Preventive Maintenance Optimization demo

Preventive routines shown with what they really found and why they were written, and each change to them signed by a maintenance strategy engineer. 1:23

What the demo shows

Reviews each PM task against failure history and cost; engineers approve every change.

Agents read every closeout for real findings, trace why each routine exists, lock what is safety-critical or legally required, and propose bundles to keep, change, stop or tighten, judging hidden failures on test results. An engineer decides, the technical authority opens a sample and signs, and a planner loads the change. A year later the agents check the result.

Transcript

  1. Preventive Maintenance Optimization shows engineers which routines earn their hours.
  2. Block 14 spends 214,000 hours a year without knowing what they find.
  3. The worth-it plot, hours against real findings.
  4. 612 motors, 5,800 hours a year, 19,584 closeouts, 3 real findings.
  5. The task comes from a 1987 manual for long-gone motors.
  6. Safety tasks stay locked.
  7. 41-seal gas filters tighten.
  8. It proposes yearly, saving 4,350 hours.
  9. Alejandra agrees. The technical authority opens the five riskiest motors one at a time.
  10. He reads the change record and signs on the audit trail.
  11. In all, 17,739 net hours a year for beds a day.
  12. Built on Botminds: agents, data, screens, and governance on one platform.

Transcribed from the film’s narration. Captions are on the player.