Stage Gate Review demo

Gate panels see each assumption tied to every page that uses it, and where a number has frayed, before the project’s sanction decision. 1:24

What the demo shows

Tests FEED and gate packages against gate criteria before FID, for gate panels and boards.

Agents read the whole gate package, tie each tracked assumption to every deliverable that uses it, and set each team score beside what the pages prove. Owners reply on a clock, the chair rules and writes why, and a second panel member signs. Agents never vote.

Transcript

  1. Stage Gate Review tests feed packages against gate criteria for gate panels.
  2. This package is 1,906 hours by hand.
  3. Agents read 3,771 of 3,812 deliverables.
  4. The team claims a clean gate.
  5. One red string pulls tight.
  6. 35% water cut in design.
  7. 58 by year 6.
  8. The train takes 60,000 barrels a day.
  9. The peak is 92,000.
  10. Beatriz opens her forecast and confirms it, and three holds are drafted for the chair.
  11. The chair opens each hold, sees its owner and what it stops, and confirms it.
  12. At the sitting, she moves go-to-go with holds on $2.4 billion and writes why.
  13. A second panel member reads and signs.
  14. Agents never vote. The board gets go with holds.
  15. Three owners, three dates, two signatures.
  16. Built on Botminds.
  17. Agents, data, screens, and governance on one platform.

Transcribed from the film’s narration. Captions are on the player.