MAOP reconfirmation on a grandfathered segment, from a broken tree to a hold
Segment 7-114 is 4.6 miles of 20-inch pipe laid in 1962, in a high consequence area, running at 870 psig on a record card. The job file was read again this morning, and at 9:11 two of its records stopped agreeing.
demoSample data on every screen: the line, the segment, the job file, the people and each pressure.
- 019:12
870 psig at the top, and the tree breaks at grade
Pipeline records engineerThe segment's pressure sits at the root, with design, test and fittings under it, then seven records each marked traceable, verifiable and complete, then the pages. Grade reads X52 or X46 and turns red. The lower reading is 775 psig. A hold request has already gone to the operations manager, because the lower sum falls under the pressure on record.
- 029:12
A make-up order bought 16,370 feet of X46 for this stretch
Pipeline records engineerThe mill test lists Grade X52 for one order. A purchase order from the same summer buys X46 from a second mill for stations that land on MP 41.9 to 45.0: 3.1 miles, 409 joints. The tally there has no heat numbers, and no mill test for that order is in the file. The sum underneath works both grades, rounded down.
- 039:13
The agent cannot prove 870 psig, and says nobody can show which pipe is there
Pipeline records engineerThe case for 870 cites the signed mill test, a design pressure of 876 and a water test of 1,090 psig divided by 1.25. The case against cites the order, the missing heat numbers and an alignment sheet copied years later. At X46, 870 would be 67.3% of yield in a location built for 60%. It does not say the pipe is X46.
- 049:13
Pressure reduction falls 87 psi short of what firm deliveries need
Pipeline records engineerSix methods, each worked with this segment's own facts and a sample cost. A test needs 1,088 psig for 8 hours, valve to valve over 8.7 miles. Reduction would cap it at 673 psig against the 760 firm deliveries need. The impact radius of 407 ft rules out the small-radius route. The planner lays them out and chooses none.
- 059:14
She chooses the pressure test, and says the record is still open
Pipeline records engineerChoosing stays locked until she has opened the mill test, the purchase order and the tally. Her reason says the test settles the pressure and field checks must still settle the record. The test tag itself reads 870 only if field checks show X52, open if X46. The senior integrity engineer countersigns before anything is planned.
- 069:15
Three cited pages, opened by him, before Countersign means anything
Senior integrity engineerHer openings count for her alone. He opens the mill test, the order and the tally himself, and the panel ticks each one: 3 of 3 cited pages opened by you. Send back stays beside Countersign, and a hold request sits below for the operations manager, which he can also raise himself.
- 079:15
Method chosen, and the case stays open until four field checks are signed
Senior integrity engineerThe case now names who decided and who countersigned. The test runs valve to valve, so six neighbors are covered too and the section is costed once. Still open: the grade is unproven until the field checks come back. The tree still shows the lower reading, because nothing has proved which pipe is in the ground.
- 089:16
Four bell holes inside the 3.1 miles, because the valve sites sit outside it
Senior integrity engineerCut-outs at the test manifolds would sample the wrong pipe. So the field list gains four bell holes, one a mile rounded up, at MP 42.1, 42.9, 43.8 and 44.6, each for hardness and chemistry. At each spot the readings follow the rule's pattern: 5 places in 2 quadrants, 10 readings each.
- 099:17
Held at 775 psig, with 15 psi to spare for firm deliveries
Pipeline operations managerHe opens the purchase order and the mill test, then holds the segment at 775. A hold is the safer way, so one person with the authority sets it, and the control center gets the notice. Agents never touch pressure. Raising it back to 870 waits for signed field results and a finished test.
- 10After the hold
87.2 of 520.0 miles reconfirmed, and 310.5 more wait on counsel
Pipeline operations managerOnly a finished, countersigned method reconfirms a mile. Records prove 310.5 more miles on the operator's own reading, which is an argument rather than the rule's words, so they stay in the count until regulatory counsel signs it. The method plan now holds 111.0 miles, and 127.6 miles of broken trees still have no method.