VD-2401-L loaded as Rev 2, the plant copy, where the vendor's Rev 5 belongs.
EDMS migration of one refinery wave: 214,906 records out of the drawing vault
Wave 9 carries the hydroprocessing units' records out of the drawing vault. The freeze runs from Friday 6:00 PM to Monday 6:00 AM, and the rehearsal starts ten days before it, while there is still time to fix what it finds.
demoThis wave, its people and its record counts are sample data.
- 01Ten days out
Eight waves closed with 0 missing, and Wave 9 is next on the calendar
Migration leadThe first screen is the whole program: 14 waves on a year calendar, each a block of records leaving a share, a vault or a box room, with a no-move band around the turnaround. Beside it runs the custody ledger: left, arrived, held, retired, missing. The last column has to read 0 before a wave can be signed, and Wave 10 already shows a date clash.
- 02Rehearsal 1
Rehearsal on copies: 35 files missing and 26,871 links that would go stale
Agents, for the migration leadThe run copies every record and its revisions into a rehearsal copy of the new system. 204,083 arrive and match their fingerprints, 1,842 are held and 8,946 retired, so 35 are missing and the ledger refuses to close. The link walk finds 18,362 maintenance links, 6,092 drawing cross-references and 2,417 procedure links that point at the old vault.
- 03Before the freeze
Three old numbers have two answers, and he settles each one himself
Maintenance systems liaisonThe forwarding table holds one line for each old number, so a link nobody found still lands. 26,114 links land on a moved record, 612 on a held record and 145 on a retired one. One isometric became two sheets, one seal plan covered two pumps, one number held a vendor original and a plant copy. He settles those, opens three spot rows, then approves his 18,362 maintenance lines.
- 04Rehearsal 2
The 35 arrive on a short path, and the ledger closes at 214,906
Migration leadThe rerun reads the skipped files on a short path, keeping each original name, and applies the approved table to the rehearsal copy. 204,118 arrived, 1,842 held, 8,946 retired, 0 missing. Every link lands in the rehearsal copy, and the screen says plainly that the live maintenance system has not been touched yet.
- 05Ledger check
He opens one held record per reason before he countersigns
Document control managerHeld is fine; unknown is not. The wave page breaks the 1,842 held records into open changes, legal holds, unreadable files and records with no owner, and the 8,946 retired into past retention and exact copies. He opens a record from each group, sees why it stays or goes, and countersigns. The migration lead made the ledger, so she cannot check it.
- 06Owner sample
Third of 40: the plant copy, Rev 2, sits where the vendor's Rev 5 belongs
Information ownerThe sample of 40 takes every record changed by a rule or a person, then a spread by type. She opens them one at a time, old vault beside new system. On VD-2401-L the fingerprint does not match the vault file and the revision reads 5 against 2, with no rule to explain it. Pass stays grey: a record cannot pass with an unexplained difference.
- 07Owner sample
One failed record reopens the whole wave's ledger, with its name on it
Information owner, then the migration leadShe fails it as a wrong revision. The ledger drops back to 1 missing and names VD-2401-L, and the plan marks Wave 9 reopened. The migration lead reloads it from the right file, which re-checks every record changed by a person or a rule and corrects 14 more. Then a rerun, a fresh ledger check and a new draw with a new seed.
- 08Freeze weekend
212 records fail to load on a locked index, with the freeze clock running
Migration leadWith the go signed on a clean draw, the freeze opens and the load begins. The new system times out on a locked index and 212 records do not load. The plan shows Wave 9 with 212 failed and 212 missing in the ledger, and says the freeze ends Monday at 6:00 AM. She retries the 212 before anyone calls the load done.
- 09Last hours of the freeze
Three live links opened by hand, then a close with four signatures on it
Document control manager, then the information ownerAfter the retry, the link walk on the live systems reports 204,118 arrived and 26,871 links answered. He opens three live links himself, a work order, an equipment record and a maintenance plan, and passes the check. She closes the wave. The record carries the ledger check, the go after opening 40 of 40, the live check and the close.