Well Integrity Management demo

Integrity engineers see each well drawn with its barriers, every element tied to the test that proves it, and status changes left to a signed decision. 1:23

What the demo shows

Keeps barrier status, tests and anomalies current across wells, for well integrity engineers.

Agents read test records in every format, trace each of 14 barrier elements on every well to its proof, watch 2,480 annuli against limits and propose a status change with reasons. A well integrity engineer proposes, a well integrity authority signs, and agents never close a valve, clear an anomaly or edit a test.

Transcript

  1. Well Integrity Management keeps barrier proof current for well teams.
  2. In May 2010, one offshore regulator counted over 8,000 wells with sustained pressure.
  3. The barrier envelope draws each well as six agents read.
  4. On 14 to 118, the annulus climbed 40 PSI a week to 78% of its limit.
  5. Prove the safety valve and the agent reaches the chart.
  6. It is 14 days overdue.
  7. A workover left its plan on the old valve.
  8. The agent proposes restricted.
  9. The engineer agrees. The authority must open all five items before signing.
  10. She signs, and the test goes to Paul with a date.
  11. Agents never close a valve or edit a test.
  12. Result, 16,981 of 17,360 proven and 97 shown as improven.
  13. Built on Botminds: agents, data, screens, and governance on one platform.

Transcribed from the film’s narration. Captions are on the player.