- Sees
- Each pad's wells against their line, with the agents' findings and sources
- Signs
- Keep or move out, pad by pad, with a reason for each
One rig stand-down and 47 proved undeveloped locations, settled by 10:43
The board has stood a pad rig down for two quarters to hold spending flat, and the new rig schedule is issued at 08:40. This is that morning, from the first reading to the second signature.
demoThe field, its rigs and pads, the people and the volumes are all sample data.
- 0108:52
642 locations, 214.0 million barrels, and a rig schedule nobody has read
Reserves engineerEach thin bar is one booked location, from the year it was booked to its planned spud. Every booking year has its own five-year line, drawn as a stair, and nothing hangs past it yet. In the corner, the plan reader has found Rev 12 with the signed board minutes: Rig 3 stands down, pending the drilling planner.
- 0209:06
Rev 12 moves Rig 3 to the next July and takes $91M from next year
Drilling plannerRig plans are his, so the reading waits for him. A contract extension sits in draft, and older revisions moved no location. Rev 12 puts the next well on Rig 3 six months later, 181 days lost, and next year’s budget from $950M to $859M, each line with its page.
- 0309:09
Confirming one reading re-tests 642 clocks before he looks away
Drilling plannerHe confirms the reading, and the re-test starts on the spot. The log beside the runway shows each hand-off: 94 Rig 3 wells moved, all 8 rigs checked with Rig 4 showing 144 free days, the budget tied to $859M, and a pad-by-pad memo drafted. A draft schedule would have moved nothing.
- 0409:13
47 locations past the five-year line, named the day the schedule landed
Reserves engineerAmber slivers now hang past each stair: 47 locations and 38.2 million barrels of 214.0. Their wells had 0 to 180 days of slack, less than the 181 days lost. Pad order is fixed, so a six-month gap pushes far more than the twelve wells Rig 3 would have drilled.
- 0509:26
Rig 4 has 140 days to spare, and Pad 8 needs 139.5
Drilling plannerBefore anyone asked, the rig finder had checked each rig. Rig 4 finishes its own pads and sits idle for 144 days, less 4 to move. Pad 8 is the last pad, with exactly 9 wells at 15.5 days a well, so pad order holds. The planner puts Pad 8 on Rig 4 himself, and funding waits for the budget analyst.
- 0609:47
Funded and re-tested, all nine wells sit back inside their line
Reserves engineerThe budget analyst has moved $68.4M into the earlier year, since a location with no budget line is a wish. The pad re-tested at once, and its wells now show 141 to 17 days left. Only now does the decision open for the reserves engineer, with the reason back inside the line on another rig. He keeps all 9.
- 0710:10
Four pads move out of proved undeveloped, one opened pad at a time
Reserves engineerA rig takes whole pads, so each pad is one decision. Pads 4 to 7 have no free rig and no adopted plan that drills them inside five years. He opens each pad and its sources before moving it out. The table closes at 9 kept and 38 moved out, 9.1 and 29.1 million barrels.
- 0810:19
The chair cannot sign until she opens the memo and four records
Chief reserves engineer, committee chairAbove the resolution sits the chain of who did what. Signing waits until the chair has read the reasons memo and opened four sampled locations. This one is a keep: on Rig 3 it would spud 56 days past its line, on Rig 4 inside it. She can agree, or send it back with her reason.
- 0910:37
Nothing takes effect until the controller signs second
Corporate controllerThe chair signed at 10:32. The controller opens the same resolution: 9 kept, 38 moved out, 29.1 million barrels, 13.6% of proved undeveloped. No location is kept past its line, and the dialog says what the chair opened. Either of them can send it back in writing.
- 1010:43
604 locations and 184.9 million barrels, signed 8 weeks before year-end
Reserves committeeOn the signed resolution the runway re-sorts, and nothing hangs past a stair. The 38 moved-out wells stay in the drilling plan and come back as proved when drilled. The question an auditor would ask in the new year already has an answer on file, with names, times and pages.