Reads shipments, installs, service orders, transfers, trade-ins and contract schedules.
- Never reads a service order's problem text
- Never guesses a missing serial
PM scheduling that starts from where each serial really is: agents rebuild the installed base from its own records, people settle the conflicts, and the PM list follows the signed base.
Follow eleven pumps from a dashed line to the PM list ↓The installed base lives in five places. The ERP knows the ship-to address, the service system knows the site acceptance, and service orders scan each serial where the engineer finds it, months later. Hospitals move equipment on transfer forms the contract system often does not see, and trade-ins are credited on the new order before the depot has received anything.
The PM plan is built from each agreement's schedule of covered serials. So a unit removed from the schedule but still in use gets repaired on call and left out of the plan. Once a year an analyst exports everything into a spreadsheet and reconciles it by hand.
Built forInstalled base analystsService operations managersService contracts administratorsField service engineers
Each system places a serial somewhere different, and the PM plan follows whichever list it was built from.
Reconciled by hand today
Built-in controls
Each serviced unit sits where its records place it, and the PM list is built from that signed base.
Fourteen hospitals of patient monitors and infusion pumps. The month's records loaded at 06:00. By 07:48 the PM list is built from a signed base.
demoSample data throughout: the health system, its hospitals and floors, each serial, each person, each amount.
The first hospital is drawn floor by floor, with each monitor and pump as a dot where the service system lists it. Nothing has been compared. The side panel lists the six sources and what is read from each, with one line underlined: from service orders the agents read serial, site, unit, dates and work type, and leave the problem description unread.
After the rebuild, dots move to where the signed rule places them. Eight monitors on this hospital turn amber, each with a dashed line to a hollow dot one floor up, because two engineer scans within ninety days put it in each unit. Thirteen serials across the system are serviced on no contract or warranty.
She switches to the hospital with the most amber. Eleven large-volume pumps sit in one medical-surgical ward, and each dashed line ends at a contract schedule that removed them as retired at another hospital. The panel puts them at 11 in conflict, with 11 PM due in 30 days and 12 overdue.
The conflict lays out what the rule did: it placed the pumps at this hospital because transfer and service records do, and sent them to a person because a contract schedule removed them. The agents propose confirming the place and sending the gap to contracts, at 92% confidence. Her decision box reads 0 of 4 records opened.
The customer transfer form moved all eleven serials between two hospitals of the same system, from one medical-surgical ward to its twin. It was submitted through the service portal and received by the service system. It did not reach contract management, where the removal still stands. She reads it in full.
The ERP credit memo lists the pumps credited as traded in, with each depot receipt. Two rows have no receipt at all, which is a separate gap at another hospital. The eleven are not listed, so they were not traded in. With the amendment and the service orders, all four records point the same way.
She keeps the agents' proposal, picks the reason that the records support it, and enters her own password to sign. Her decision says where the serials are, from the records she opened. It enters the base only when the service operations manager signs the month's update. Her role has no sign-off on the base.
Before he signs, he reads a sample of the 177 changes the rule made alone, drawn with a logged seed and at least 3 of each kind. Each row shows where the service system listed the serial, where the rule places it and the record that decides. The sheet counts only after he scrolls to the end. Then he opens the eleven-pump decision and signs.
Built from the signed base, the list puts the units on no contract first: eleven pumps whose last PM was at the old hospital. Below them, 130 visits are due in 30 days on contract. Whether the pumps stay in use is the hospital's clinical engineering decision, and the contract change has to come first.
The analyst opened each before she could decide.
| Record | What it says |
|---|---|
| Amendment 3 to the infusion pump agreement | 40 pumps retired at one hospital removed from Schedule A |
| Customer transfer form | The eleven moved to the same ward at another hospital; received by service, not contracts |
| Service orders since the transfer | Scanned at the new hospital, closed as covered |
| Trade-in credit memo | 29 credited as traded in; none of the eleven |
| Last PM, at the old hospital | 336 days overdue |
demoSample data, from the working solution. The service system still carried the pumps under the agreement. Only the contract system had removed them, so the PM plan built from Schedule A left them out.
Drafted by the agents from Schedule C; prepared by contracts and approved by the service operations manager before it goes to the hospital.
| Per-pump rate, Schedule C | $826 |
| Pumps added | 11 |
| Added a year | $9,086 |
| First three months, prorated | $2,271.50 |
demoSample data, from the working solution.
What contracts, the analyst and the service manager read once the base is signed.
demoSample data, from the working solution.
They read, match and propose. People decide and sign.
Reads shipments, installs, service orders, transfers, trade-ins and contract schedules.
Joins every record to one serial and flags serials no record has.
Places each serial under the signed record-wins rule and sends real conflicts to the analyst.
Finds serials serviced on no contract or warranty.
Builds the PM due list from the signed base and each agreement's interval.
Drafts the contract amendment from the rate schedule, each line cited.
The analyst decides each conflict; the base needs someone who did not.
PM scheduling here means building the list of planned maintenance visits from where each serial really is and which agreement covers it. The agents first rebuild the installed base from shipment, install, service, transfer and trade-in records, and the list follows the signed base.
No. It reads both, with the ERP, and writes to none of them. Amendments and asset lists go out through the people who own them.
By a written rule the service operations manager signs, such as a later engineer scan over an older install record. Where the rule does not settle it, the serials go to the analyst as a conflict.
Because a person sees few of the changes otherwise. The manager reads a random sample, drawn with a logged seed, before signing. A mismatch stops sign-off and draws a larger sample.
No. From service orders it reads serial, site, unit scanned, dates and work type. The problem description and the engineer's notes stay unread.
They lead the PM due list and appear as contract gaps. Contracts drafts an amendment at the agreement's own rate; whether a unit stays in use is the hospital's decision.
Yes, after the month's base is signed and shared. A hospital sees only its own signed asset list and the amendments proposed to it.
Install-date risk on screen weeks before the truck, every gap tied to its sheet.
1-min demoHospital Security Questionnaire and MDS2 ResponseOne true answer per product version, checked against the SBOM and everything said before.
1-min demoService Contract Entitlement CheckEvery service call covered, billed or quoted from the clause that decides it.
1-min demoWe will rebuild its installed base from the records and show you the units serviced on no contract.