Lead the inspection, decide each held request and sign the summary and responses
- Gaps found before the investigator sees them
- A decision screen with only honest choices
- Learned rules that wait for their approval
GMP inspection readiness that runs the front room and the back room on one screen: each request on its clock, each page read for gaps before it goes in, and the QA head deciding how a gap is shown.
Follow one glove integrity request into the front room ↓On inspection day the scribe types the investigator's words into a spreadsheet, a runner carries them to the back room, and someone searches the QMS, the document system and scanned paper logbooks. The pages come back with the clock running, and QA skims them on the way to the door.
So the missing second signature or the extension nobody can explain is read first by the investigator, in front of the plant head. At a contract manufacturer the finding travels: each client with product made in that plant reads it, and some are deciding where their next product goes.
Built forQA headsBack-room leadsSubject matter expertsPlant heads
Pages go into the front room skimmed under the clock, so the investigator is the first to see a blank signature.
The back room today
Built-in controls
The investigator learns of a gap from the site's own QA head, deviation number attached, before reading the page.
A mock inspection of a sterile fill-finish plant, nineteen days before FDA arrives. The mock investigator asks for all glove integrity failures on one isolator since the start of last year, with the investigations.
demoThe plant, the CDMO, its client, the people and the records are sample data.
The scribe and the retrievers feed them, and these four carry inspection day.
Lead the inspection, decide each held request and sign the summary and responses
Run the request queue, assign retrievers and review each record before it goes
Own the storyboards for their area and answer the investigator in the front room
Host the investigator in the front room and co-sign the responses
Before the inspection the agents rank topics and rehearse the expert; after it, the response kit counts the days.
demoSample data, from the working solution.
Each agent hands its result to the next or to a named person, and none of them alters a record.
Turns the scribe's line into a structured request with record type, equipment and dates, quoting the words it came from.
Queries the QMS, eBR, LIMS, the monitoring system, the document system and the logbook scans.
Reads each page and line in scope for missing signatures, superseded procedures, late entries, open actions and contradicted storyboards.
Plays the investigator: asks the next question, and attacks the agents' own scope and drafts.
Ranks topics by FDA's published themes against the plant's open CAPAs, extensions, excursions and investigation ages.
Drafts storyboards and model answers for the experts, each sentence cited.
Writes the daily summary from the request log: requests, documents, pages, gaps and commitments.
Drafts each observation's response: investigation, correction, CAPA, dates and evidence.
GMP inspection readiness is a plant's ability to answer an investigator's requests quickly with records that hold up. Here it covers the day itself: the scribe's words become timed requests, agents retrieve and pre-read the records for gaps, and the QA head decides how anything found is shown.
The investigator sits in the front room with a host, a QA lead and a scribe who logs each request. The back room, often called the war room, retrieves and reviews each record before it goes in.
The request is held. The back-room lead reads the records and confirms the gap on the page, then the QA head decides: present the record as it stands with a deviation opened for the gap, or retrieve more. A late or backdated signature is not offered, in line with FDA's data integrity guidance.
FDA's guidance on delaying, denying, limiting or refusing a drug inspection says a delay in producing records can be treated as limiting the inspection. The clock turns amber well before the plant's target, so a request can be reassigned in time.
Internal audit plays the investigator and the plant runs the day as it would a real one. The challenger asks what investigators and client auditors asked here before, and each mock observation goes into the response kit and on to the CAPA system.
FDA considers a response received within fifteen business days of the observations before deciding on a warning letter. The response kit counts those days from the close-out without federal holidays, and the QA head and the plant head both sign each response.
During an authority inspection, each client's quality person receives that evening the daily summary lines for their own products only, as the quality agreement sets out. In a mock inspection the extract is rehearsed and stays unsent.
A missing second-person verification, a superseded procedure, a late entry or correction without its reason, an open action, and a record that contradicts a signed storyboard. Switching a check off needs the QA head's signature.
A weak barrier shows the day its records change, not at the yearly review.
1-min demoClient Batch Release PackagePackages reach the client already checked the way the client's own reviewer checks them, so its release is not held up by send-backs.
1-min demoDeviation Reporting & ClassificationEvery report heard in the operator's own words, contained at once, classified by QA the same day.
1-min demoSend one logbook and the requests from your last inspection, and we will run them through a back room that reads each line first.