gov
  3. European Commission and PIC/S, draft Annex 11: Computerised Systems, consultation text, July 2025. A draft, not in force. health.ec.europa.eu
  4. FDA, guidance page for Computer Software Assurance, content current February 3, 2026, listing medical devices as the regulated product. fda.gov
  5. FDA, "General Principles of Software Validation", final guidance, January 2002, with a note that Section 6 is superseded. fda.gov
  6. FDA, "Medical Devices; Quality System Regulation Amendments", final rule, 89 FR 7496, February 2, 2024. govinfo.gov
  7. Hogan Lovells, "FDA finalizes computer software assurance guidance", September 29, 2025, on the guidance's reach and the 2022 draft. hlc.com
  8. 21 CFR 211.68, Automatic, mechanical, and electronic equipment, 2025 edition (revised as of April 1, 2025), the newest on govinfo. govinfo.gov
  9. FDA, "Data Integrity and Compliance With Drug CGMP: Questions and Answers", final guidance, December 2018, question 3. fda.gov
  10. European Commission, EudraLex Volume 4, Annex 11: Computerised Systems, revision 1, in operation from June 30, 2011. health.ec.europa.eu
  11. ICH, E6(R3) Good Clinical Practice, final, January 6, 2025, section 4.3.4 and principle 9.3. database.ich.org
  12. FDA, "CDER Guidance Agenda: New and Revised Draft Guidances Planned for Publication in Calendar Year 2026", July 2026 posting, page current July 15, 2026, Artificial Intelligence and Pharmaceutical Quality/CMC categories. CDER says it is not bound to issue what the list names. fda.gov
  13. 21 CFR 4.4, current good manufacturing practice for combination products, 2025 edition. govinfo.gov
  14. 21 CFR 11.10, Controls for closed systems, 2025 edition. govinfo.gov
  15. FDA, "Part 11, Electronic Records; Electronic Signatures: Scope and Application", final guidance, September 2003. fda.gov
  16. European Commission, EudraLex Volume 4 page, read November 3, 2026: lists Annex 11 at its January 2011 revision and no Annex 22. health.ec.europa.eu
  17. European Commission, stakeholders' consultation on EudraLex Volume 4, Chapter 4, Annex 11 and new Annex 22, July 7 to October 7, 2025. health.ec.europa.eu
  18. ICH, Q9(R1) Quality Risk Management, final, adopted January 18, 2023. database.ich.org
  19. FDA, Q9(R1) Quality Risk Management, final guidance, May 2023, CDER and CBER, docket FDA-2022-D-0705. fda.gov
  20. ISPE, GAMP 5 Guide, 2nd Edition: A Risk-Based Approach to Compliant GxP Computerized Systems, July 2022. The guide itself is sold: we read ISPE's page and did not read its text. ispe.org
  21. FDA, "Electronic Systems, Electronic Records, and Electronic Signatures in Clinical Investigations: Questions and Answers", final guidance, October 2024, question 7. fda.gov
  22. European Medicines Agency, "Guideline on computerised systems and electronic data in clinical trials", EMA/INS/GCP/112288/2023, March 9, 2023. ema.europa.eu
  23. Itkonen and Mäntylä, "Are test cases needed? Replicated comparison between exploratory and test-case-based software testing", Empirical Software Engineering 19(2), 2014, 303-342; 51 students testing a text editor. We read the abstract on the publisher's page, not the full paper. doi.org
  24. AICPA and CIMA, SOC 2 topic page: system-level controls of a service organization; security, availability, processing integrity, confidentiality and privacy; also lists AICPA's exposure drafts of proposed 2027 criteria, October 26, 2026. aicpa-cima.com
  25. Microsoft Learn, "System and Organization Controls (SOC) 2 Type 2", Azure compliance documentation, updated October 10, 2024: what the auditor evaluates in a Type 2 report, management responses to exceptions and user entity responsibilities. A cloud supplier's description of its own audit: we did not read AICPA's SOC 2 guide, which is sold. learn.microsoft.com
  26. Linford & Company LLP, a CPA firm, "What Are Bridge (aka Gap) Letters & How Do They Relate to SOC Reports?", last updated June 5, 2026: signed by the service organization, with no testing by the service auditor in the gap. linfordco.com
  27. Open Security Architecture, SOC 2 Trust Services Criteria summary: A1.2 recovery infrastructure, C1.1 identifying and keeping confidential information. A summary: we did not read AICPA's own wording of the criteria. opensecurityarchitecture.org
  28. 21 CFR 11.50, Signature manifestations, 2025 edition. govinfo.gov
  29. MHRA, "GXP Data Integrity Guidance and Definitions", March 2018, section 3.10 on ALCOA and ALCOA+. gov.uk
  30. FDA, Inspection Observations, fiscal years 2018 to 2025 spreadsheets, page current December 16, 2025. Sums of rows are ours. FDA says the files are not a complete listing of every observation. fda.gov
  31. FDA, warning letter 721180, April 14, 2026, drug laboratory, inspection October 6 to 21, 2025. fda.gov
  32. FDA, warning letter 725939, May 22, 2026, drug manufacturer. fda.gov
  33. FDA, warning letter 695010, October 18, 2024, device manufacturer, violation 5. fda.gov
  34. FDA, warning letter 704563, May 9, 2025, device manufacturer, observation 1b under 21 CFR 820.75(a). fda.gov
  35. FDA, Form FDA 483 issued December 4, 2025, observation 5. A Form 483 lists inspectional observations and is no final Agency determination. fda.gov
  36. European Commission and PIC/S, draft Annex 22: Artificial Intelligence, consultation July 7 to October 7, 2025, section 1. A draft, not in force. picscheme.org
  37. European Medicines Agency, report of the multistakeholder workshop of June 30, 2026 on Annex 22, EMA/156789/2026. ema.europa.eu
  38. European Medicines Agency, inspectors working group three-year work plan, 2026 to 2028: Q4 2026 as the target for giving the Commission final text. ema.europa.eu
  39. ISPE, GAMP Guide: Artificial Intelligence, July 2025. ispe.org
  40. FDA, "Considerations for the Use of Artificial Intelligence To Support Regulatory Decision-Making for Drug and Biological Products", draft guidance, January 2025, docket FDA-2024-D-4689, section II. Still a draft on FDA's page. fda.gov
  41. European Medicines Agency, reflection paper on the use of artificial intelligence in the medicinal product lifecycle, adopted September 9, 2024. ema.europa.eu
  42. European Medicines Agency, "EMA and FDA set common principles for AI in medicine development", January 14, 2026. ema.europa.eu
  43. European Commission, AI Act page, on Regulation (EU) 2026/1744: in force July 27, 2026; Annex III rules December 2, 2027; Annex I rules August 2, 2028. digital-strategy.ec.europa.eu
  44. Kneat, "The evolving landscape of validation programs in 2024", September 5, 2024, on its 2024 State of Validation report. Kneat sells validation software. kneat.com
  45. "2026 State of Validation Report", sponsored content from Kneat in ISPE's Pharmaceutical Engineering, July 1, 2026, 614 professionals. ISPE says it did not review or endorse it. ispe.org
  46. Kneat, "2025 State of Validation: Validation Industry Annual Report", July 1, 2025, over 300 professionals. Kneat sells validation software. bioprocessonline.com
  47. Kneat, "Validation Trends to Watch in 2024", on its State of Validation 2023 survey. Kneat sells validation software; the sample size is not stated on the page. kneat.com
  48. IntuitionLabs, "GAMP 5 Categories Explained". A vendor article, used for the common description of categories 1, 3, 4 and 5; ISPE's text is sold, and we did not read it. intuitionlabs.ai
Next step

See it on one of your own upcoming validations.

Explore the solution, or bring the requirements, intended use and supplier package for one system due to go live, and we will place its functions on your grid with you, every line pointing to its source.

botminds.ai The complete guide to computer software assurance · November 2026. Northwind Bio, Plant 3 Leiden, Tessarine LIMS 10, Veltrimab, every person, procedure number, requirement and figure in the example and the screens are fictional. Regulatory status is as of November 2026; check the sources before relying on it. This guide is general information and is not legal advice. Software cannot itself be validated for your use, GxP compliant or certified: it can carry controls that support your compliance, and you validate your use of it.