NPT Analysis demo

Lost time read from what crews wrote rather than the codes, and sent to the rig and the contractor before the performance engineer rules. 1:25

What the demo shows

Finds, reclassifies and root-causes lost time across wells, for drilling performance teams.

Agents read every tour sheet and daily report, draw each well's days-versus-depth curve, and ring every flat stretch typed as normal work that the words show as non-productive time. Each proposal goes to the company representative and the rig contractor with the same lines; the superintendent signs or settles, the contractor acknowledges a ruling against it or disputes it under the contract, and a drilling manager samples and signs the release.

Transcript

  1. NPT Analysis finds hidden non-productive time for drilling teams.
  2. One contractor reports 20% of well time lost.
  3. Rigged downtime explains 2-3.
  4. Agents ring every hidden stretch.
  5. Here, 31.5 hours flat, typed as circulating.
  6. The tour sheet, top drive failed, waiting on a part.
  7. Rosa sends both sides the lines.
  8. Vussi opens them and agrees.
  9. Anton, for the contractor, disagrees.
  10. He says 2.5 of those hours were planned.
  11. Colm, the superintendent, opens the lines and the clause and rules 30 hours of repair.
  12. Signed, 18 hours fall to zero rate, a $111,000 credit.
  13. Every open line and answer is audited.
  14. Anton acknowledges, so the credit can leave.
  15. Sign loss time, 14.2%.
  16. Built on Botminds: agents, data, screens, and governance on one platform.

Transcribed from the film’s narration. Captions are on the player.