- Before
- Builds each case's model from the last one and ties out a few totals by hand, never sure that every link came across.
- Now
- Runs one review on each new version and sees each finding on the flow, with its cell and source. Corrects it in a new version with one click.
One electric cost of service study, corrected before the rate case is filed
An electric utility files its next general rate case in 24 days. Its revenue requirement is $1,284.6M, and it asks for an increase of $96.4M. Its class cost of service model is v14, built from the approved model of the prior case. Here is what happens to it, screen by screen, in the working solution.
A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.
- 0124 days before filing
v14 arrives, 24 days before filing
Senior cost of service analystThe analyst uploads the v14 workbook. It has 38 tabs and 412,880 formulas for the test year. The study opens as a flow from cost accounts to functions, allocators and the five customer classes. Each band is as wide as its dollars. This version adds 3 tabs and 18,240 changed formulas. The last review was of v11, ten days earlier, and it was done by hand. It tied out 3 totals and did not rebuild the allocators.
“Not reconciled to the revenue requirement since v11 (by hand) · v14 adds 3 tabs and 18,240 formulas”
- 02The next morning
Seven findings land on the flow
Six agentsThe analyst runs the review. The model mapper maps 9 account groups to 5 functions, 7 allocators and 5 classes. Next, the formula auditor and the allocator recalculator place a flag where each error sits. F1 is on the 4CP band, F2 on line transformers and F3 on distribution O&M, the operations and maintenance cost. F4 is on street lighting and F5 on weighted customers. The run takes 4 min 06 s. A red line opens at the top of the flow.
“The model allocates $1,283,249,500, $1,350,500 short of the revenue requirement of $1,284,600,000”
- 03The tie-out
$1,350,500 short, explained cell by cell
Revenue requirement reconcilerThe study must allocate exactly the revenue requirement in Schedule C-2. The regulatory accountant locked that schedule ten days earlier. Production, transmission, customer service and A&G, the administrative and general costs, tie to the schedule and the test-year ledger. Distribution does not. The model carries $370,149,500 against $371,500,000. Three cells explain all of it. Row 214 is left out of the transformer subtotal (−$1,418,600). Account 593 is typed over its ledger link (−$542,300). Account 373 is counted twice (+$610,400).
It ties to the dollar or explains why not. It does not change the revenue requirement.
- 04F1 · High
The demand allocator reads last summer's peaks
Allocator recalculatorThe 4CP allocator in ALLOC!D27:H27 links to last year's load research tab. It was carried forward from the prior case model. The recalculator rebuilds it from this year's load research, smart meter (AMI) readings from a sample of 1,840 premises. The four summer peaks are 3,402, 3,561, 3,594 and 3,395 MW, an average of 3,488 MW. Residential accounts for 1,608.0 MW of that. So the residential share is 46.10%, where the model uses 46.80%.
It uses the study's own method and flags the source. Method questions go to the manager.
- 05Correct in model
$3.10M moves from residential to commercial
Senior cost of service analystThe analyst selects Correct in model, and the bands re-flow. Residential falls to $645.5M. Small commercial gains $0.97M and large commercial gains $2.13M. The correction goes into v15, a new draft made from v14. The original v14 is kept as built, for the record.
“Corrected in v15 · $3.10M moved from residential to commercial”
- 06F2 · the cell
A subtotal that stops one row short
Formula auditorFUNC!J215 reads =SUM(J210:J213). Row 214 holds account 368.5, for transformers in new subdivisions. Someone inserted it below the range in v12. So $1,418,600 of distribution demand cost reaches no class. The cell's history shows how it happened. The sum was right with four rows in v11. Row 214 was added in v12 and was still left out in v14. The fix is one click, extending the range to J214.
It proposes the fix and does not change a formula itself. Each finding names its cell and its effect.
- 07Three formula errors
The study ties to Schedule C-2, to the dollar
Senior cost of service analystThe analyst corrects F2, F3 and F4 together. The range is extended. Account 593 is linked back to the ledger's $18,962,300. Street lighting comes out of the distribution demand pool. Then the red line turns green, and the class totals count up to their new values. Four of the seven findings are now decided.
“Ties to the revenue requirement · the model allocates $1,284,600,000, to the dollar of Schedule C-2”
- 08Class results
What each class pays against what it causes
Rate design specialistWith the fixes in, the class results update. They show each class's revenue-to-cost ratio, its parity index and the increase it needs to reach cost. The parity index compares what a class pays with what it costs to serve. Residential's is 0.964, so homes pay a little less than their cost. A typical home using 850 kWh pays $128.40 a month now. At cost it would pay $143.94, which is $0.54 less than v14 showed. A million dollars moved between classes changes home bills, and someone has to explain that. The rate designer moves classes toward parity in steps, during rate design.
- 09F7 · explained
Industrial up 13.7%, and why
Prior-case comparerAgainst the approved prior study, the system is up 9.6% and industrial is up 13.7%. That is 4.1 points above the system. Small commercial and lighting also moved more than 2 points, and both are already explained. For industrial, the comparer ties each driver to the test-year ledger. One is a generating unit retired before the test year (+$9.10M). Another is two data-center customers that joined in the test year (+$6.40M). Growth in transmission 12CP, the twelve monthly peaks, added $4.60M. Distribution and customer costs added $2.67M.
“No cell is wrong. The move goes in the testimony.”
- 10Signed · 09:28
The manager decides the judgment call and signs v15
Cost of service managerF5 is a method choice. In the model, the industrial meter weight is typed as 1.0, but this year's meter cost study puts it at 14.6. The prior study used 1.0 by agreement with the ratepayer advocate, so it is the manager's call. The manager accepts the meter cost study weight and accepts F6 and F7. Then the manager signs v15 as the study's witness at 09:28. All five checks are green. The study goes to the director of regulatory affairs for the filing.
Agents find and propose. A person corrects, and the manager signs.