- Sees
- The table, the hard spots and each flagged value with its page
- Signs
- Decides each doubtful value with a reason
Oil and gas document extraction on a legacy well file handover of 9,640 pages
An operator has taken over an offshore field and its records arrive as 221 files in boxes and a file share. Nobody indexed them. The analyst needs the pressure limits for every well before the integrity team can plan.
demoField, former operator, wells and counts: all of it is sample data.
- 01The package
214 files opened, 1,386 documents inside, and 2,528 pages hard to read
Engineering data analystThe opener reports what came in and lists the 7 files it could not open, with why. Its map lays the package out by document type, one square for about ten pages, colored by the cause: faded, handwriting, stamp, a table across pages or two languages. People start with those pages, and a discipline lead's spot check tests the other 7,112.
- 02The package
Hard spots light up the faded test pressure under a RECEIVED stamp
Page readerOpening an end of well report and turning on hard spots greys the page and lights what was difficult: a faded number in the production casing row and the receipt stamp across it. The panel beside it lists every value read on the page with how sure the reader is. She sees where the trouble is before she asks for anything.
- 03The package
A 1998 wellhead sheet: 3,000 struck through, 5,000 written in pen
Page readerOn a vendor datasheet from the old operator, the casing head rating is printed one way and changed by hand, with initials. The shell test is raised the same way. A plain read would take the print, or the pen, and the spreadsheet would never show which. The reader marks the page handwriting and keeps both readings.
- 04The table
1,264 rows across 62 wells, and the pen-raised rating is held
Agents, then the analystShe asked in plain words for pressure limits for every well and agreed six proposed columns before anything was read. The table fills, 8,848 values with 412 for a person. Clicking the casing head cell brings up a crop of the pen figure. A pen mark alone does not prove a rating, and no nameplate photo, as-built record or change record is in this package, so the value waits.
- 05The table
Read 3,800 at 62% sure, and the daily report from the same day says 3,500
Page reader, then the analystUnder the stamp sits the production casing test cell. Only a 3, then 00, can be made out, and the second digit could be a 3, a 5 or an 8. A cross-check found the daily drilling report written that day, which says 3,500, and cites it. The analyst opens it, with the casing test line marked as the second document.
- 06The table
She takes 3,500 from the second document, and it waits for the lead
Engineering data analystShe uses 3,500 with the reason confirmed on a second document. The cell now reads 3,500, was 3,800, decided by her, waiting for the discipline lead to check. She cannot check her own decision. The cross-checker offers the same move on 96 other flagged values where a second document says the same number, each to be looked through first.
- 07Sign-off
He checks her decision first, and only then can rows be signed
Discipline leadThe sign-off page holds signing until every decision is agreed or returned. He opens the corrected test pressure with its page crop and agrees; it reads Checked. Now 870 rows are ready, every value in them settled and checked, and 394 stay held. The person who decided a value cannot check it, and a row leaves only when signed.