Manufacturing Record Book demo

QA/QC engineers follow each weld in a supplier’s record book from plate heat number to hydrotest, with its dates read together before release. 1:19

What the demo shows

Checks a vendor’s final data book against the ITP and order, for QA/QC and project engineers.

Agents split each record book by section, match the inspection and test plan, trace heat numbers, check each welder's qualification on the date of each weld, and walk every weld across eight records. They cite every page and draft supplier queries. The QA/QC engineer rules and proposes; the lead inspector opens the evidence and signs.

Transcript

  1. Manufacturing Record Book checks supplier record books against the inspection plan for QA slash QC engineers.
  2. This separator's book, 3,870 pages, 58 welds.
  3. Agents walk each weld across eight records.
  4. One is broken. Weld C3, welder WD, 117, April 14, 2026.
  5. He last used that process September 30th.
  6. His window closed March 30th.
  7. Read together. The pages disagree.
  8. Agnes agrees the finding and sends a query.
  9. Paolo holds the release and writes why.
  10. The shipment waits until the record arrives.
  11. Until Keldry answers with a record.
  12. Weld C3 stays open and the separator does not ship.
  13. Every finding, query, and hold is on an audit trail.
  14. Built on Botminds: agents, data, screens, and governance on one platform.