Electrical Drawing Approval demo

Clause-cited comments to the consultant on day one. 1:14

What the demo shows

A workflow solution for design reviewers that checks consultant electrical drawings.

Six agents read every sheet of a consultant's design package the moment it arrives: each breaker, cable, CT, relay setting and room dimension. They check the drawing against the utility's design standards and the consultant's own load schedule together, so a 400 A breaker on a 520 A load is caught on the first round. Comments sit on the drawing as bubbles, each tied to its clause and the schedule rows behind it. The design approval engineer accepts, edits or dismisses each one and signs; the consultant gets one clause-cited comment sheet on day one, and the declared load flows into the network plan.

Transcript

  1. Electrical Drawing Approval checks consultants' electrical drawings for utility design reviewers.
  2. A breaker sits on one sheet, its load on another, so mismatches surface after resubmission.
  3. Cedar Quay Tower be arrived at 8.52, 7 files, with drawings and a load schedule.
  4. Six agents read 312 items and run 31 checks.
  5. A bubble appears on the main breaker.
  6. rated 400 amps for a 520-amp load.
  7. The load thread shows why.
  8. Seven schedule rows, diversity applied, 360 kVA.
  9. Priya accepts the comments and signs.
  10. The consultant gets every clause on day one.
  11. Fewer resubmissions, nothing undersized on site, and the load goes into the network plan.
  12. Built on Botminds: agents, data, screens, and governance on one platform.

Transcribed from the film’s narration. Captions are on the player.