SearchIT/OT Security & Compliance

OT Incident Response

OT incident response for electricity and water. One plain question brings up your playbook step, drawing, contact and reporting clock

See one case, screen by screen ↓
Watch with transcript →

Built forIncident commandersSecurity analystsShift supervisorsPlant managersCompliance managers

The Problem Today

During an incident at night, responders dig through binders for the playbook step and the vendor's phone line while a one-hour clock runs.

≈ 50%
of OT organizations have no response plan written for OT our estimate

Answers spread across binders

  • Playbooks
  • Zone maps
  • Contracts
  • Deadlines
  • A wrong cut hides the gridCutting the wrong link can blank the control room's view
  • Timeline rebuilt laterPieced together from memory, so the notice goes out late

The Solution

  1. Ask in plain wordsYour own playbook opens as a decision tree at the step you are on
  2. Customers shown for each cutThe zone drawing shows how many customers each option would leave unseen
  3. The right clock startsThe rules pick the clock from the facts, and the deadline shows on screen
  4. The commander signsThe notice is drafted from the timeline with each line cited, then signed

Built-in controls

  • Quoted only from the approved plan version
  • Read-only, so no command reaches a control system
  • The decision time is stamped and no agent can move it

What You Get

The notice is ready to sign within the hour, with proof of when the clock started.

  • Right vendor line, first callThe security line and contract clause that fit the incident
  • Follow-ups drafted on timeUpdates and lessons learned are written from one timeline
  • Each clock in one viewGrid, water and insurer deadlines for each open incident
In short

What is OT Incident Response?

OT is operational technology, the systems that run the grid and water plants. OT incident response software puts a utility's plan, playbooks, zone drawings, vendor contracts and reporting rules behind one question at the moment of an incident. In OT Incident Response, a responder types what is happening. The right playbook opens at the right step, with each instruction quoted. The reporting clock the rules choose runs beside it. The incident commander decides each branch and signs.

How to choose AI solutions for utilities →

Updated

The problem

When an incident starts at night, the answers responders need are buried in binders

Electric and water utilities run their grids and plants with OT, the operational technology that controls physical equipment. When a cyber incident hits those systems at night, a small team must respond fast. They need the right step of their response plan. They also need the network drawing, the vendor's security phone line and the reporting deadline. Those answers are spread across a 64-page plan, nine playbooks, 14 zone and network drawings, 23 vendor contracts and five sets of reporting rules. They sit in binders and on SharePoint, and they were written for the auditor. Nothing brings them together when an incident starts. In the sample utility's last tabletop exercise, the night team took 22 minutes to reach the right playbook step. Finding the vendor's security hotline took 31 minutes.

Meanwhile the reporting clocks run. CIP-008-6 is the grid rule for reporting cyber incidents. Under it, the first notice is due one hour after the team decides it has a Reportable Cyber Security Incident. The notice goes to the sector ISAC, the industry's threat-sharing center, and to the national cyber agency. The hour runs from that decision, and the moment the attack was first seen does not count. So a team that does not record when it decided cannot prove it met the hour. The scattered papers cause other harm too. RTUs are the devices that link each substation to the control room. The drawing that shows which RTUs sit behind which firewall is in a different folder from the playbook. Cutting the wrong link can take away the control room's view of the grid. Afterwards, the timeline is rebuilt from memory. That is why the first notice, the 7-day update and the 90-day lessons-learned report are all written late.

estimated≈ 50%of ICS/OT organizations have no incident response plan written for ICS/OT
estimated82%of organizations in Dragos's incident response work have no clear rule for when an odd reading in operations should start a cyber investigation
estimated73%of Dragos's OT incident response cases, all time, involved VPN or jump-host logins that attackers had taken over
Where the first hour of an OT incident goes, in minutesestimated
By hand108 minutes
With the solution12.7 minutes
  • Finding the right playbook and the step you are on22 → 0.2 min
  • Finding the vendor's security line and contract clause31 → 1 min
  • Checking the zone drawing for what a block would cut15 → 1 min
  • Working out which reporting clock applies and when it starts10 → 0.5 min
  • Drafting the notification from notes and memory30 → 10 min

Estimated split, in minutes, by hand and with the solution. The first two “before” figures come from the sample utility's own last tabletop (22 and 31 minutes). The rest are our estimate.

How it works

The ICS incident response playbook, from first question to signed notice

What comes in
What they answer from5 sources · plan, playbooks, drawings, contracts, rules
Agents at work
Incident classifiertype + playbook
Then
Playbook navigator
Zone and asset resolver
Contact finder
Then
Reporting clock keeperrules choose the clock
Then
Timeline scribecited notice
A person decides
OT incident commanderdecides every branch, signs
What comes out
Cited step
Notice sent
Clock met
One case, step by step

A rogue vendor session at 02:51 and a CIP-008 notice sent at 04:02

A large utility runs substations, control centers and water works for electricity and water. On a Tuesday night at 02:51, a remote session opens on a jump host. A jump host is the server outsiders must pass through to reach the control network. The session uses an account of the utility's RTU vendor. It comes from an address that is not on the vendor's approved list. Here is what happens next, screen by screen, in the working solution.

A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.

  1. 0103:07

    The alert lands on the Respond screen, with the timeline already started

    OT SOC analyst, night shift

    The alert reports unusual DNP3 commands from an engineering workstation at the main control center. DNP3 is the protocol the control center uses to talk to substations. The severity is high. The running timeline already holds what the sensor saw. A jump-host session opened at 02:51 with no booked work window. The workstation read 7 RTUs, where its normal set is 2. It also sent two DNP3 select commands to a substation breaker, with no operate command after them. The plan's nine playbooks sit above it.

    “No clock running yet. Five rule sets are read for each incident: CIP-008-6, the water license, the cyber policy, CIRCIA and the plan's own targets.”

  2. 0203:09

    One plain question opens the right playbook at step 1

    OT SOC analyst

    The analyst types “Suspicious traffic on the SCADA network?”. The incident classifier names the playbook “Suspicious activity on the control network”. The navigator opens it at step 1 as a nine-step decision tree, quoted from §3.1, page 6. The plan's 60-minute target for the decision starts from detection, so it runs from 03:07 to 04:07. Beside the step, the agents show the jump-host session, the workstation's approval for read-only access to 2 RTUs and the vendor's 24/7 security line.

    Playbook §3.1: “Check the source against the approved connections list (ACL-SCADA). Call the vendor's security line to confirm any vendor session. Do not disconnect the source yet.”

  3. 0303:14 to 03:22

    Not approved and control not affected, so the tree moves on

    OT incident commander, on call

    The analyst calls the vendor's security line, which the support contract sets out in §9.2. No work is booked tonight, and the vendor never issued the account. Step 1 is answered “Not approved”. The contact finder pages the incident commander at 03:15, who joins the bridge call from home at 03:19. The control center's shift supervisor confirms that nothing has operated without an order. The breaker is closed, and the room can see all substations. The next branch is to contain at the conduit, the network link between zones, and keep control.

    Playbook §3.3 says to contain at the conduit rather than at the device. It also says: “Keep the workstation powered: do not reboot or log off.”

  4. 04Before anything is blocked

    The drawing shows who stays on supply

    Zone and asset resolver

    The resolver traces tonight's path on the current zone drawing. It runs from the outside address through the jump host to the workstation and the seven RTUs. Two ways to contain it sit side by side. One is to block the workstation at the control-network firewall, with a deny rule set up in advance. The front-ends keep polling all substations, and 0 customers are affected. The other is to pull the firewall itself. Then the control room loses its view, and 58,400 customers behind the 7 RTUs are out of sight.

    The resolver only reads the drawing. It sends no command to a control system or a firewall. The analyst turns on the rule by hand.

  5. 0503:33

    Contained, and the commander makes the decision

    OT incident commander

    The analyst turns off the vendor path for the account on the jump host at 03:29. At 03:31 they turn on the deny rule. The resolver checks that both front-ends still poll each substation. The incident commander records the containment. The workstation stays powered so its memory can be captured. Step 4 then sets out the facts. The jump host is an EACMS, a system that controls or monitors access to the Medium Impact EMS, the grid's energy management system. The workstation is a BES Cyber Asset inside the protected perimeter. The step also shows what each possible answer starts.

    “Reportable: notify within 1 hour. Attempt to compromise: by the end of tomorrow. Neither: no external notice.”

  6. 0603:41

    Reportable, and the rules swap the clock

    Reporting clock keeper

    The incident commander determines a Reportable Cyber Security Incident. The clock keeper stamps the time. The plan's own target for the decision is met with 26 minutes to spare. The clock keeper replaces it with CIP-008-6 R4.2. That rule says to notify the sector ISAC and the national cyber agency within one hour, so the notice is due at 04:41. The 7-day update clock is armed with it. So is the cyber insurer's 72-hour notice under clause 6.1 of the policy. The water license clock stays at n/a. CIRCIA is shown but not counted, because it is not yet in force.

    The clock keeper does not move a start time a person recorded. It does not send a notification either.

  7. 07The notice

    Drafted from the record, signed by a person

    Timeline scribe

    The scribe drafts the first notice from 14 timeline entries. CIP-008-6 Part 4.1 asks for the functional impact, the attack vector and the level of intrusion. Each is cited to its timeline entry. It notes that operation of a breaker was attempted but not achieved. The draft reads: “Reached a BES Cyber Asset (the engineering workstation) inside the Electronic Security Perimeter through an EACMS (the jump host)”. The incident commander reads it, edits it and signs.

    “The signature, the time and the text are kept on the record for three calendar years.”

  8. 0804:02

    Sent inside the hour, with 39 minutes to spare

    OT incident commander

    The notice goes to the sector ISAC portal and the national cyber agency. A copy goes to the CIP Senior Manager, who was told of the determination at 03:42. The clock stops and records the minutes to spare. The 7-day update clock under Part 4.3 is armed. It runs from the first new or changed fact.

    “Sent at 04:02:00 by the OT incident commander … 39 minutes inside the hour.”

  9. 09Afterwards

    The key times the auditor asks for

    Timeline scribe

    Each sensor event, branch answer, call and signature is on the incident's running timeline with its source. The key times sit beside it. The incident was detected at 03:07:00, the playbook opened at 03:09:09 and the threat was contained at 03:33. It was determined Reportable at 03:41:00, and the notice went out at 04:02:00, with 39 of 60 minutes to spare. The same record feeds the 7-day update and the lessons-learned review, due 90 days later.

    The scribe does not edit a signed entry, and each line keeps its source.

  10. 10The same morning

    Each open incident on one clock line

    Water treatment plant manager

    Tonight's incident is one of four on the clock line. At a water treatment works, there were 41 failed logins on an HMI, an operator's control screen. That incident runs on the water license's clock instead, which is 24 hours from detection. A wind farm's 7-day update is due later in the week. One substation's lessons-learned review is due at the end of the quarter. The facts of each incident chose its clock.

    The plant manager's clock comes from the water license, and it shows on its own line. The NERC grid rules do not apply to it.

Who it’s for

Five seats in one OT incident, from SOC analyst to plant manager

One night's incident through five seats: how it ran by hand, and how it runs now.

OT incident commander
Decides each branch and signs the notice
Before
Gets paged at home at 3 a.m. Then has to decide each branch of a 64-page plan and prove when they decided it was reportable.
Now
Joins the bridge call with the playbook open at the right step. The facts for the decision and the clock it starts are beside it, with how long is left.
OT SOC analyst
Watches the OT sensors overnight
Before
Watches the OT sensor console from 19:00 to 07:00 and sees the alert in seconds. Then spends twenty minutes finding the right page of the plan.
Now
Asks in plain words and gets the playbook step quoted from its page. The session log, the approved connections and the vendor's security line with its clause come with it.
Control-room shift supervisor
Runs the grid from the control center's EMS
Before
Has to say whether control is affected while someone else decides what to cut off. Needs to know first which customers sit behind it.
Now
Sees the conduit, the rule and the customers behind each RTU on the zone drawing before anything is pulled. The deny rule affects 0 customers.
CIP senior manager
Owns the plan and its tests
Before
Owns the plan, its tests and its lessons learned. Holds the team to a notice sent within the hour of the determination, with no exceptions.
Now
Approves each change to the rules and targets as a new version. Sees which playbook is due its 15-month test, and which drawing is older than the last firewall change.
Water treatment plant manager
Answers to the water license
Before
Owns the treatment control system and its license. That license has its own clock, separate from the NERC grid clock.
Now
Sees a water incident on the water license's 24-hour clock from detection, next to the clocks of each other open incident.
The agents

The first-hour agents behind each incident response step

Six agents find the step, the drawing, the contact and the clock. The incident commander decides each branch and signs.

Incident classifier

Reads the responder's question and the open OT sensor alerts. Names the incident type in the plan and the playbook to open, and says why.

  • Never declares an incident reportable. The incident commander decides
  • If no playbook matches, says so and opens none
Playbook navigator

Opens the approved playbook as its own decision tree. Highlights the current step and quotes it word for word, with its section and page.

  • Never skips, reorders or invents a step
  • Answers only from approved versions
  • A branch moves only on a person's answer
Zone and asset resolver

Finds each asset in the incident on the current zone drawings. For each way to contain, it shows the conduit, the firewall rule and the customers behind each RTU.

  • Never sends a command to a control system or a firewall
  • Flags a drawing older than the last firewall change
Reporting clock keeper

Reads the reporting rules again after each answer. Starts each clock at the event its rule names, which is detection, a decision or new information. Swaps and stops clocks, and reminds the incident commander before each deadline.

  • Never sends a notification
  • Never moves a start time a person recorded
  • Shows rules not yet in force without counting them
Contact finder

Matches the incident to the vendor contracts, the forensic retainer, the notice clauses and tonight's on-call rota. Names who to call, with the clause that says so.

  • Pages only the on-call list in the plan
  • Vendors and regulators are called by a person
Timeline scribe

Writes each event, answer, call and signature on the running timeline with its source. Drafts the first notice, the 7-day update and the lessons-learned report from it.

  • Never edits a signed entry
  • Every line keeps its source
  • Never sends a notice
OT incident commander

Decides every branch and signs the notice.

Ask in plain words

Answers from the plan, the zone drawings and the reporting clocks

Ask about the plan, the drawings, the contracts or the clocks. Each answer is quoted from an approved document. These answers use the sample data.

Is this reportable under CIP-008?

That is your decision, at step 4. The agents found these facts. The jump host is an EACMS of the Medium Impact EMS. It was used to reach the engineering workstation, which armed a breaker without operating it. A compromised EACMS meets the plan's definition of Reportable. If you determine it Reportable, the notice to the sector ISAC and cyber agency is due one hour after the time you record.

Who do I call at the RTU vendor at this hour?

The vendor's security line runs 24 hours a day. For a Severity 1 security incident, they call back within 30 minutes (support contract §9.2). Their only booked session this week was a change the day before. So tonight's session at 02:51 was not theirs to book.

What happens to customers if we block the workstation at the firewall?

Nothing. The rule set up in advance blocks only the engineering workstation. Both front-ends keep polling all substations, so the control room keeps its view. Pulling the firewall itself would take that view away. It would also put you on the loss-of-view playbook.

Draft the notice for the sector ISAC and cyber agency

The draft is open with the three items CIP-008-6 Part 4.1 asks for. They are the functional impact, the attack vector and the level of intrusion, each taken from a timeline entry. It needs your decision at step 4 first. Then you read it, edit it and sign. I do not send it.

The screens

The incident room, the zone drawing and the reporting clocks

From the working solution, on its sample data. Pick one to see it large.

The incident roomThe playbook as a decision tree at step 5. Beside it, the CIP-008 one-hour clock counts down from the determination, with each rule this incident carries.
Before the questionThe nine playbooks of the plan, the live alert, the running timeline from the sensor, and no clock yet.
Step 1: confirm the sourceThe step quoted from its page, with answer buttons for the branch. Beside it are the session, the approved connections and the vendor's line that the agents found.
Step 3: contain at the conduitTwo branches are answered and traced. The containment step shows the firewall rule to apply and the one not to pull.
The zone drawingTonight's path through the zones, the conduit's rule, and two ways to contain with the customers each one affects.
Step 4: the determinationThe facts for the incident commander's decision, and what each answer starts. That is one hour, the end of the next day, or no notice.
Sign and sendThe notification drafted from the timeline, each attribute cited, signed by the incident commander.
Notice sentSent at 04:02, 39 minutes inside the hour, with the 7-day update clock armed.
The running timelineEach event, answer, call and signature with its source, the key times the auditor asks for and the notice's attributes so far.
Reporting clocksEach open incident and each clock its rules started, on one time line, with what is met and what is due.
Contacts and escalationTonight's rota, the escalation order from the plan, the vendors and retainer with their clauses, and the notices the rules require.
Plans, drawings, contracts and rulesEverything the answers come from, with version, owner and last test, and what is due or out of date.
SettingsWhich clock starts from which event and goes to whom, the plan's targets and reminders, and who decides and signs.
Governance

Read-only OT incident response, decided and signed by a person

Quoted from the approved planEach instruction is quoted from an approved document with its version, section and page, such as §3.3, page 8 of the playbook. Old versions are never used for answers. The library flags any drawing older than the last firewall change.
Read-only toward OTNo agent can send a command to a control system, a firewall or an account. Containment is carried out by a person and recorded on the timeline, as the analyst did with the deny rule.
A person decides and signsThe incident commander answers each branch, makes the determination and signs the notification and its updates. The settings mark each of these “person only”.
The clock starts at the event the rule namesThe determination time is stamped when the incident commander records it. No agent can move it. Rules not yet in force, such as CIRCIA, are shown but not counted.
One timeline, kept for three yearsEach sensor event, branch, call and signature is written with its source and time. Signed entries cannot be edited. The record is kept for three calendar years as the evidence behind the dated notices and the lessons learned.
Rule changes are versions the CIP Senior Manager approvesEach change to a reporting rule, target or reminder is a new version that the CIP Senior Manager approves. The CIP Senior Manager is also told of each Reportable determination automatically.
Configuration

Reporting clocks, determination targets and escalation times, as settings

Which clock, from which event, to whom, and who decides, are settings approved by the CIP Senior Manager.

SettingDefaultChoose from
CIP-008-6 R4.2 · Reportable1 hour from determinationCounted on or off · to the sector ISAC and the national cyber agency
Water license24 hours from detectionCounted on or off · to the water regulator, for water incidents
CIRCIA · covered incidentOff72 hours from reasonable belief, counted once the final rule is in force
Determination target60 minSet in minutes from detection, per IRP-OT-01 §2.3
Page the incident commander if not escalated10 minSet in minutes, per IRP-OT-01 §4.1
Reminders before a deadline20 min, then 10 minSet in minutes · first to the incident commander and deputy, second also to the CIP Senior Manager
Offline copy on the control-room terminalOnOn · Off. Covers the plan, playbooks and drawings, refreshed at each approval
Agents may send commands to OT systemsNeverAlways read-only. A person carries out containment
Connections

The response plan, zone drawings, vendor contracts and reporting rules

Incident response plan and playbooksthe OT cyber incident response plan and each playbook's steps, approved versions only
Zone and network drawingszone drawings, the approved connections list and the connectivity model's customer counts
Vendor support contracts and retainersecurity lines, call-back times, remote-access terms and the forensic retainer
Regulatory reporting rulesCIP-008-6, the water license, the cyber insurance policy's notice clause and CIRCIA
OT sensor alerts and session logsthe alert that starts the incident and the jump-host session log
On-call rotathis week's response team and the plan's escalation order
What it changes

Incident response measured against the CIP-008 hour

Each figure carries its label: a target the solution is built to, an estimate, a typical published result, or a proven one.

target
100%
of reportable incidents notified inside CIP-008's 1-hour clock, with the decision time on record
Notified at minute 21
39 minutes to spare in the sample incident
target
0
customer outages caused by the response, the design goal, with the customers behind each conduit shown before it is pulled
target
< 10s
from a plain question to the cited playbook step, against 22 minutes in the sample utility's last tabletop
Binder and SharePoint22 min
With agents< 10 s

“demo” means seen in the working solution, on its sample data. “target” means the design goal, measured in the live solution. “estimated” means our estimate, except the 22 and 31 minutes. Those are the sample utility's own tabletop figures. “estimated” also marks vendor figures. SANS OT response planning guidance finds about 50 % of organizations without an ICS/OT-dedicated plan. The Dragos 2026 OT Cybersecurity Year in Review gives 82 % and 73 %. The regulation named as context is NERC CIP-008-6, Table R4. CIRCIA is not yet in force. Names on the screens are sample data.

Questions

OT incident response questions on CIP-008, playbooks and containment

What is OT incident response software for utilities?

OT is operational technology, the systems that run the grid and water plants. OT incident response software puts a utility's plan, playbooks, zone drawings, vendor contracts and reporting rules behind one question at the moment of an incident. In OT Incident Response, a responder types what is happening. The right playbook opens at the right step, with each instruction quoted. The reporting clock the rules choose runs beside it. The incident commander decides each branch and signs.

How does an ICS incident response playbook work in it?

The playbook navigator shows your approved playbook as its own decision tree, with the current step lit and quoted word for word from its page. A branch moves only when a person answers it, and each answer writes the timeline. In the sample case the playbook has nine steps, from confirming the source to lessons learned.

How does it handle the CIP-008 one-hour reporting clock?

CIP-008-6 sets three deadlines. The first notice is due one hour after a Reportable Cyber Security Incident is determined. For an attempt to compromise, it is due by the end of the next calendar day. An update is due within 7 calendar days of new information. The clock keeper starts each clock at the event its rule names, using the time the incident commander records. The notice is drafted from the timeline with the three items Part 4.1 asks for.

Does it isolate systems or send commands to SCADA?

No. The agents are read-only toward OT. None of them can send a command to a control system, a firewall or an account. The zone and asset resolver shows the conduit, the rule and the customers behind each RTU. A person carries out the containment and records it.

Can it cover water treatment incidents as well as the grid?

Yes. The facts of each incident choose its clocks. In the sample, failed logins on a water works HMI follow their own playbook. They run on the water license's 24-hour clock from detection. The grid incident runs on CIP-008-6.

Who makes the reportable determination and signs the notice?

The incident commander answers each branch, makes the determination and signs each notice. The settings mark these steps “person only”. Agents do not send a notice, page anyone outside the plan's on-call list or edit a signed timeline entry.

Can we use our own response plan, playbooks and reporting rules?

Yes. The answers come only from your approved documents. Settings cover which rules apply, when each clock starts and the target for the decision. They also cover escalation and reminder times, the offline copy, and who decides and signs. Each change is a new version that your CIP Senior Manager approves.

What does a first tabletop on our own plan take?

The Agentic Solution Engine builds and deploys it from your requirements and documents. Those are your OT incident response plan, playbooks, zone drawings, vendor contracts and reporting rules. It goes live once each quality gate has passed. We will walk you through it first on a tabletop scenario of your own.

Try OT incident response
on a tabletop of your own.

We'll run OT Incident Response on your own response plan, playbooks and drawings, against a tabletop scenario you choose.