Proved Undeveloped Reserves Review demo

Reserves engineers test undrilled locations against their development deadline the morning a rig plan or budget moves, not at year-end. 1:24

What the demo shows

Tests proved undeveloped locations against adopted plans and the five-year rule, year-round.

Agents read each plan change, re-test every location against its five-year line the moment the reading is confirmed, look for free rig days and draft the reasons. A reserves engineer decides, the committee chair checks a sample and signs, and the controller signs second; any keep past the line needs a written reason for each location.

Transcript

  1. Proved Undeveloped Reserves Review tests undrilled locations against the five-year rule.
  2. Each location has a clock, slip a rig, and it resorts.
  3. Emica confirms the new rig schedule.
  4. Rig three stops for two quarters.
  5. Agents retest 642 clocks.
  6. 47 locations, 38.2 million barrels, slide past the line.
  7. Emeka moves pad 8 onto Rig 4's 140 free days, Katarjina funds it, and Sanjay keeps the 9.
  8. The other four pads have no rig in time, so they move out.
  9. Helene, the chair, reads the memo and four sampled records, each with its decision, numbers, and source, before she can sign.
  10. She signs, then the controller opens it and signs second.
  11. Eight weeks before year-end, 604 locations, 184.9 million barrels.
  12. Built on Botminds: agents, data, screens, and governance on one platform.

Transcribed from the film’s narration. Captions are on the player.