- Before
- Cleared about 90 emails a day by reading each one, searching for the account and re-typing it. Half the day went on copying account numbers from emails into a screen.
- Now
- Reads drafted replies with each account fact underlined to its source, and sends, edits or reroutes them. A split email arrives as one finished reply.
One move-out email, three teams and a single reply before noon
On a weekday at 08:14, a customer moving out of a high-rise apartment emails the utility. The one email makes three requests and attaches a photo of the water meter. Here is what happens next, screen by screen, in the working solution.
A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.
- 01Morning
The morning's mail, sorted into seven lanes
Case handlerBy 11:12, 1,512 emails and scanned letters have come in since 17:00 the evening before. The agents have sorted 1,441 into seven lanes: payment proof, bill query, move-out, meter reading, refund, outage and solar. The other 71 are with a person. Inside each lane, an email moves from Read to Drafted to With team to Answered. The move-out email shows as three colored strands, one per request.
“1,206 answered · 214 split into threads · 0 fields typed by hand”
- 0208:14
The email and the meter photo, read in seconds
Mail reader and Account matcherThe mail reader reads the 112-word email and the meter photo. From the photo it takes the meter serial, a register of 04821 m³ and the time the photo was taken, the evening before. The account matcher finds the account and premise from the sender address and the account number in the signature. Next, the case writer updates the case with 14 fields, each with its source. Last, the priority watcher checks for risk. It finds no disconnection list entry, no safety words and no medical equipment.
The mail reader does not guess a number it cannot read. It marks it unreadable.
- 0308:15
Three requests become three threads, one per team
Request splitterClosing the account two days later goes to account services. The water reading goes to meter operations. The photo shows 4,821 m³, where the bill used 4,862. The $2,000 deposit refund goes to billing and refunds. That thread waits, because the refund depends on the corrected bill.
Refund thread: “waits for the meter reading”
- 0409:02 and 10:40
The move-out is booked, and the photo corrects the bill
Account services and Meter operationsAt 09:02, account services books the move-out. The final electricity read comes from the smart meter at 23:59 on the move-out day. A water final read visit is set for 10:00 to 12:00. At 10:40, meter operations accepts the photo. The serial matches the premise, and the reading is 41 m³ below the estimate. That is inside the range the reading policy expects. September is re-issued on the actual reading, a credit of $184.50.
“We have re-issued your September bill on the actual reading, which gives you a credit of $184.50.”
- 0511:12
The refund, worked out on the corrected bill
Billing and refundsWith the reading settled, billing and refunds answers the third thread. The deposit of $2,000.00, less the final bill estimate of $641.20, plus the September credit of $184.50, gives $1,543.30. It goes to the bank account on file within 5 working days of the final bill, under the service charter. The thread joiner then joins the three answers into one reply, in the order the customer asked.
The thread joiner does not send a partial reply without the case handler.
- 0611:18
The case handler reads one reply and sends it
Case handlerThe reply is in English, as the customer wrote. Each account fact is underlined: the account number, the move-out date, 23:59, 4,821 m³, $184.50, $1,543.30 and the refund account. Hovering over a fact shows where it came from. The handler sends it at 11:18. That is one email and one reply the same morning, where before it took three replies over about six working days.
The reply can only be sent once all three threads are answered.
- 0709:12
A bill query answered in the customer's own language
Reply drafterAnother customer writes in a language other than English. The September bill is $1,148.90, against $612.30 in August, with no change in use. The reply drafter answers in that language from the meter data. An actual smart-meter reading shows 2,940 kWh, against 1,610 kWh in August. The daily peak falls between 13:00 and 17:00, usually air conditioning on the hottest days. The reply offers a technician to check the meter free of charge. An English version sits below for the handler.
Templates are kept in step across languages. Facts are filled in from the account instead of typed by hand.
- 0807:31
A payment proof jumps the queue before the 14:00 run
Priority watcherA customer on the 14:00 disconnection list emails a bank-transfer receipt for $1,276.40. The priority watcher matches it to the payment posted the night before and requests a hold. Of 128 proofs today, 119 match a posted payment and 6 wait for the bank. The other 3 do not match and go to credit control. At 07:52, another customer reports no power and a parent on home oxygen. The control room calls them at 07:54.
The priority watcher does not cancel a disconnection or reconnect a supply. Credit control decides.
- 09Before the run
Credit control confirms the holds before the run
Collections officer, credit controlThe collections officer confirmed 64 holds at 09:40. Now the officer confirms the 55 more that are matched, so all 119 are held. Those 55 also come off the 14:00 run. Of the 312 accounts on the list, 193 are still to be cut off. Unposted payments are held until 13:45. The three proofs that do not match stay with credit control. One is a part payment, one went to an old account and one came from someone else's account.
A customer who paid this morning has to be known before the 14:00 run.