Production Deferment Management demo

Production engineers trace each lost barrel from the shift entry to its root event, so a compressor trip is signed as one event, not well by well. 1:23

What the demo shows

Traces each lost barrel to its root event from logs and work orders, for production engineers.

Agents read every loss entry without changing it, gather the log, trip record, work order and tests, measure each well against what it could deliver and propose one root event with its reasons. A production engineer rules and signs, the operations manager countersigns, and the month ties to production accounting through five gates.

Transcript

  1. Production Deferment Management traces lost barrels to root events for production engineers.
  2. Seven agents read the log, trip record, work order and tests.
  3. Forty well problems become one cause.
  4. Against well tests, 8,210 barrels, not 9,536 booked.
  5. The work order, rod scored, so rod and packing replaced.
  6. Anna rules on three wells, a planned job that never started moves to unplanned.
  7. Then she signs it.
  8. Tamor opens each record again himself.
  9. Nobody countersigns unread. He checks her three wells and countersigns.
  10. Entry stay is typed.
  11. The ledger drops 1,183 barrels and ties to accounting.
  12. As signed, compression, not the wells, is March's top unplanned cause.
  13. Built on Botminds: agents, data, screens, and governance on one platform.

Transcribed from the film’s narration. Captions are on the player.