LMP-APH-9H-L against LMP-APH-7H-L: three records agree, and the marker etched 240 plates with the other one.
Line clearance on a lot of 240 locking plates: built 7-hole, marked 9-hole
Proximal humerus locking plates, left, 7-hole, packed on Line 4 after a 9-hole lot. The marker on that line is the only standalone one, and its log uploads when the lot closes.
demoThe plant, its lines, the people, the plates and each count here are sample data.
- 0118:38
Three records sit on the 7-hole plate, and the marking program on the 9-hole
Packaging engineerOf 48 lots packed in the last 24 hours, 41 agree and balance and 7 need a decision. At the top, a lot of 240 left 7-hole humerus plates is blocked. In the mirror, its build order, artwork and clearance record land on the left 7-hole; the marking program lands on the 9-hole: LMP-APH-9H-L rev F, HOLES=9. Marker 4 etched all 240 plates with it.
- 0218:40
Item 7 was ticked at 14:16, and the first piece was marked at 14:24
Packaging engineerShe opens the clearance record from the agents' note. Item 6 says the marking program was changed to the new part, yet the marker log shows no program load after 06:02. Item 7, first marked piece checked against the drawing, was ticked at 14:16 and verified at 14:18, eight minutes before that piece existed. Both items carry their sources.
- 0318:53
The marker still runs the 9-hole program, so she stops Line 4
Packaging engineerLine 4 has already started the next lot of the same work order with the same marker state. Stopping a line is the safer direction, so it takes effect at once. Her signature records that the next lot is at risk, and the 8 plates marked so far go on hold. A restart will need a new clearance, verified and signed.
- 0418:54
All 240 plates go to the quarantine cage at once
Production supervisorThe shift supervisor switches to his own view and quarantines the lot: 240 units into cage Q-2 under a nonconformance, reason size mismatch. A hold acts at once and is read afterward. Lifting it will need the QA inspector and the site quality head, and the lot goes back through the check before anyone can sign it.
- 0518:55
QA opens the marker log at the line that started the lot on the 9-hole program
QA inspectorThe QA inspector opens the Marker 4 log the agents cited. At 14:24:37 the first piece, plate 001, is marked with LMP-APH-9H-L rev F, SIDE=L, HOLES=9, and there is no load event between 06:02 and 18:36. Having read it, she signs the hold as read and understood. The label gap still has to be found before the lot can be signed.
- 0618:57
41 clean lots, signed together only after she opens 5 picked at random
Packaging engineerThe 41 lots that agree and balance, 9,960 units, can be signed in one go only after the packaging engineer opens a random 10%, at least 5, each with its four records and label count. She opens the first, a right 5-hole plate lot, and marks it checked. Signing stays locked until all five are checked, and QA countersigns after her on its own sample of printed labels.
- 0718:57
Four holds, 868 units, each showing whether QA has read it
Packaging engineerThe holds list shows what the evening's calls blocked: the 8 plates of the next lot, the 240 in quarantine, and two earlier mismatches on nails and screws. Each hold carries who placed it, where the parts sit, the reason in the signer's words and whether QA has read it. The 2 unaccounted labels, an outer carton and a patient-chart label, are still to find.