Change control impact assessment that lists every affected SOP, system and filing before the board meets

Every affected SOP, system and filing listed before the board meets.

See one case, screen by screen ↓
demo31itemstouched in 9 areas by one bag supplier change whose request listed 3
demo2filingsthe owner missed, added from similar past changes and cited
target1.4daysmedian from triage to a complete, cited impact assessment
target87%of changes approved at the first board, none sent back for information
In short

What is Change Control Impact Assessment?

It is the step in GMP change control where QA and the reviewers work out everything a proposed change touches — SOPs, validated systems, equipment, specifications, products, market filings, stability, suppliers and training — before the change board decides. Change Control Impact Assessment has seven agents do that search, cite every item and add what similar past changes needed, for QA and the board to decide.

How to choose AI solutions for life sciences →

Updated

The problem

Why the missing impact is found after the first batch

A change owner raises a change control in the QMS and writes what they think it touches. Then QA, Validation, QC and Regulatory CMC each go looking for the rest by hand: which SOPs, work instructions and master batch records name the part, which ERP, MES and LIMS records hard-code it, which equipment was qualified with it, which specifications and stability commitments it triggers, and what each market's registration says about it.

Something is usually found late. An incoming-inspection SOP that only knows one supplier's label, an MES recipe step that rejects the new barcode, a filing in a market nobody thought of — found after approval, after the first batch, or at the next renewal, as a deviation. ICH Q12 is adopted unevenly, so the same change can need no filing in one market and a prior-approval variation in another.

typical5yearsat the upper end, for global approval of a simple post-approval CMC change across regions
demo9daysa first batch was late when the incoming-inspection SOP and MES label rule were found late
demo4monthsafter implementation before a missed UK Type IB was found, then filed late with a deviation
Where a Major change's assessment days goestimated
By hand9 days
With the solution1.4 days
  • Reading the request and agreeing the scope1 → 0.1 d
  • Finding SOPs, forms and batch records that name the change2 → 0.2 d
  • Systems, equipment and the validation scope2 → 0.3 d
  • Specifications, products and stability commitments1 → 0.2 d
  • The filing category for each product and market2.5 → 0.4 d
  • Writing the assessment for the change board0.5 → 0.2 d

Estimated split for one Major change assessed by hand across four to six reviewers, and with the solution.

How it works

How a change moves

Seven agents grow each change into a cited impact tree and add what similar past changes needed; QA accepts, the change board signs.

What comes in
Change inChange request · from the quality system
Agents at work
Change Readerwhat, where, which products
Then
Document Finderprocedures · forms
System & Equipment Matchersystems · equipment
Spec, Product & Stability Checkerspecs · products
Registration Checkermarkets
Then
Past-Change Comparermissed-impact catch
Then
Impact Writer & Plannercited impact tree
A person decides
Change boardowner and QA review; the board votes and signs
What comes out
Cited impact tree
Signed board decision
Task plan with a release gate
One case, step by step

One supplier change, from request to signed plan

Northwind Bio's Plant 3 in Leiden needs a second 2,000 L bioreactor bag supplier for Veltrimab and Corventa drug substance after its current supplier, Arvion Bioprocess, cut 2027 allocation by 40%. Here is change CC-26-1184, screen by screen, in the working solution.

  1. 01Before Thursday's board

    The request lists three items

    Dana Okafor · QA Operations lead, board chair

    Omar Haddad raised CC-26-1184 on Oct 2: qualify Tessmer Single-Use as a second 2,000 L bioreactor bag supplier, a Major supplier / material change on the agenda for Thursday Oct 8. Section 4 of his request lists the known impact: SOP-USP-031 and SOP-USP-044 to be revised, and a CBE-30 for Veltrimab in the US. The tree shows exactly that — three items.

    “Section 4 · Known impact: SOP-USP-031 and SOP-USP-044 to be revised. Regulatory: CBE-30 for Veltrimab in the US.”

  2. 02One click

    “Grow the impact tree”

    The agents

    The Change Reader turns the request into what changes, where and for which products. Then four agents search in parallel: 2,412 SOPs and forms, 318 validated systems and 604 equipment items, 1,904 specifications, and 412 registration dossiers across 38 markets. Branches appear as they work — batch records, the MES recipe, the bioreactor qualification, the market filings.

    Each branch is coloured by where it came from: listed by the owner, found in the sources, added from past changes, or checked and not affected.

  3. 03About 15 seconds later

    31 items touched, in nine areas

    Impact Writer & Planner

    The tree grows to 8 documents, 3 systems, 3 equipment items, 1 specification, 2 products, 10 market filings, 1 stability commitment, 2 supplier items and 1 training curriculum for 56 people. Twenty-six were found in the sources, and three were checked and found not affected — the drug substance release specifications, Talmirex, and Corventa in the US and EU.

    “2 filings the owner did not list — no document names them, but similar past changes needed them: Veltrimab · JP and Corventa · UK.”

  4. 04The missed-impact catch

    Two filings nobody listed, in amber

    Past-Change Comparer

    The comparer ranks 6,830 closed changes and reads the top three. CC-24-0611, a second sterilising filter supplier for Veltrimab (81% similar), needed a Japan minor change notification: Japan's approval matters name the bag material — “polyethylene-based bag” — not the supplier, so a supplier search misses it. CC-25-0219 (78%) missed a UK Type IB for Corventa, because the UK did not adopt Corventa's lifecycle document; it was filed four months late with a deviation.

    The Past-Change Comparer adds a branch only with the past change that proves it, and never removes one.

  5. 05Branch by branch

    Which recipe step, not “MES impacted”

    Sam Patel · Validation lead

    Every branch opens the passage that proves it. MES recipe VLT-DS-USP v12, step 4.2, accepts only the current supplier's barcode format, so it would reject Tessmer's GS1 labels. At 78% confidence it is marked “your call”. The Cork precedent, CC-25-0732 (94% similar), found this rule and the incoming-inspection SOP only after approval, and its first batch was 9 days late.

    “Step 4.2 rejects the new supplier's GS1 labels. The scope of the regression test is a judgement for Validation.”

  6. 06The impact matrix

    3 in the request, 28 found by the agents

    Dana Okafor · QA Operations lead, board chair

    The matrix lays the same items out by area, each with its disposition — Revise, Follow, Update, OQ addendum, New recipe — its confidence and its source: 12,480 sources searched, 43 passages cited. Dana accepts each item or marks it not affected. Three need a person's call because they sit below 85%: the MES recipe, Japan, and the TF-90 film's extractables data.

    Items under the confidence line are never accepted in bulk.

  7. 07Filings

    A draft category for each product and market

    Lena Ortiz · Regulatory CMC lead

    The Registration Checker drafts 24 cells for Veltrimab and Corventa drug substance: 7 notify and wait, 7 implement then tell, 2 prior approval in Brazil, 2 no filing and 1 your call in Japan; the other 5 are markets where the product is not registered. Corventa needs no filing in the US or EU, because its approved lifecycle document (ICH Q12) says the bag supplier is not an established condition. The grid goes to Lena to confirm, and every cell stays a draft until she does.

    “Release gate: no Tessmer-bag Veltrimab lot ships to the US until 30 days after FDA receives the CBE-30, or to Brazil before approval.”

  8. 08Thursday, 10:00

    Votes, with conditions in the reviewers' words

    The change board

    Omar agrees. Lena agrees with a shipping restriction per market until the filing clock allows. Sam agrees with a risk-based MES regression test of the bag-lot step and the batch record print. Priya Raman agrees on condition that extractables coverage of the 30-day harvest hold is confirmed before the first GMP batch — the supplier's study covers 40 °C for 21 days. Quorum for a Major change, QA, Regulatory CMC and Validation, is met.

  9. 09Signed

    Approved with three conditions

    Dana Okafor · QA Operations lead, board chair

    Dana signs with her password and the meaning “Approved as change board chair”. The decision carries three conditions: a shipping restriction per market, extractables coverage of the 30-day harvest hold, and no first batch until all 11 gating tasks are done. The three open calls go with it, each to its owner, to decide before the first GMP batch: the MES recipe to Sam Patel, Japan to Lena Ortiz, the TF-90 extractables data to Priya Raman.

    “Your signature applies to CC-26-1184 — approve with 3 conditions and 3 open calls carried as conditions.”

  10. 10The plan follows

    14 tasks and a release gate on Nov 20

    Impact Writer & Planner

    The planner turns accepted items into 14 tasks with owners and dates, each linked to the branch that created it. Eleven gate the first batch: documents, the raw material specification, ERP, MES and LIMS, the OQ addendum for BR-301 and BR-302, the Tessmer audit and quality agreement, the extractables check and training for 56 people. The first batch on Tessmer bags can be released on Nov 20, six weeks after approval; the Cork precedent took seven.

    The release gate always includes supplier qualification and training.

Who it’s for

Built for everyone who signs off a change.

The same change, seen by the five people who assess it — in their own words, and what their week looks like now.

DO
Dana OkaforQA Operations lead · change board chair, Plant 3 — Leiden
QA Operations lead
Before
“I don't want to find the missing filing after the first batch ships.” Chairs Thursday's board and signs every Major change, on assessments pieced together from four to six reviewers.
Now
Opens a change already grown into a cited tree, with the missed items in amber; accepts branch by branch and signs with conditions.
OH
Omar HaddadMSAT engineer · raises supplier and process changes
MSAT engineer · change owner
Before
“I listed what I knew. I didn't know the MES only reads one label.” Writes the known impact from what he can see upstream.
Now
Raises the change as before; the agents find the other 28 items, and he gets tasks linked to the branches that created them.
LO
Lena OrtizRegulatory CMC lead · confirms the filing category per market
Regulatory CMC lead
Before
“Japan names the material, not the supplier — a keyword search will never find it.” Works out each market's category from the dossiers and rule books.
Now
Confirms a drafted product × market grid where every cell cites the registration text behind it, and the rule-book entry where one applies.
SP
Sam PatelValidation lead · sets the assurance scope
Validation lead
Before
“Tell me which recipe step, not ‘MES impacted’.” Has to dig out what each system actually hard-codes.
Now
Sees the recipe step, the field rule and a proposed risk-based test, and decides how wide the regression goes.
PR
Priya RamanQC lead · owns specifications, methods and E&L
QC lead
Before
“21 days at 40 °C is not 30 days at 2–8 °C.” Checks supplier extractables data against the real process by hand.
Now
Gets the extractables gap as a named call in her queue, carried into the plan as a condition before the first GMP batch.
Built on the engine

7 agents. Each with one job, and hard limits.

Seven agents grow each change into a cited impact tree and add what similar past changes needed; QA accepts, the change board signs.

Change Reader

Reads the change request and turns it into what changes, where, for which products and materials, and what the owner already named as impact.

  • Never edits the QMS record
  • Flags vague descriptions back to the owner
Document Finder

Searches SOPs, work instructions, forms and master batch records for every document the change makes wrong, and the people trained on each.

  • Every item cites the passage it found
  • Proposes Revise, Follow or Not affected — a person decides
System & Equipment Matcher

Matches the change to validated computerised systems (ERP, MES, LIMS) and qualified equipment, with a proposed assurance level.

  • The assurance level is a proposal for Validation
  • No change to any system configuration
Spec, Product & Stability Checker

Checks specifications, methods, products and stability commitments — including the ones that are not affected, with the reason.

  • Records the evidence for every “not affected”
Registration Checker

Reads each registration and the country rule books and drafts the filing category per product and market, through an ICH Q12 lens.

  • Every category is a draft until Regulatory CMC confirms
  • Below 80% confidence it says “your call”
Past-Change Comparer

Finds the most similar closed changes and adds the branches they needed that this change does not yet have — the missed-impact catch.

  • Adds a branch only with the past change that proves it
  • Never removes a branch another agent found
  • Every added branch is reviewed by a person
Impact Writer & Planner

Writes the cited impact assessment for the board, and after approval turns accepted items into an implementation plan with a release gate.

  • Tasks only from accepted items
  • The release gate always includes supplier qualification and training
Change board

Votes and signs, with conditions. The agents propose; a named person decides.

Ask in plain words

Ask about any change, in plain words

Ask about any change, its impact, the filings or the board — every answer points to the passage behind it.

What did the owner of CC-26-1184 miss?

CC-26-1184 touches 31 items in 9 areas; the owner listed 3. Two of the others are filings that only past changes revealed: Veltrimab in Japan, where approval matters name the bag material, not the supplier, and CC-24-0611 needed a filing for the same reason; and Corventa in the UK, which did not adopt the lifecycle document — CC-25-0219 filed four months late. Also likely to stop the first batch: incoming inspection SOP-WH-012 and the MES label rule.

Which markets need a filing for CC-26-1184?

Draft filing plan, for Lena Ortiz to confirm. Veltrimab: notify and wait in the US (CBE-30), EU, UK and Switzerland (Type IB), Canada and Singapore; prior approval in Brazil; implement then tell in Australia, China and Korea; your call in Japan. Corventa: Type IB in the UK; no filing in the US and EU, because the bag supplier is not an established condition. No Tessmer-bag Veltrimab lot ships to the US until 30 days after the CBE-30 is received.

Is the E&L data enough?

Probably, but it is QC's call. The supplier's study covers 40 °C for 21 days; the culture runs 16 days at 36.5 °C, so that is covered. The harvest can sit in the bag for up to 30 days at 2–8 °C — colder, but longer than 21 days. SOP-QC-207 asks for worst-case conditions. Confidence 62%, so it is in Priya Raman's queue as a condition before the first GMP batch.

Show me changes waiting on Validation

Three changes are waiting on Sam Patel: CC-26-1184 for the MES regression scope and the OQ addendum, CC-26-1175 for the EM software assurance plan, and CC-26-1171 for the interface retest, 70% done.

Every screen

The working solution, as it ships.

13 screens from the working solution, on its sample data. Pick one to see it large.

The impact treeThe change at the root and 31 cited items in nine areas, coloured by where each came from, with the two filings the owner missed in amber.
What the owner listedThe request's three items, the three most similar past changes, and the change request open at its known-impact section.
Agents growing the treeBranches appear as the agents search procedures, systems, equipment, specifications and registrations, then compare past changes.
The missed-impact catchVeltrimab in Japan, added from a past change: the approval matters passage and the past change that needed the same filing.
One branch, its proofMES recipe step 4.2 with the field rule it quotes, its confidence, and Accept or Not affected.
The impact matrixThree items in the request against 28 found, by area, with dispositions, confidence and the three calls below 85%.
Filings by product and marketA draft category for each of 24 cells, the lifecycle document behind “no filing”, and the shipping release gate.
The change boardVotes with each reviewer's condition, the quorum for a Major change, and the decision.
Sign the decisionThe signer, the meaning of the signature, and each open call carried as a condition to its owner.
The implementation planFourteen tasks with owners and dates, the eleven that gate release, and the first batch on Nov 20.
All change controlsEvery change across four plants with its class, stage, clock and a nine-square impact fingerprint.
The dashboardChanges assessed, median assessment time, items the requests missed, first-pass approval, approval to use, and where changes land.
Your rulesThe confidence line, draft filing categories, precedents, board day, quorum, Minor-change approval, signatures and plain-language rules.
Governance

Built for GMP change control: cited, reviewed, signed.

Every branch cites its passageEach item on the tree opens the passage that proves it — in the QMS record, an SOP, the validated-system inventory, the equipment register, a specification, a registration dossier, a rule book or a past change.
Agents read; people change recordsThe agents read the QMS, document library, RIM and inventories. They never edit a change record, a system configuration or a registration without a person.
Filing categories are draftsEvery product × market category is a draft until Regulatory CMC confirms it. The setting is required by policy and cannot be switched off.
Low confidence goes to a named personItems under the confidence line — 85% by default — are marked “your call”, routed to their owner and never accepted in bulk. At signing, open calls become conditions.
Missed items are added, never removedThe Past-Change Comparer adds a branch only with the past change that proves it, shows it in amber, never removes a branch another agent found, and every added branch is reviewed.
Signed, gated and on the recordBoard decisions carry an electronic signature with its meaning. No changed batch is released until every gating task is done, and every agent step and human decision is on the activity trail.
Configuration

Your change control procedure, as settings

How the agents assess changes and how the board decides — set once, in plain words.

SettingDefaultChoose from
Send to a person below this confidence85%75% · 85% · 90%
Filing categories are draftsOn — Regulatory CMC confirms every product × market categoryRequired by policy
Look for precedents at every siteOn — search 6,830 prior changes for one of the same kindOn · Off
Assess new changes as soon as they arriveOnOn · Off (the owner starts the assessment)
Board meetsThursdays · 10:00Agenda pack goes out the afternoon before
Major changes needQA, Regulatory CMC and ValidationQA · Regulatory CMC · Validation · QC
Minor changes approved without the board byQA aloneWho can approve without the board
Rules in plain words“A change to a product-contact material always opens an extractables and leachables item.”Add a rule — added by Priya Raman, Aug 2026
Connections

Works with the systems a change already touches

QMSchange requests, prior change controls and their deviations
Document librarySOPs, work instructions, forms and master batch records
Registrations (RIM)dossiers, lifecycle documents and country rule books
Validation inventoryvalidated systems and qualified equipment
ERPmaterial masters, approved supplier lists and where-used
Training systemwho is trained on each document that changes
What it changes

The difference, in numbers.

Every figure is labelled: a target the solution is built to, an estimate, a typical published result, or a proven one.

target
1.4days
median from triage to a complete, cited impact assessment
By hand≈ 9 days
With agents≈ 1.4 days
target
34%
of touched items on average were missing from the request; the agents found and cited them
missing from the request, found by the agents
target
87%
of changes approved at the first board, none sent back for information
first-pass board approval

“demo” = seen in the working solution, on its sample change controls · “target” = the design goal, measured in the live solution · “estimated” = our estimate · “typical” = published figures (ISPE and PDA on ICH Q12 — global approval of a simple post-approval CMC change can take up to five years). People, companies, products, suppliers and change records named on this page are fictional — characters and sample data in the working solution.

Questions

What QA and Regulatory CMC teams ask us.

What is change control impact assessment?

It is the step in GMP change control where QA and the reviewers work out everything a proposed change touches — SOPs, validated systems, equipment, specifications, products, market filings, stability, suppliers and training — before the change board decides. Change Control Impact Assessment has seven agents do that search, cite every item and add what similar past changes needed, for QA and the board to decide.

How does it find impacts the change owner did not list?

Four agents search the document library, validated-system and equipment inventories, specifications and registrations in parallel. Then the Past-Change Comparer ranks closed changes by similarity, reads what the top three needed — including items found late or after implementation — and adds any branch this change lacks, in amber, citing the past change.

How does it decide the filing category in each market?

The Registration Checker reads each registration, its lifecycle document where there is one, and the country rule book, and drafts a category per product and market — prior approval, notify and wait, implement then tell, or no filing. Every category is a draft until Regulatory CMC confirms it, and below 80% confidence it is marked “your call”.

Does it decide whether an item is affected?

No. The agents propose a disposition such as Revise, Follow, Update or Not affected, with the passage behind it and a confidence. QA accepts each item or marks it not affected, and items below the confidence line go to a named person and are never accepted in bulk.

Does the AI change our QMS, systems or registrations?

No. The agents read the QMS, document library, RIM and inventories, and never write to them without a person. After the board signs, the planner creates tasks only from accepted items.

Do people stay in control of the decision?

Yes. QA accepts each branch, Regulatory CMC confirms the filings, Validation sets the assurance scope, the change board votes and the chair signs with the meaning of the signature. Open calls become conditions with an owner, and no changed batch is released until every gating task is done.

Can we set our own thresholds, quorum and rules?

Yes. The confidence line, precedent search, assessing on arrival, board day and time, the votes a Major change needs, who approves Minor changes and plain-language rules are all settings. Draft filing categories and electronic signatures are required by policy.

How long does it take to go live?

The Agentic Solution Engine builds and deploys it from your requirements and documents — your change control SOP, document library, system and equipment inventories, registrations and a sample of closed changes — and it goes live once every quality gate has passed. We will walk you through it on your own changes first.

See it on
your changes.

We'll run Change Control Impact Assessment on a sample of your own closed change controls.