P&ID digitization on a gas plant: one wrong sheet number, 38 sheets back
A gas plant has 4,216 P&ID sheets: hand-drawn sheets scanned from film, scanned CAD plots and newer PDFs. Overnight the agents read them, joined them at their connectors and walked every line. One 1987 line runs to a drawing number that does not exist.
demoAll of it is sample data: plant, units, sheets, technicians, engineers and counts.
- 0106:12
24,928 lines walked, 1,166 ends that go nowhere, 318 questions
Line walker, for the drawing technicianThe sheet atlas lays all 4,216 sheets out like a map, one tile each, joined at their off-page connectors. 3,358 are paired into the plant, 799 sit apart in 31 pieces and 59 wait for a rescan. People have confirmed 1,872. The agent turned the dead ends into questions, ranked by how many joins one answer repairs.
- 0206:12
A whole NGL product train sits apart, behind one line
Drawing technicianZooming into the NGL recovery unit shows the piece that broke away, parked beside the gap it belongs in: 38 sheets, marked with a question pin. Utility and flare headers touch nearly every sheet, so they do not count as joins. One process line leads into that piece, and its connector points at a sheet nobody has.
- 03Morning
The connector reads TO DWG D-4412, and the index skips that number
Drawing technicianThe question puts both sheets side by side. On the 1987 sheet, the 6-inch line HC-2217 leaves the demethanizer bottoms for D-4412. The drawing index jumps from D-4411 to D-4413. D-4421 has a line coming in from D-4408 that nothing else claims, same size, same service, flow arrows agreeing. The agent asks whether two digits were swapped.
- 04Morning
It shows the sheet it weighed and turned down
Drawing technicianEach line of evidence cites its place on the sheet, and clicking one zooms the scan to it. Below sits D-4441, also weighed: same size, but its line reads HC-2271 and it already pairs elsewhere. Its own score is 94%, labeled the agent's own score on sample drawings, not a measured accuracy. She reads the sheets, not the score.
- 0509:11
Her answer: join to D-4421, digits swapped
Drawing technicianShe agrees and picks the reason, digits swapped. The question moves to waiting for a check, and her own view now says that she answered it, so someone else must check it. The join is not made yet. Nothing on the atlas changes until a second person has opened both sheets.
- 0609:14 to 09:20
Both full sheets opened by the engineer before confirm lights up
Process engineerThe process engineer opens D-4408 and then D-4421 at full size, and each is marked opened by you. His check counts only the sheets he opened himself. He reads the line from the demethanizer to the surge drum, picks both sheets agree, and confirms at 09:20. He could have sent it back or disagreed.
- 0709:23
38 sheets of the NGL train snap back into the plant
Sheet joinerThe piece rejoins the unit. Across the plant, paired sheets rise to 3,396 and the pieces apart fall to 30. The scanned drawing itself is not changed. A note goes to document control that D-4408 points the wrong number at D-4421, so the next revision can correct the sheet.
- 08After
Line HC-2217 now walks from the column to the surge drum
Process engineerWalk the line shows it as a ribbon of sheets: start at D-4408, one join crossed, end at the surge drum on D-4421, with the register name beside it. Each agent step is listed with what it read. The hand-off records who ruled and that the scan was left as it was.
- 09Next
317 questions left, and the next one repairs 36 sheets
Drawing technicianBack on the list, the questions are ranked by joins repaired. Their kinds are counted across the top: a sheet number that does not exist, a sheet missing from the set, a faded connector, two sides that disagree, a line that may stop on purpose. Each has a checker and a clock. The next is Q-0002.