The gas plant's bypass log stopped mid-quarter when notes moved to a new form. A report would have printed zero. Until the analyst opens the late entries, the page says not known.
A calm major accident hazard page, and the coker sentence a site disputed
The draft went to the sites five days ago, and their answers are due in two. A refinery coker and a gas plant with a quiet bypass log fill the day.
demoSample data throughout: the company, its plants, the people on screen and each figure.
- 01First look
The draft looks calm: no event ruled top tier, and 98.2% of tasks done
Process safety analystThe page opens on a question, how do we know we are safe, and answers that the records cannot prove it. Below sit 22 sentences, each with its owner and state in the margin. No event is ruled top tier so far, and 3 still wait for a ruling.
- 02The read
A gas plant's bypass log went quiet, and the page says not known
Process safety analystSeven sources at four places, 61,201 records, read only. One cell is red. The gas plant's bypass log ran at about 14 entries a week, then stopped when the plant moved its notes to a new shift log form. A count from that feed would print 0, so the gap finder marks it not known.
- 03The join
Unit 31 is the only unit over all three warning lines
Process safety analystLate safety-critical tasks, bypasses over 30 days and temporary changes past their end date are joined by unit. Unit 31 holds 14, 3 and 2, and only 92.5% of its tasks were done. The joiner's note says it is not calling the unit unsafe, because the records cannot say that.
- 04Unit 31
Of 14 late tasks, 9 have no deferral and 3 of those no planned date
Process safety analystAbove the rows sits the definition: a task still open at quarter close counts, deferred or not, because a deferral changes the plan and not the due date. Filtered, 9 of the 14 have no approved deferral. The drum switch valve interlock test and the cutting deck H2S detector are among those with no planned date.
- 05Behind one sentence
The blowdown drum ran high while its own trip had been bypassed 32 days
Process safety analystOne sentence names a limit excursion. Its record says the blowdown drum level went over its high limit during a drum switch. Beside it sits the same instrument: the drum's high-high level trip, LSHH-3124, was bypassed when it happened, and its own proof test is late.
- 06The dispute
The site manager calls the unit safe, and four phrases are flagged
Site managerThe site manager's wording says the unit is safe to operate, that the five deferred tasks are not overdue, and that the rest are planned and in hand. The claim checker lists what to test: safe, in hand, not overdue, and counts that differ from the records. It passes nothing, and marks the words not compared.
- 07The decision
A third wording: 14 past due, 5 deferred to the turnaround, 9 with none
VP of HSEDeciding is refused until the VP of HSE has opened each list behind the sentence, and the screen counts 3 of 3. A third wording keeps the full count of 14 and shows the 5 deferrals beside the 9 without one. With the print box left ticked, the committee reads the site manager's view under it.
- 08Fresh check
Changed words get a fresh check: each list and one record from each
Process safety analystChanged words make earlier checks lapse. The analyst, who did not write them, opens the tasks, the bypasses and the temporary changes, and one record from each: here a temporary clamp on the coke drum overhead line, past its end date with no extension signed. Only then can the analyst say the records match.
- 09The late log
The new log shows 2 long bypasses, at about half its normal rate
Site manager and analystFrom the gas plant comes the new shift log, 41 entries. The gap finder holds it, since it runs at about 7 entries a week against a normal 14. Only after opening all 41 does the analyst lift not known. Unit 530 moves to three warning signs, and the page says entries may still be missing.
- 10End of the day
The page now prints both wordings, and 11 sentences still wait
VP of HSEThe decided sentence carries the full count with its deferrals, and under it the site manager's view, marked as not compared with the records. In the margin: who wrote it and who read it against the records. Two company sentences changed with the late log, so their owner agrees again. Still a draft: 11 of 22 wait.