SearchWorkforce, HR & Knowledge

Expert Knowledge Capture

Utility knowledge capture for a retiring workforce, where crews hear the expert's own answer, cited to the second and approved for use

See one case, screen by screen ↓
Watch with transcript →

Built forLineworkersSubstation operatorsPlant operatorsEngineering supervisorsTraining teams

The Problem Today

When a crew gets stuck on something rare, they phone the one expert who knows, and that answer retires with them.

45%
of lineworkers can retire within 10 years published
56%
of the energy workforce has under 10 years of service published

Where the know-how sits today

  • Memory
  • Recordings
  • Manuals
  • Notes
  • Hours waiting by the phoneSwitching stops until the expert calls back
  • Recordings no one can searchHours of interviews, and no way to find the moment that matters

The Solution

  1. Gaps found before they leaveCritical tasks known by one person, ranked by risk and last working day
  2. Recorded at the equipmentWalk-throughs transcribed with each word timestamped, and the know-how in the margin
  3. Expert signs, owner approvesNothing answers a crew until both have signed it
  4. A crew asks in plain wordsThe expert's own clip plays first, then the steps, each cited

Built-in controls

  • Safety rules quoted word for word
  • Steps not in the procedure are flagged
  • The expert can withdraw any clip, any time

What You Get

More maintenance windows hold, and rare faults are cleared sooner, even after the one person who knew has retired.

  • New crews up to speed soonerA new authorized person learns from the experts' own answers
  • Risk seen before the last dayWho is leaving, and what only they know, seen months ahead
  • Old recordings made usefulPast sessions searchable to the second, and cited
In short

What is Expert Knowledge Capture?

It is software that keeps what retiring engineers, lineworkers and operators know, and gives it back to crews when they need it. Expert Knowledge Capture turns recorded interviews and site walk-throughs into signed, cited know-how. It answers a crew's question with a clip of the expert explaining it, with the steps and the procedure beside it.

How to choose AI solutions for utilities →

Updated

The problem

When a utility's expert retires, the answers only they know leave too

At a utility, the senior substation engineer, the line foreman and the lead process operator know things nobody wrote down. They know the quirk of a 1971 switchboard and the fall week the lake turns over. They also know which tie must stay open while a farm's generator runs. When a crew gets stuck, it calls that person, often at home at six in the morning. When that person retires, the answer goes with them. One primary substation in the sample utility shows the cost. Its switching procedure (revision C, 1998) leaves out one step the old board needs. Five times over the years, the switching program stopped at that step. Two years ago, with the expert on leave, the transformer work was canceled and 1,860 customers were off 3 h 40 min longer.

Many utilities already record exit interviews and walk-throughs. But nobody can find the 40 seconds that matter at 06:24 on a switching morning. The sample utility had 31 h 47 min of recordings from 14 retiring experts. Without a list of the critical tasks known by one person, interviews follow the expert's memory instead of the risk. At the sample utility, 37 critical tasks had no usable written method, and 11 were known by one person only.

typical56%of the energy workforce has under 10 years of service
typical21%of water utility staff can retire within 5 years
Where the days go to capture one retiring expert's know-howestimated
By hand43 days
With the solution11.5 days
  • Working out which critical tasks only they know5 → 1 d
  • Planning sessions and drafting the questions3 → 1 d
  • Recording interviews and site walk-throughs4 → 4 d
  • Transcribing the recordings10 → 0.5 d
  • Writing up the know-how and linking assets, drawings and procedures15 → 2 d
  • Expert sign-off and knowledge owner approval6 → 3 d

Estimated split for one senior expert with about eight sessions, in working days, by hand and with the solution. Recording time stays the same. The expert's and the owner's review stays with people.

How it works

From a recorded walk-through to a signed answer a crew can hear

What comes in
Sources inHours of recorded sessions · interviews, walk-throughs, procedures, work orders
Agents at work
Interview transcriberword timestamps
Then
Know-how extractor
Asset and record linker
Then
Answer finderthe expert’s clip first
Then
Gap finder
Interview planner
A person decides
The expert and the knowledge ownersign and approve
What comes out
Answer in the expert’s voice
Lessons learned library
Gaps before the last day
One case, step by step

A stuck interlock key at dawn, answered in the expert's own recorded voice

It is a weekday morning at a 33/11 kV primary substation. An authorized person, cleared to carry out switching, is working with a craftsperson. They are running the switching program to release transformer T1 for maintenance, 06:00 to 14:00. Section B, 2,940 customers, stays on through the bus section. At step 14, the interlock key will not come out of the key exchange box. Here is what happens next, screen by screen, in the working solution.

A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.

  1. 0106:26

    The question, asked in plain words from the job

    Authorized person, switching

    The authorized person has four years' service. They type “key won’t come out of the key box after opening the bus section”. The live job sits above the question. It is the switching program at step 14 of 31, with T1 out for maintenance and 2,940 customers on supply through the bus section. Under it, the steps taken to find the answer tick through.

    “Answer finder · searched 335 signed items and 31 h 47 min of sessions · 3 matches · best: the senior engineer, session 3, 23:41”

  2. 024.8 s later

    The answer is the expert explaining it

    Answer finder

    The answer leads with a 40-second clip of the senior protection and substation engineer, who has 38 years' service. It comes from the recorded walk-through of this substation, 23:41 to 24:21. The transcript lights up word by word as it plays. The whole interview runs down the right, scrolled to the moment. The authorized person can hear 20 seconds either side or open the session.

    “So you never force it. Open the mechanism door on panel four, charge the spring by hand, eleven strokes on the lever.”

  3. 03What to do

    Five steps, each cited, one marked as not in the procedure

    Answer finder

    Step 1 quotes the utility's safety rules, which say to stop and not to force the key or work around the interlock. Step 2 cites step 14 of the site's switching procedure. Step 3 is to charge the bus section breaker's closing spring by hand, 11 strokes, until the flag shows yellow, CHARGED. It cites the expert at 24:04 and the as-built drawing, sheet 3, note 6. Step 4 adds a warning from the breaker manufacturer's manual that charging the spring does not close the breaker.

    “Approved for use by the knowledge owner, protection engineering. A change to the switching procedure is open with network standards.”

  4. 0406:41

    Key out, the program on time, no customer off

    Authorized person, switching

    The past-jobs strip shows each time the key stuck. The first time, with the expert on site, it took 25 min. Then came waits of 1 h 50, 2 h 30 and 2 h 10 on the phone for the expert. Two years ago the program was abandoned. Today the key is out at 06:41. The authorized person rates the answer right, and the note goes on the know-how item's record.

    “Rated right · your note “11 strokes exactly” is added to the item's record”

  5. 05Where it came from

    A walk-through recording, with the know-how in the margin

    Interview transcriber and know-how extractor

    The capture lead recorded session 3 with the expert at the 11 kV board. It runs 1 h 38 min and holds 27 pieces of know-how, 25 signed by the expert. Each mark on the timeline is tied to the second it was said. In the margin beside 23:41 sits the item “Key trapped: charge the bus section's closing spring by hand (11 strokes) first”. It is signed and approved, and flagged as not in the switching procedure.

    The expert, 24:29: “The crews call me. Call me at home, mostly at six in the morning.”

  6. 0645 days left

    Who leaves, and what leaves with them

    Knowledge capture lead

    Fourteen people with 20 years or more leave in the next 18 months, seven in electricity and seven in water. Each bar runs from today to their last day. It shows the share of their critical tasks already recorded and signed. The senior engineer leaves in 45 days at 78%, 18 of 23. The control room shift manager is at 13%. Four people have nothing recorded yet.

    With 45 days of the expert left, the sessions go to the questions that matter instead of 9 hours of reminiscing.

  7. 07The gaps

    What nobody else at the utility knows

    Gap finder

    The gaps list reads 14 years of work orders, the procedure library and each recorded session. It ranks critical tasks with no usable written method by risk. Two are known by the senior engineer only, both at a second substation. One is a trapped bus-section key, with 3 jobs over the years and no note. The other is T2's tap changer, which adjusts the transformer's voltage. In a cold snap it hunts up and down, and the notes on its 6 jobs just say “adjusted”.

    The gap finder ranks tasks and never people. It takes leaving dates only from the HR leaving plan.

  8. 08Before Thursday

    Session 7's questions, drafted from the gaps

    Interview planner

    The expert's walk-through of the second substation is on Thursday at 09:30, for 90 minutes. The guide asks whether the spring there also takes 11 strokes, and which side the lever is on. It asks what “adjusted” means on the T2 tap changer, and who should learn that substation from the expert. It also lists the walk-through route and what to film: the spring lever, all strokes, and the flag color.

    The planner drafts, and the capture lead edits the guide and sends it. The planner does not contact the expert.

  9. 09Sign-off

    Nothing answers a crew until two people have signed

    Knowledge owner, substations

    Six items wait for a signature, and two of them differ from a written procedure. Each shows what the expert said beside the wording crews will get, and the check against the procedures. One is the lead process operator's item for filter 6. It says to run the filter to waste for 14 minutes after a burst main upstream, where the operating procedure sets 10. So the procedure owner decides as well as the knowledge owner.

    An expert's step that is not in the procedure reaches the knowledge owner before it reaches a crew.

Who it’s for

The crew, the retiring expert and the knowledge owner around one answer

The same know-how, seen by the five people around it. They are the crew on site, the expert who is leaving, the capture lead, the knowledge owner and a water operator.

Authorized person, switching
Runs planned switching at primary substations
Before
Has four years' service and runs planned switching from 06:00. When a 50-year-old board behaves oddly, has to stop and phone around for someone who has seen it.
Now
Asks from the job and hears the expert explain it, with the safety rule, the procedure step and the drawing note beside it. Wants the expert's own words instead of a summary.
Retiring senior engineer
Protection and substation engineer, 38 years
Before
Is still the person crews call when the old substation misbehaves. Said years ago that the step is missing from the switching procedure, and wants it written down this time.
Now
Records desk interviews and site walk-throughs, and signs their own words. So far that is 6 sessions, 9 h 12 min and 148 pieces of know-how, 131 of them signed. They have been cited in 212 answers.
Knowledge capture lead
Plans and runs the sessions
Before
Plans sessions from the expert's memory, runs the interviews and chases sign-off before leaving dates.
Now
Plans against the leaving timeline and the gaps. Edits the guides the planner drafts, and sends them. Asks the questions that matter instead of hours of reminiscing.
Knowledge owner
Approves know-how for substations
Before
Hears about an expert's workaround only when something goes wrong on site.
Now
Approves each item before crews can use it, and sees where it differs from a procedure. Raises the change with the clip attached, so a step missing from the procedure is seen before a crew meets it.
Lead process operator
Runs a water treatment works, 31 years
Before
Runs the works through the fall lake turnover by feel and by the oxygen reading at 18 m. Two years ago, with the operator on leave, the works dosed only once manganese showed. Customers made 131 contacts about discolored water.
Now
The operator's trigger is signed and approved. Any operator who asks hears it explained. The oxygen reading at 18 meters, which nobody else reads, shows the turnover is coming.
The agents

Transcribing, linking and answering: the agents that capture expert know-how

Each recorded session becomes signed know-how, and crews are answered with the expert’s own clip. The expert signs, and a knowledge owner approves.

Interview transcriber

Turns each recorded session into a transcript with speaker turns and a timestamp on each word, in the expert's own language. Marks site noise and anything it cannot hear.

  • Never changes the expert's words
  • Marks “[inaudible]” instead of guessing
Know-how extractor

Finds each piece of know-how (when this, do that, because) with the exact words and seconds it came from. Checks it against the written procedures and marks it covered, matching or different.

  • Never publishes an item the expert has not signed
  • Never rewrites a safety step
  • Flags each difference from a procedure
Asset and record linker

Links each item to the assets, drawings, procedures, past work orders and customer generation it is about.

  • Never links a superseded drawing without saying so
Answer finder

Answers a crew's question with the expert's clip first, cut to whole sentences. Then come numbered steps, each citing a timestamp or a document with its revision and page. It says when a step is not in the procedure and who approved it.

  • Answers only from signed, approved items
  • Never answers a switching, isolation or earthing step from a clip alone
  • Quotes safety steps from the safety rules word for word
Gap finder

Finds critical tasks with many jobs, no usable written method and few people who have done them. Ranks them by risk and by the last person's leaving date.

  • Ranks tasks, never people
  • Uses leaving dates only from the HR leaving plan
Interview planner

Drafts each session's questions, walk-through route and shot list from the gaps and the alarm log, for the capture lead to edit and send.

  • Never contacts the expert. The capture lead sends
Knowledge owner

Approves what crews hear.

Ask in plain words

Questions to the experts' recorded knowledge, answered with the clip

Ask about any site, task or expert, or say what to do next. Answers come with the clip, the timestamp and the procedure. These answers use the sample data.

What else did the senior engineer say about this substation that is not in a procedure?

Six things, all from session 3. The key needs the bus section's spring charged first, which is approved with a change request open. Check T2 is under 18 MVA before releasing T1. Panel 7's earth switch hasp is reversed, so lock it from the back. Battery charger alarms under 8 °C are caused by the cold, so check the heater. The cable trench floods past 40 mm of rain in leaf fall, and that item waits for the expert's signature. When control loses the site, switch on the panel flags, in wording the expert edited. Only the first touches switching, so only it needed a procedure change.

Which critical tasks will nobody know once the senior engineer leaves?

Two tasks are known by the senior engineer only. One is releasing a trapped key at the second substation's board, with 3 jobs over the years and 20% recorded. The other is that substation's T2 tap changer hunting in a cold snap. It has 6 jobs where the notes say “adjusted”, and 0% recorded. Both are in the guide for session 7 on Thursday. Two more are shared with another engineer, who leaves next year.

Draft more questions for the walk-through of the second substation

Here are three more, each from a gap or the expert's alarm record. One is what the old relays need for next year's pilot-wire tests, which the test sheet leaves out. Another is how to change over the DC supply by hand if the charger fails. The third is which alarms the expert treats as nuisance and which always matter, since 41% of 1,206 acknowledgments this year were the expert's. The capture lead sends the guide, and the expert is not contacted directly.

Send the key step to the procedure owner as a change to the switching procedure

Done. It is added to the open change request for network standards. The request now carries the expert's 40-second clip and transcript, the as-built drawing (sheet 3, note 6) and the knowledge owner's approval. The five past jobs are attached too, including the program abandoned two years ago. Until the procedure changes, the answer keeps its “Not in the written procedure” mark.

The screens

The expert's clip on a live job, the leaving timeline and the sign-off queue

From the working solution, on its sample data. Pick one to see it large.

Ask: the expert's answerThe question from the live job, the expert's 40-second clip with the transcript lit word by word, and the whole interview beside it.
How the answer was foundSix steps in 4.8 s. The site, the box and the job are found, signed items searched, procedure and drawing linked, and the clip checked against the written procedure.
What to do, each step citedThe safety rule quoted word for word, procedure steps, and the expert's step marked “Not in the written procedure” with its approval.
The times it happened beforeFive earlier jobs and how long each waited, today's 15 minutes, who stands behind the answer, and the crew's rating.
A water answer: the lake turnoverThe lead process operator explains when to raise permanganate at the intake, with today's oxygen reading at 18 m.
A recorded sessionThe session timeline with its chapters, the transcript by speaker, and the know-how in the margin with its sign-off status.
Who leavesEveryone with 20 years or more leaving in the next 18 months, sessions on each bar and the share of critical tasks recorded and signed.
One expert's pageThe expert's countdown, what they know by site and how much is recorded, their most-played clips, sessions and consent.
Critical tasks nobody wrote downTasks ranked by risk, how often they happen, who knows them, how much is recorded and when the last person leaves.
Sessions and interview guidesSeven weeks of sessions planned against leaving dates, and a guide with questions drafted from the gaps, the route and what to film.
Lessons learnedEach signed piece of know-how with its clip, by month, because much of what experts know is seasonal.
Sign-offWhat the expert said beside the wording crews will get, the check against the procedures, and the expert, knowledge owner and procedure owner.
SettingsWho signs, how clips are cut, what counts as a conflict with a procedure, languages, consent and how long the voice is kept.
Governance

Signatures, consent and safety rules in expert knowledge capture

Each timestamp is a citationEach step in an answer cites a timestamp in a signed session, or a document with its revision and page. Click a timestamp and it plays the expert saying it.
The expert signs, the owner approvesNo item answers a crew until the person who said it has read and signed it. A knowledge owner for that area must also approve it for use. Unsigned items do not answer.
“Not in the written procedure”, said out loudSwitching, isolation and earthing steps need a procedure citation or the knowledge owner's approval. A step the procedure leaves out is marked as such. The mark shows the approver and the open change request, and it stays until the procedure owner decides.
Safety rules quoted word for wordA safety step is quoted from the safety rules word for word. If a key will not release, the answer starts with the rule to stop and not force the key or work around the interlock.
Consent the expert controlsConsent is signed before each recording starts. The expert can withdraw any clip, and it leaves all answers the same minute. The voice is kept 10 years after the expert's last day. The transcript and items are kept for the life of the asset.
Each question and signature on the recordEach question, answer, clip played, rating, sign-off and change is recorded with who and when. The agents do not contact experts, change a procedure or rank people.
Configuration

Who signs, how clips are cut and what counts as a conflict with a procedure

Who signs, how clips are cut, what counts as a conflict and how long the voice is kept are settings. Changes are saved as a new version and logged.

SettingDefaultChoose from
The expert signs their own words firstOnNo item answers a crew until the person who said it has read and signed it
Knowledge owners5 ownersSubstations · water treatment · overhead lines · cables · network control, each with one named owner
Reminder when a signature waitsAfter 10 daysTo the expert, copied to the capture lead
Clip length20 to 60 sCut to the sentence, never mid-word · transcript always shown beside the clip · crews can hear 20 s either side
Switching, isolation and earthing stepsOnNeed a procedure citation or the knowledge owner's approval. Marked “Not in the written procedure” until the change is made. A procedure change opens automatically, with the clip attached
LanguagesSet per utilityTranscripts and answers in the languages set; the clip stays in the expert's own language
Keep the voice10 years after the last dayTranscript and items kept for the life of the asset · recorded consent per session · the expert can withdraw any clip
Who is on the leaving planLast day within 18 months, at least 20 years' serviceFrom the HR leaving plan · also anyone who is the only person to have done a critical task, from the gaps
Connections

Recordings, procedures and work orders that feed expert knowledge capture

Interview and walk-through recordingsdesk interviews and site walk-throughs, with consent, in the expert's own language
Procedure library and safety rulesswitching procedures, operating procedures, safety rules, each with revision and page
Drawings and manualsas-built drawings, feeder diagrams, intake drawings and manufacturers' manuals
Work order historypast jobs on each asset, how long they waited and what the crew noted
Asset and generation registersthe asset hierarchy, criticality and customer generation on each feeder
HR leaving planleaving dates and years of service, for the watchlist and the gaps
What it changes

Shorter waits on rare jobs once the knowledge is captured

Each figure carries its label: a target the solution is built to, an estimate, a typical published result, or a proven one.

typical
45%
of lineworkers can retire within 10 years. What they know stays, in their own voice
45 in 100
lineworkers can retire within 10 years
target
15min
to the senior engineer’s answer on a rare event, cited and approved, instead of hours by the phone
Phoning the expert1 h 50 to 2 h 30
Asking≈ 15 min
target
30%
shorter time to competence for a new authorized person
Today100%
With the experts’ answers70%

“Demo” means seen in the working solution, on its sample data. “Target” means the design goal. The 1 h 50 to 2 h 30 waits are the sample utility's past jobs. “Estimated” means our estimate of the working-days split. “Typical” means published figures. T&D World, on the utility workforce crisis, reports 45 % of lineworkers can retire within 10 years. AWWA 2025 reports 21 % of water utility staff can retire within 5 years. CEWD, via APPA, reports 56 % of the energy workforce has under 10 years' service. Names on the screens are sample data.

Questions

Utility knowledge capture questions from operations and HR leaders

What is expert knowledge capture software for utilities?

It is software that keeps what retiring engineers, lineworkers and operators know, and gives it back to crews when they need it. Expert Knowledge Capture turns recorded interviews and site walk-throughs into signed, cited know-how. It answers a crew's question with a clip of the expert explaining it, with the steps and the procedure beside it.

How does expert knowledge capture work?

Each session is transcribed, with a timestamp on each word. The know-how extractor finds each “when this, do that, because” with the seconds it came from. It checks each one against the written procedures. The linker ties it to the asset, the drawing and past jobs. The expert signs their own words and a knowledge owner approves them. Only then can the answer finder use them.

How do we capture tacit knowledge before an expert retires?

Start from the risk instead of the expert's memory. The gaps list shows critical tasks with no usable written method, and who knows them. Beside it, the leaving timeline shows who leaves when. From the gaps, the interview planner drafts each session's questions, walk-through route and what to film. The capture lead edits and sends the guide.

Can a crew act on a switching step that is only in a recording?

Not from a clip alone. A switching, isolation or earthing step needs a procedure citation or the knowledge owner's approval. A step the procedure leaves out is marked “Not in the written procedure”, with the approver and the open change request. Safety steps are quoted from the safety rules word for word. The authorized person on site decides what to do.

Does it work for water treatment and networks as well as electricity?

Yes. In the working solution, half the leaving plan is in water. It includes a lead process operator at a treatment works, a sludge treatment operator, a pumping station technician and a reservoir and dam safety engineer. One answer gives operators the trigger for raising permanganate before the fall lake turnover. The water treatment knowledge owner approved it.

How much sooner does a crew get the answer on a rare job?

The answer stays, signed and cited, when the expert retires. The design target is about 15 minutes to the senior engineer's answer on a rare event. On past jobs, the sample utility's crews waited 1 h 50 to 2 h 30 by the phone. A second target is a 30% shorter time for a new authorized person to become competent.

Can an expert take back something they said on a recording?

Yes. The expert signs their own words and can withdraw any clip, which leaves each answer the same minute. A named knowledge owner approves each item for use. The procedure owner decides on procedure changes. The agents do not contact experts, change a procedure or rank people.

What records and recordings do we need to start?

We need your procedure library, safety rules, work order history, HR leaving plan and a few recorded sessions. The Agentic Solution Engine builds and deploys it from those requirements and documents. It goes live once each quality gate has passed. We will walk you through it on your own recordings first.

Run expert knowledge capture
on your own recorded sessions.

We'll run Expert Knowledge Capture on a sample of your own recorded sessions, procedures and work orders.