Investigator-initiated study management that shows each funded study's drift before a milestone is missed

See one case, screen by screen ↓
Watch with transcript →

Built forESR managersGlobal ESR leadsMedical directorsFinance payment approversClinical supply coordinators

The Problem Today

ESR managers retype each progress report, shipment and invoice by hand, so a slipping study is found only once a milestone is missed.

25%
of non-industry phase 2–3 trials missed enrollment (2011) published

Retyped by hand each quarter

  • Reports
  • Ship dates
  • Lots
  • Invoices
  • Paid before it is earnedMilestone invoices arrive before the milestone is reached
  • Lots expire at the siteExpiry is not checked against the study's last visit

The Solution

  1. Each quarterly report readScreened, enrolled and treated taken from the page and set against the plan
  2. The delay forecastLast patient in forecast with a range, and a recovery plan drafted
  3. Shipments and invoices tiedLot and expiry read from the reply; each invoice tied to its milestone
  4. A named person confirmsThe ESR manager confirms; finance and the study's leads co-sign

Built-in controls

  • Each figure cites its source page
  • The person who prepares an item cannot approve it
  • Investigators see only their own studies

What You Get

Each funded study shows its drift at the first late report, while there is still time to recover it.

  • Paid only when earnedDuplicates and over-cap invoices held before payment
  • Transparency kept currentPayments and shipments classified as they are approved
  • Expiring lots caughtA lot expiring before the last visit is flagged before it ships
In short

What is Investigator-Initiated Study Management?

Investigator-initiated study management is the work a sponsor's medical affairs team does after an investigator's study is approved and its contract signed: tracking milestones against the baseline, reading quarterly progress reports, supplying product, paying invoices against the payment schedule, classifying each transfer of value and closing the study. Many teams call it externally sponsored research (ESR) or investigator-sponsored research. Investigator-Initiated Study Management starts at contract signature, when a study approved in Investigator-Initiated Study Review arrives with its baseline, and runs it to its final report: seven agents read each report, shipping reply, invoice and amendment, and a named person confirms and signs.

How to choose AI solutions for life sciences →

Updated

The problem

Retyped reports hide a funded study's drift until a milestone slips

Investigator-initiated study management begins the day the research agreement is signed, and it runs for years: a quarterly progress report from each investigator, invoices against the payment schedule, product shipments, amendments, deliverables and publications, and each payment and shipment classified for transparency reporting. Today that runs on spreadsheets, a grants database and email. The ESR manager retypes screened, enrolled, treated and completed from each report, copies ship dates, lots and expiry dates from fulfillment emails, and checks each invoice line by line against a contract PDF.

So drift is found when a milestone is already missed, and by then the final study report, the manuscripts and the registry results are late too. Milestone invoices arrive before the milestone, duplicates get paid, product requests go by email to three different teams, a lot that expires before the study's last visit is found at the site, and transfers of value are classified at year end from finance extracts. Each therapy area needs its own mandatory fields and steps, so teams work around one form in spreadsheets.

typical19%of 2,579 phase 2–3 trials closed in 2011 ended for poor accrual or under 85% of planned enrollment
Where an ESR manager's minutes go, per study per quarterestimated
By hand165 minutes
With the solution23 minutes
  • Reading the progress report and keying screened, enrolled, treated and completed40 → 5 min
  • Comparing enrollment with the plan and working out how late the study is30 → 5 min
  • Copying ship date, quantity, lot and expiry from fulfillment emails20 → 3 min
  • Checking the invoice against the payment schedule and what is already paid35 → 5 min
  • Classifying the payment and the product for transparency reporting15 → 2 min
  • Chasing missing reports and receipt acknowledgments25 → 3 min

Our estimate for one study in one quarter, by hand and with the agents, where the ESR manager confirms and approves instead of typing. Not measured in the working solution.

How it works

Quarterly report to paid invoice in investigator-initiated study management

What comes in
What arrivesAs it arrives · reports, shipping replies, invoices, amendments, final reports
Agents at work
Quarterly report readerfigures + forecast
Then
Supply tracer3 fulfillment paths
Invoice matcherearned + transparency
Then
Amendment readerre-baseline
Deliverables trackerfinal report check
Then
Close-out assemblerearly close case
A person decides
ESR managerconfirms; finance and leads co-sign
What comes out
Drift on one timeline
Paid when earned
Lot traced to receipt
One case, step by step

A third quarter of investigator-initiated study management, report to payment

One investigator-initiated study tests weekly home self-injection of a study drug in 24 adults with IgA nephropathy over 52 weeks, at one medical center. It was approved in study review, and from contract signature it runs here, against its baseline. Its third-quarter progress report has just arrived. Here is what happens next, screen by screen, in the working solution.

A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.

  1. 01The morning the report arrives

    38 studies on the portfolio river, one row each

    ESR manager

    The ESR manager opens the portfolio: 38 active investigator-initiated studies, one thin row each. Hollow marks are the baselined milestones, solid marks the actual or forecast ones, and the gap between them is the drift in weeks. Two studies sit in At risk and ten in Drifting, each band with one line from the agents on why. Needs you lists 4 reports to confirm, 3 shipments, 6 invoices, one amendment, one close-out, and a new study just arrived from review at contract signature with its baseline.

    “Third quarter: 34 of your 38 reports are in and read. The study’s report has just arrived: 9 enrolled against 16 planned.”

  2. 02Minutes later

    The quarterly progress report read, each figure cited to page 2

    Quarterly report reader

    The study's 3-page progress report arrives through the investigator portal, uploaded by the study coordinator. The quarterly report reader reads the enrollment table (screened 14, enrolled 9, treated 9, completed 2), each figure cited to page 2, open on the left. Against the plan of 16 enrolled by quarter end, the study is 7 behind. At 1.17 patients a month over two quarters, last patient in is forecast 30 weeks late, with a range around it, and the study moves from Drifting to At risk: seven steps in 6.4 seconds.

    “Drifting → At risk · rule: more than 12 weeks late on last patient in.”

  3. 03Two minutes later

    40 vials filled from the packing list, and a lot that expires too soon

    Supply tracer

    The relabeling vendor confirms dispatch of 40 vials of the study drug, sent through the vendor because the site's pharmacy cannot apply study labels. The supply tracer reads the dispatch email and packing list and fills ship date, quantity, lot, expiry, courier tracking, temperature logger and labels, each cited, nothing typed. It records the transfer of value, 40 vials × $4,850 = $194,000 of in-kind research support, and flags the lot.

    “The lot expires 7 weeks before the study’s forecast last patient last visit.”

  4. 04Five minutes later

    A later lot asked for, and the vendor's reply read

    ESR manager

    The ESR manager clicks Ask for a later lot. The supply tracer drafts and sends the request to the vendor, reads the reply and refills the record with a new lot whose expiry falls after the study's forecast last visit. The flag clears, and the ESR manager confirms the shipment record. Nothing was typed by hand.

    “The new lot outlasts the study. Flag cleared.”

  5. 05Back on the report

    Recovery plan approved in one step; milestone 3 held

    ESR manager

    The ESR manager confirms the quarter's figures and approves the drafted recovery plan with one electronic signature. Five actions, each with an owner and a date: a second site with its own investigator; referral letters to 6 community nephrology clinics; protocol amendment 2 to widen kidney function to eGFR ≥ 30, sent to the IRB; a monthly call; and milestone 3, $96,000, held until the second site is open. The drafted message to the investigator waits for the ESR manager to edit and send through the portal.

    “Figures confirmed and recovery plan approved by the ESR manager · meaning: Approved · milestone 3 held.”

  6. 06Before the afternoon payment run

    The quarter's invoice is paid because the report earned it

    Invoice matcher · finance

    The site's invoice asks $26,800, the per-patient fee for the 4 patients enrolled in the quarter. The invoice matcher ties it to the contract's $6,700 per enrolled patient and to the report the ESR manager confirmed, checks the $33,500 already paid against the $160,800 cap, and classifies it as a research payment for Open Payments, in the current program year, with the site's investigator named as principal investigator. The ESR manager reviews it; the finance payments approver approves it as the second person, and it goes to accounts payable by API in the afternoon run.

    The invoice matcher's guardrail: “Never approves a payment.” Unearned milestones are held, and a person rejects a duplicate.

  7. 07An amendment arrives

    Another study's follow-up doubles; the re-baseline is proposed

    Amendment reader

    Another study's protocol amendment 3 extends follow-up from 12 to 24 months. The amendment reader compares it with the baseline and proposes the re-baseline: last patient last visit and the final study report each move a year later, and a secondary manuscript is added. The budget rises $84,000 to $674,000. That is 14.2%, above the 10% rule, so a contract amendment is raised, and product rises by 288 bottles, flagged to the clinical supply coordinator.

    The amendment reader drafts a re-baseline and does not apply it: the ESR manager proposes it, and the global ESR lead approves.

  8. 08The same day

    A pediatric study closes early, with two signatures

    Close-out assembler · medical director

    A pediatric study enrolled 3 of 20 children in 22 months and missed two recovery plans, and its investigator agrees to close early. The close-out assembler builds the case: enrollment against plan, the two recovery attempts, the spend ($186,400 paid of $512,000, a final payment of $18,200, $307,400 released) and the product: 60 bottles shipped, 22 dispensed, 12 needed to finish, 26 to destroy at the site with a certificate. The ESR manager prepared it and cannot sign; the medical director has signed, and the global ESR lead signs next.

    “Recommended: early close. No new patients; the 3 enrolled children finish their 52 weeks.”

  9. 09A final report received

    A final study report read against the protocol: 11 of 12 sections

    Deliverables tracker

    The deliverables tracker lists 17 deliverables due in the next 120 days (interim reports, abstracts, posters, manuscripts, final study reports and registry results) and 2 overdue. It reads one completed study's 84-page final study report against the protocol's report content and finds 11 of 12 sections: the month-24 eGFR slope table is missing. That study's ClinicalTrials.gov results fall due under 42 CFR 11.44, and as an ESR collaboration its co-authorship obligations are tracked too.

    The tracker does not accept a deliverable itself: the choice is “Ask for the missing table” or “Accept with a note”.

  10. 10Inspection

    Each action on the record, exported as one inspection pack

    QA auditor

    Each step by people and agents is on the audit trail: who, what, when, on which study, the meaning of each signature and the evidence behind it. The QA auditor exports an inspection pack for the study from its start to today: the audit trail in CSV and PDF, the electronic signature manifest with meanings, the source documents the agents cited, agent and model versions per run, the configuration versions in force, and roles and access during the period.

    “For FDA and EMA inspections, internal audit and partner audits. The pack is hashed (SHA-256).”

Who it’s for

ESR managers, finance, clinical supply and investigators on one funded study

One funded study from contract to final report, for five roles, then and now.

ESR manager
Runs the active studies
Before
Runs dozens of active studies and spends Mondays retyping lot numbers from emails. At each quarter end, chases reports, copies ship dates and checks invoices line by line.
Now
Confirms figures the agents read and cited, approves a drafted recovery plan in one step, and sees each study's drift on the portfolio river.
Global ESR lead
Owns the portfolio and its budget
Before
Hears that a study is late once a milestone is already missed, and has no quick way to see which studies will miss their final report, or why.
Now
Asks the portfolio in plain words and gets the studies with their reasons cited; approves re-baselines and co-signs early closes as the second person.
Finance payments approver
Approves research payments
Before
Approves research payments with nothing tying each one to the evidence that earns it, and wants to approve only what traces to a milestone.
Now
Sees each invoice line tied to the payment schedule, its evidence, what is paid and the cap; approves as the second person, and the payment file goes to accounts payable.
Clinical supply coordinator
Approves each shipment
Before
Approves shipments whose requests go by email to three teams, and learns from the site that a lot expires before the last visit, when it is too late to swap it.
Now
Approves each request as the second person, routed to the right fulfillment path, with lot and expiry read from the vendor's reply and checked against the study's forecast last visit.
Principal investigator
Runs the study at the site
Before
Submits quarterly reports, invoices and product requests, acknowledges each shipment, and wants to be told once what is needed, and when.
Now
Sees in the investigator portal the next report due, the actions agreed with the ESR manager, the shipment to acknowledge and the status of each invoice, and nothing internal.
The agents

Report, supply, invoice and amendment agents in study management

Reports, shipping replies, invoices and amendments are read as they arrive, and each study is forecast and its recovery drafted; the ESR manager confirms, and finance, supply and the study's leads sign as second persons.

Quarterly report reader

Reads each investigator's quarterly progress report from the portal, extracts screened, enrolled, treated, completed and discontinued with the page cited, compares them with the baselined plan, forecasts last patient in with an 80% range, sets the band and drafts the recovery conversation and plan.

  • Each figure cites its page
  • Confidence below 0.95 goes to a person
  • Never changes a baseline or sends a message
Supply tracer

Checks each product request against the approved total and what has shipped, routes it to R&D clinical supply, the commercial order desk or the relabeling vendor by supply type, fills ship date, quantity, lot, expiry, tracking and logger from the fulfillment reply, flags a lot that expires before the forecast last visit, and chases the receipt.

  • Never approves a shipment
  • Never ships more than approved
  • Each field cites its source
Invoice matcher

Ties each invoice line to the research agreement's payment schedule and to the evidence that earns it, checks what is already paid, the cap and duplicates, and classifies the transfer of value for Open Payments and EFPIA.

  • Never approves a payment
  • Unearned milestones are held
  • Duplicates are rejected by a person
Amendment reader

Compares a protocol or contract amendment with the study's baseline and proposes the re-baseline of milestones, budget, product and deliverables, flagging when a contract amendment is needed.

  • Proposes; a second person approves
  • Cites the amendment section for each change
Close-out assembler

When a study cannot recover, builds the early close or termination case: enrollment history, recovery attempts, spend to date, product to reconcile or destroy, final payment, registry update and notices.

  • Two signatures close a study
  • The preparer cannot sign
Deliverables tracker

Tracks interim reports, abstracts, posters, final study reports, manuscripts and registry results against their due dates, reads each final study report for completeness against the protocol, and tracks collaboration obligations.

  • Never accepts a deliverable
  • Cites the protocol for each missing item
Portfolio import mapper

At go-live, maps a legacy portfolio file's columns to fields, validates each row against its business unit's mandatory fields and checks for duplicates, and prepares a dry run for a person.

  • Mappings below 0.9 are confirmed by a person
  • Imports need approval
ESR manager

Confirms; second persons sign.

Ask in plain words

The ESR portfolio answers on final reports, product left and invoices

Ask which studies will miss their final report, how much product is left to ship, which invoices are waiting on evidence or which reports are missing. Each answer names the studies and points to the source behind it. These answers use the sample data.

Which studies will miss their final study report date?

Three of your studies. The IgA nephropathy study is forecast 30 weeks past its final study report date. The pediatric study has 3 of 20 enrolled, and an early close is proposed. A third study has two quarterly reports missing, last forecast +16 weeks. Across the whole portfolio, 34 studies are At risk, 21 of them for enrollment.

How much product is left to ship for this study?

The study has 1,560 vials approved, 320 received in 8 shipments, 40 packed to ship tomorrow, and 1,200 left. The packed shipment now carries the later lot, which outlasts the study's forecast last visit.

Which invoices are waiting on evidence?

Two of your six. One study's milestone 4 invoice, $54,000: its third-quarter report shows 22 of 24 enrolled, so last patient in is not yet earned. A completed study's milestone 6 invoice, $72,000: its final study report has 11 of 12 sections. The site invoice for the IgA nephropathy study is now earned, since its report is confirmed.

Which third-quarter reports are still missing?

Four of your 38, due in two days. One of them also missed the second quarter and was escalated to the medical director. Reminders went out through the portal five days ago; the next goes on the due date.

The screens

The portfolio river, the supply record, the early close and the portal

From the working solution, on its sample data. Pick one to see it large.

The portfolio riverEach active investigator-initiated study as one row: baselined milestones hollow, actual and forecast milestones solid, the drift in weeks, three bands with the agents' reason, and the work that needs the ESR manager today.
Quarterly progress report, readThe study's third-quarter progress report beside the reader's seven steps: screened 14, enrolled 9 of 24, treated 9, completed 2, each cited to page 2, and last patient in forecast 30 weeks late.
IIS product supplyA shipment filled from the vendor's packing list (ship date, quantity, lot, expiry, tracking, logger and labels, each cited), with the lot flagged against the study's forecast last visit and the transfer of value recorded.
A later lotThe supply tracer asks the vendor for a later lot, reads the reply and refills the lot and its expiry, which now falls after the forecast last visit; the flag clears.
Recovery plan approvedFive actions with owners and dates, approved with one signature; milestone 3, $96,000, held until the second site opens, and the message to the investigator drafted to edit and send.
IIS payments, matchedEach invoice line tied to the payment schedule and the evidence that earns it, paid to date against the cap, classified for Open Payments, reviewed by the ESR manager and approved by finance.
Amendment and re-baselineA protocol amendment against the baseline: milestones, budget (+$84,000, 14.2%) and product (+288 bottles), old and new, proposed for approval.
Early closeThe pediatric study's early close case (enrollment, recovery attempts, spend, product to reconcile and destroy, final payment), with the medical director's signature in and the global ESR lead's next.
Deliverables and the final study reportInterim reports, abstracts, posters, manuscripts, final study reports and registry results due in the next 120 days, and one final study report checked section by section against the protocol.
Ask the portfolioWhich studies will miss their final study report date, answered with three studies, the reason for each and its source, and the count across the portfolio.
The investigator portalWhat the investigator and study coordinator see: a shipment to acknowledge, the next quarterly progress report due, the agreed actions and the status of each invoice, and nothing internal.
Fields and steps per business unitRequired, optional and hidden fields and steps for each therapy area, set by the administrator and approved by a second administrator as a new version.
Audit trail and inspection packEach action by people and agents with the meaning of each signature, exported as a hashed inspection pack for one study or the whole portfolio.
Governance

Cited figures and second signers in investigator-initiated study management

Each figure links to its passageEach enrollment figure, ship date, lot, invoice match and re-baseline links to the passage it came from: the report page, the email line, the packing list, the invoice line or the amendment section.
People confirm, approve and signAgents read, match, forecast and draft. They do not change a baseline, approve or release a payment, ship product, send a message to an investigator or close a study.
The preparer does not approveThe ESR manager who reviews an invoice cannot approve it; finance does. The supply coordinator approves shipments, the global ESR lead approves re-baselines, and an early close needs the medical director and the global ESR lead.
Investigators see their own studyThe investigator portal shows each site its own studies, reports, shipments and payments, and leaves out bands, forecasts, agent confidence and internal notes.
Paid when earned, classified when approvedEach payment is tied to the milestone evidence that earns it and checked against what is paid and the cap. Each payment and product shipment carries its transfer-of-value classification when it is approved, instead of at year end.
Signatures and changes on the recordEach signature carries its name, date, time and meaning. Agent steps, approvals and configuration changes are on the audit trail, exported as a hashed inspection pack, with agent and model versions recorded for each run.
Configuration

ESR program settings: drift bands, report clocks, lot expiry and budget

The rules the agents apply, and the fields and steps each business unit requires, are settings. Each change is versioned in the audit trail, and a new field configuration is approved by a second administrator.

SettingDefaultChoose from
Drift bandsOn track within 4 weeks · Drifting 5–12 · At risk over 12 weeks, or a forecast past a deliverable date4 / 12 weeks · 6 / 16 weeks
Quarterly report due30 days after quarter end15 days · 30 days · 45 days
Report remindersDay 0 and 7, escalate to the medical director on day 14Day 0 and 7, escalate day 14 · Day 0, escalate day 7
Bulk confirm threshold0.95 — reports matching plan within 10% may be confirmed together0.90 · 0.95 · 0.98
Lot expiryOn — a shipped lot must outlast the study's forecast last patient last visitOn · Off
Receipt chase5 days3 days · 5 days · 7 days
Contract amendmentWhen an amendment moves the budget by more than 10%5% · 10% · 15%
Product value for transparencyWholesale acquisition costWholesale acquisition cost · Standard cost
Connections

Study review, investigator portal, supply, contracts, ERP and transparency

Study review hand-overthe approved study with its budget, payment schedule, milestones, enrollment plan and product quantity, at contract signature
Investigator portalquarterly progress reports, invoices, product requests and receipt acknowledgments
Clinical supply, order desk and relabeling vendororders out; dispatch emails, packing lists, lots and expiry dates back, by API, SFTP CSV and email
ERP accounts payableapproved payments, by API or SFTP CSV
Contract management systemexecuted research agreements and amendments
Transparency reporting systemthe month's transfers of value, by SFTP CSV
What it changes

Earlier drift warnings and earned payments from study management

Each figure carries its label: a target the solution is built to, an estimate, a typical published result, or a proven one.

target
2quarters
earlier warning that a study will miss its milestones
Todayat the missed milestone
With agentsat the first late report
target
0
shipment fields typed by hand is the design goal; date, lot and expiry are read from the reply
target
100%
of payments and shipments classified for Open Payments and EFPIA when approved
Classified at approval
not at year end

“demo” = seen in the working solution, on its sample studies · “target” = the design goal, measured in the live solution · “estimated” = our estimate, not measured · “typical” and “published” = published figures (Carlisle et al., 2,579 phase 2–3 trials closed in 2011). Context on research payments and results: 42 CFR 403.904 (CMS Open Payments), EFPIA Disclosure Code, 42 CFR 11.44, Regulation (EU) 536/2014 Art. 37, ICH E6(R3). Names on the screens are sample data.

Questions

ESR and finance teams on investigator-initiated study management

What is investigator-initiated study management?

Investigator-initiated study management is the work a sponsor's medical affairs team does after an investigator's study is approved and its contract signed: tracking milestones against the baseline, reading quarterly progress reports, supplying product, paying invoices against the payment schedule, classifying each transfer of value and closing the study. Many teams call it externally sponsored research (ESR) or investigator-sponsored research. Investigator-Initiated Study Management starts at contract signature, when a study approved in Investigator-Initiated Study Review arrives with its baseline, and runs it to its final report: seven agents read each report, shipping reply, invoice and amendment, and a named person confirms and signs.

How do you track IIS milestones against the baseline?

Each active study is one row on the portfolio river. Hollow marks are the baselined milestones (contract signed, first patient in, interim, last patient in, last patient last visit, final study report, manuscript) and solid marks the actual or forecast ones; the gap is the drift in weeks. Studies sit in three bands, On track within 4 weeks, Drifting 5–12 and At risk over 12 weeks or with a forecast past a deliverable date, each with a cited reason.

Can it read investigators' quarterly progress reports?

Yes. When a quarterly progress report arrives through the investigator portal, the quarterly report reader extracts screened, enrolled, treated, completed and discontinued and the screen-failure reasons, each cited to its page. It compares enrollment with the baselined plan, forecasts last patient in with an 80% range and drafts a recovery plan for a study At risk. The ESR manager confirms the figures; missing reports get reminders on day 0 and day 7 and escalate to the medical director on day 14.

How does it track IIS drug supply to the site?

The supply tracer checks each product request against the approved total and what has shipped, and routes it to R&D clinical supply, the commercial order desk or the relabeling vendor by supply type. It reads the dispatch email and packing list, fills ship date, quantity, lot, expiry, tracking and temperature logger, each cited, and flags a lot that expires before the study's forecast last patient last visit. The supply coordinator approves each shipment as the second person, and the investigator acknowledges receipt in the portal.

How are IIS payments matched and transfers of value classified?

The invoice matcher ties each invoice line to the research agreement's payment schedule and to the evidence that earns it (a confirmed quarterly report, an accepted deliverable, a signed amendment) and checks what is already paid, the cap and duplicates. It classifies each payment and product shipment as a transfer of value: Open Payments category, form, recipient, principal investigator and program year, or EFPIA R&D for EU sites. The ESR manager reviews, finance approves as the second person, and approved payments go to accounts payable by API or SFTP CSV.

What happens when a study needs a re-baseline or closes early?

The amendment reader compares a protocol or contract amendment with the baseline and proposes new milestones, budget, product and deliverable dates, each cited to the amendment; a budget move above 10% raises a contract amendment. The ESR manager proposes and the global ESR lead approves. When a study cannot recover, the close-out assembler builds the early close or termination case, and it closes with two signatures, the medical director's and the global ESR lead's; the person who prepared it cannot sign.

Can an agent approve a payment, ship product or close a study?

No. The agents read, match, forecast and draft, and make no decisions. They do not change a baseline, approve or release a payment, ship product, send a message to an investigator or close a study. A reading below a confidence of 0.95 goes to a person, each decision is an electronic signature with its meaning, and the person who prepares an item does not approve it.

How does our current ESR portfolio move onto it?

Your existing portfolio comes in from a flat file: the portfolio import mapper maps the columns, checks each row against its business unit's mandatory fields and for duplicates, and a person approves the import after a dry run. The Agentic Solution Engine builds and deploys the solution from your requirements and documents (your research agreements and payment schedules, each business unit's fields and steps, and a sample of past quarterly reports, shipping replies and invoices), and it goes live once each quality check has passed. We will walk you through it on your own studies first.

Try investigator-initiated study management
on your own quarterly reports.

We'll run Investigator-Initiated Study Management on a sample of your own quarterly reports, shipping replies and invoices.