The limits table caps lean amine at 380 gpm while the unit runs at 420 gpm. Due the same day.
Fifteen minutes on the amine unit: new boxes, a limit and a relief study
The amine treating unit's construction boxes have just been scanned. Here is the read and what followed, at the times the audit trail recorded.
demoSample data throughout: the refinery, the people acting and the figures.
- 01Before the read
97 of 133 owed books stand, and unit 41's ten are greyed out
Process safety information coordinatorFourteen units, ten books each: chemical hazards, process technology and the eight kinds of equipment information. Dark books stand, tilted ones lean, striped ones are gaps, and older units carry a stub where balances are not owed. Unit 41's boxes are newly scanned, so its books read not checked and count for nothing.
- 0208:15
9,318 scanned sheets join the read, beside five other sources
Process safety information coordinatorThe coordinator starts the read. Six bars fill, from the scanned construction boxes to the hazard study tool, 14,012 documents in all. The plan ticks down the side: gather read only, read each page, test ten books against the rule. A page read below 85% sure goes back to the coordinator to check against the image.
- 0308:18
Unit 41's process safety information, tested: two gaps and two leaning books
Process safety information coordinatorThree minutes later the books have moved. Process technology and relief design basis are gaps; drawings and balances lean. A line under the shelf says why the unit cannot be issued: it runs outside a documented limit, 20 files could not be opened, and each open book is listed with its findings and proposed owners.
- 0408:21
Lean amine runs at 420 gpm against a 380 gpm limit, so it is due today
Process safety information coordinatorLean amine is capped at 380 gpm in the operating limits table, and the unit has run at 420 gpm every day for ten years, since a change raised circulation. This is filed as running outside a documented limit. The process safety manager and the operations lead are paged, it is due today, and the unit's issue waits until they settle it.
- 0508:24
Relief valve design basis on PSV-41-1012: fire found, three cases not found
Process safety information coordinatorA relief engineer would expect four cases for a flash drum like this. The record holds one: external fire, from a vendor fax that leaves the others to the owner's engineer. Blocked outlet, the inlet control valve failing open and gas blow-by from the absorber are in no source the agents read. The coordinator raises the gap.
- 06Waiting for countersign
Two sources marked not opened, and the countersign waits on both
Process safety managerThe coordinator's note is on the item: only the fire case is on file, and two later changes answered no. The manager sees the sizing fax and the change record listed as not opened, 0 of 2. A source counts once its cited passage has been on the manager's own screen, and whoever raised a finding cannot countersign it.
- 07Before signing
A one-page vendor fax, external fire only, other cases left to the owner
Process safety managerThis page is the whole design basis on file: a vendor's sizing fax. Set pressure 100 psig, wetted area 350 sq ft, relief rate 2,950 lb/hr of water vapor, a G orifice of 0.503 sq in. Marked are the case, the cited figures and the note at the foot. No line covers what a higher flow could bring.
- 0808:27
The change that raised the flow left the limits and flow diagram blank
Process safety managerThe change raised lean amine circulation from 340 to 420 gpm, running the pump at its rated point with new trim on the level valve into this drum. Its review questions answer relief systems affected with no, and leave operating limits and the flow diagram blank. With both passages opened, the manager countersigns.
- 0908:30
The relief engineer takes the study a week before the scope cut-off
Relief systems engineerOnly a relief engineer can own this study; the screen will not hand it to a desk. The dialog states the turnaround's scope cut-off and asks for a study date before it, so a fix can still make the turnaround. The engineer sets the study a week ahead of the cut-off, plus a nearer first look at what the gap means today.
- 10The same morning
211 relief studies on one desk, 77 ranked high and listed first
Relief systems engineerThe engineer's view covers the whole site. Each study here was ruled by the coordinator and countersigned by the manager first. High rank goes to a valve with no basis, a higher-pressure source upstream or a later change. A table by unit gives counts, high ones, those with no basis and the next due date.