- Before
- Can tell you the number in a minute; spends the day proving where it came from, in a workbook nobody else can read.
- Now
- Opens a schedule already drafted, with the ledger under every figure, and decides the twelve accounts that actually need judgment.
Call report preparation on one account, from the ledger to a signed schedule
Tessaly Community Bank, $3.4 billion in assets and 41 branches, is filing the FFIEC 041 for the September 30, 2026 report date. It is day 9 of a 12-business-day close, and the filing deadline is Friday, October 30. Here is what happens, screen by screen, in the working solution.
- 01Day 9 of 12
One Call Report schedule at a time — not a dashboard
Nadia Farrell · Regulatory Reporting AccountantSchedule RC-C Part I opens as the form reads: item number, caption, amount in thousands, down the page. Item 1.e.(1), loans secured by owner-occupied nonfarm nonresidential properties, reads $512,604 thousand. One line at the top says what needs Nadia today, and one chip in the header says a tie-out does not hold.
“12 · Accounts the agents could not place yet · 1 on this schedule · 11 on other schedules.”
- 02One click
Every amount opens to the ledger accounts that feed it
Nadia Farrell · Regulatory Reporting AccountantItem 1.e.(1) folds out to three general ledger accounts: 1425-100 commercial real estate, owner-occupied, at $398,118,204.00; 1425-200 small business program at $86,422,300.00; 1426-100 medical and dental at $28,063,496.00. They total $512,604,000.00, which rounds to $512,604 thousand as reported. The instruction paragraph for the line sits beside the total.
The Call Report reports whole thousands; the ledger carries dollars and cents. Both are on the same screen.
- 03The tray
1,828 accounts placed without asking; 12 that need a person
The agentsThe Ledger agent proved the trial balance on October 1 and carried 1,828 placements forward from June 30 untouched. Twelve accounts are left: eight opened this quarter, two redescribed by their source system, one reclassified and one changed at the report date. Each row carries the balance, why it is here, the schedule and numbered line the agents propose, the instruction sentence that decides it, and a confidence.
One button accepts the five above 0.85 in a single approved action — and still records an entry for each.
- 049:36
A new account, and the evidence behind the line proposed for it
The Mapping and Instruction agentsAccount 1427-310, CRE participations purchased, partner program, holds $18,412,550.00 across 31 loans and was opened on August 3, 2026. The Mapping agent proposes Schedule RC-C Part I, item 1.e.(1), at confidence 0.82 — under the bank's 0.95 threshold, so it waits. Its evidence: core banking collateral code 22 on all 31 loans, purpose code OO on 29 of 31 with an occupancy certification for the other two, and the same program's loans already on 1.e.(1) at June 30.
Instruction agent, quoting the form: “…the primary source of repayment is the cash flow from the ongoing operations and activities conducted by the party, or an affiliate of the party, who owns the property.”
- 059:38
“I will not place the gross balance”
The Tie-out agentContra account 1427-315 holds $4,200,000.00: three of the 31 loans were participated onward to another bank under an agreement dated August 14, 2026. The line takes the net, $14,212,550.00, reported as $14,213 thousand. The agent says what the instructions settle and what they do not — they settle the line; the contra account settles the amount.
“After this placement item 12 becomes $2,546,869 thousand — Schedule RC item 4.a ($6,415) plus item 4.b ($2,540,454).”
- 069:41
A person accepts, with a reason code, and the schedule re-foots
Nadia Farrell · Regulatory Reporting AccountantNadia accepts the net with reason NEW-ACCT and a note for the reviewer and the examiner. Item 1.e.(1) moves to $526,817 thousand and item 12 to $2,546,869 thousand. The footer chip that read “Off by $14,213 thousand” now reads “Ties to RC 4.a + 4.b”. The difference was exactly the one account still waiting.
Accepting makes Nadia the maker. It does not report the figure: the Assistant Controller approves every new or changed placement before the schedule can be signed.
- 07The report
21 schedules, their owners, their states and their own due dates
Nadia Farrell · Regulatory Reporting AccountantSeventeen are ready, three are in review and RC-C Part I is drafting. Each schedule carries the result of its tie-outs and a due date inside the 12-business-day close; Schedule RI and Schedule RI-C are past theirs and can be escalated to the Controller. Three schedules are not required this quarter, and the screen says why.
Six things must hold before a data file is assembled. The screen lists all six, and which ones do not.
- 08Before filing
The edits run before the file leaves the bank
The Tie-out and Edit-check agents1,874 validity edits ran and none failed. 212 quality edits ran and three still stand, each with an explanation drafted from the quarter-over-quarter analysis and citing the accounts behind it. All ten cross-schedule relationships hold, with both figures and the difference shown for each.
A schedule cannot be marked ready while a relationship fails, and a preparer cannot override that.
- 09Quarter over quarter
The explanation is written before anyone asks for it
The Variance agentFourteen lines moved more than 10 percent or $1,000 thousand. Item 1.e.(1) rose from $468,920 to $526,817 thousand, up 12.3 percent: $14,213 thousand is the new partner-program account, and $43,684 thousand is 61 loans originated in the quarter, the largest $4,120 thousand. The same text can become the explanation for quality edit Q-0412.
“No loan moved onto this line from another line.”
- 10The review
The reviewer reads what changed, and nothing else
Grant Okonjo · Assistant ControllerThree changes wait for Grant and two are already approved; the 1,828 carried-forward placements are not in the review at all. Each change names its maker, the time, the reason code, the note and the instruction paragraph it relies on. In the preparer's role, Approve is unavailable on every row and says why.
“Only the Assistant Controller can do this.” The same person is never both maker and checker.
- 11Sign
The signatures the form asks for, and no file before them
Marisol Vega · ControllerWith 17 of 21 schedules signed ready, the Controller cannot sign and no data file exists. The screen names everyone who signs: the Controller, the Chief Financial Officer who signs the declaration the form requires, and two directors who attest to the report's correctness — two, because this is a state nonmember bank — with the instruction quoted underneath.
Where the instructions do not resolve a difference, the Controller — and only the Controller — may accept it with a reason.
- 12After
The whole quarter, in one trail and one file
Theo Lindqvist · Internal Audit ManagerEvery placement, override, approval, signature and export is on the trail, people and agents on the same terms, each entry naming its schedule, its reason code and the evidence behind it. Internal audit reads all of it and can change none of it, and exports the evidence as an examiner pack, an internal audit pack or a Part 363 pack.
“Oct 14 09:38 · Tie-out agent · held RC-C Part I out of ready: item 12 is $14,213 thousand below Schedule RC items 4.a plus 4.b.”