MAOP Reconfirmation demo

Pipeline records engineers trace each operating pressure to the page behind it, with the case argued both ways where old records disagree. 1:24

What the demo shows

Builds traceable, verifiable, complete pipe records and reconfirmation cases for engineers.

Agents read each job file, tie pages to segments and judge seven records for every pressure across 1,040 miles and 2,816 segments. Where records disagree they show both pages and the sum, argue the case both ways and lay out the six methods. One engineer chooses, a second opens the cited pages and countersigns, and a named counsel signs the reading before any proven mile counts. Agents never choose a method or say a segment is safe.

Transcript

  1. MAOP Reconfirmation proves old gas pipes pressure, page by page, for engineers.
  2. Half the cover miles are due by July 3rd, 2028.
  3. Segment 7 to 114 runs at 870, until the tree breaks at grade.
  4. Mill test says X52.
  5. A purchase order says X46.
  6. The lower sum is 775.
  7. The agent argues both ways and lays out six methods.
  8. Lakshmi picks a test.
  9. Cormac opens each cited page before he can sign, then countersigns and four field checks join the list.
  10. Gustavo opens both pages and holds the line at 775 until the grade is settled.
  11. Two people on every case, every step audited.
  12. 87.2 miles are reconfirmed.
  13. Counsel signs, and the miles do fall from 520 to 365.
  14. Built on Botminds: agents, data, screens, and governance on one platform.

Transcribed from the film’s narration. Captions are on the player.