WorkflowRegulatory Affairs & Rates

Cost of Service Study Review

Cost of service study review that traces every formula and rebuilds every allocator before the rate case is filed

See one case, screen by screen ↓
Watch with transcript →

Built forCost of service analystsCost of service managersRate design specialistsRevenue requirement leadsRegulatory accountants

The Problem Today

Analysts copy each model from the last case and check a few totals by hand, so errors are found after filing.

$4.6M
of cost put on the wrong class in one study, found after filing published
16 days
of analyst work for a full review of one study by hand our estimate

Checked by hand, a cell at a time

  • Formulas
  • Allocators
  • Load data
  • Ledger
  • Last year's peaks, reusedAllocators copied forward, rarely rebuilt from source
  • A subtotal one row shortA new account's cost reaches no customer class

The Solution

  1. The study mapped as a flowEach link from cost account to function, allocator and customer class
  2. Each allocator rebuiltRecomputed from this year's load research, billing and cost studies
  3. Tied to the dollarEach function tied to the revenue requirement, each gap explained by cell
  4. Fixed in a new versionEach fix accepted by a person, and the manager signs the corrected study

Built-in controls

  • Each finding cites its cell and its source
  • Agents do not edit the workbook or file the case
  • The reviewed version is kept as built

What You Get

Fewer corrected filings after discovery, because the study the witness defends is checked cell by cell before filing.

  • Class moves explainedEach shift against the prior case, tied to the ledger
  • Review note for discoveryErrata log with cell references and dollars per class
  • Parity per class, updatedRevenue-to-cost ratio and typical bill update with each fix
In short

What is Cost of Service Study Review?

It is a check of a utility's class cost of service model before the model is filed. The check confirms that each formula is right and each allocator matches its source data. It also confirms that the study allocates exactly the revenue requirement. Cost of Service Study Review does this with six agents. They trace every formula, rebuild every allocator and tie the model to the revenue requirement. The cost of service manager decides each fix and signs.

How to choose AI solutions for utilities →

Updated

The problem

No one can check a whole cost of service study by hand before it is filed

Before a utility asks its regulator for new rates, it has to show which customers cause which costs. That is the job of the class cost of service study. It splits the utility's total cost, the revenue requirement, among customer classes such as homes, businesses and industry. The study is a workbook of dozens of tabs and hundreds of thousands of formulas. It sorts each cost by function, such as production, transmission, distribution or customer service. Each cost is also marked as demand, energy or customer cost. Then the study shares each one out to the classes with allocators. An allocator is a set of class shares built from load research, customer counts or meter cost studies.

No one can check that many formulas by hand. Each case's model usually starts as a copy of the last one. A second analyst ties out a few totals, and the outside consultant spot-checks. Formula auditing means following one cell's arrows at a time. Allocators are copied forward and rarely rebuilt from their source, so errors carry over. A 4CP allocator, built from the four summer peaks, still reads last year's peaks. A subtotal stops one row short of a new account, or a number is typed over a ledger link. Each one moves money between classes. The people who find it are commission staff and intervenors, the other parties in the case. They find it in discovery, and the fix becomes an errata filing, a formal correction. That costs another round of discovery and the utility's credibility.

typical$4.6Mof class cost put on the wrong class in one study, found by commission staff after filing
typical0.38-2.5%of formula cells were wrong when researchers audited spreadsheets in real use, even carefully built ones
typical80-90%of audited spreadsheets carry at least one significant error
Where the days go in one study reviewestimated
By hand16 days
With the solution2 days
  • Mapping the workbook and what changed since the last version2 → 0.1 d
  • Tracing formulas and tying out totals5 → 0.3 d
  • Rebuilding allocators from load research, billing and cost studies4 → 0.2 d
  • Reconciling to the revenue requirement schedules2 → 0.2 d
  • Explaining class moves against the prior case1.5 → 0.5 d
  • Writing the review note, deciding fixes and signing1.5 → 0.7 d

Our estimated split for a full review of a 400,000-formula electric study, in working days, by hand and with the solution. A full review by hand includes rebuilding the allocators, which is often skipped today.

How it works

Each formula traced and each allocator rebuilt, cost account to class

What comes in
Model in4 sources · workbook, load research, ledger, prior case
Agents at work
Model mapperaccounts to classes
Then
Formula auditor
Allocator recalculator
Revenue requirement reconciler
Then
Prior-case comparer
Then
Review note writercell references
A person decides
Cost of service managerdecides each fix and signs
What comes out
Flagged cells and allocators
Ties to the revenue requirement
Signed study
One case, step by step

One electric cost of service study, corrected before the rate case is filed

An electric utility files its next general rate case in 24 days. Its revenue requirement is $1,284.6M, and it asks for an increase of $96.4M. Its class cost of service model is v14, built from the approved model of the prior case. Here is what happens to it, screen by screen, in the working solution.

A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.

  1. 0124 days before filing

    v14 arrives, 24 days before filing

    Senior cost of service analyst

    The analyst uploads the v14 workbook. It has 38 tabs and 412,880 formulas for the test year. The study opens as a flow from cost accounts to functions, allocators and the five customer classes. Each band is as wide as its dollars. This version adds 3 tabs and 18,240 changed formulas. The last review was of v11, ten days earlier, and it was done by hand. It tied out 3 totals and did not rebuild the allocators.

    “Not reconciled to the revenue requirement since v11 (by hand) · v14 adds 3 tabs and 18,240 formulas”

  2. 02The next morning

    Seven findings land on the flow

    Six agents

    The analyst runs the review. The model mapper maps 9 account groups to 5 functions, 7 allocators and 5 classes. Next, the formula auditor and the allocator recalculator place a flag where each error sits. F1 is on the 4CP band, F2 on line transformers and F3 on distribution O&M, the operations and maintenance cost. F4 is on street lighting and F5 on weighted customers. The run takes 4 min 06 s. A red line opens at the top of the flow.

    “The model allocates $1,283,249,500, $1,350,500 short of the revenue requirement of $1,284,600,000”

  3. 03The tie-out

    $1,350,500 short, explained cell by cell

    Revenue requirement reconciler

    The study must allocate exactly the revenue requirement in Schedule C-2. The regulatory accountant locked that schedule ten days earlier. Production, transmission, customer service and A&G, the administrative and general costs, tie to the schedule and the test-year ledger. Distribution does not. The model carries $370,149,500 against $371,500,000. Three cells explain all of it. Row 214 is left out of the transformer subtotal (−$1,418,600). Account 593 is typed over its ledger link (−$542,300). Account 373 is counted twice (+$610,400).

    It ties to the dollar or explains why not. It does not change the revenue requirement.

  4. 04F1 · High

    The demand allocator reads last summer's peaks

    Allocator recalculator

    The 4CP allocator in ALLOC!D27:H27 links to last year's load research tab. It was carried forward from the prior case model. The recalculator rebuilds it from this year's load research, smart meter (AMI) readings from a sample of 1,840 premises. The four summer peaks are 3,402, 3,561, 3,594 and 3,395 MW, an average of 3,488 MW. Residential accounts for 1,608.0 MW of that. So the residential share is 46.10%, where the model uses 46.80%.

    It uses the study's own method and flags the source. Method questions go to the manager.

  5. 05Correct in model

    $3.10M moves from residential to commercial

    Senior cost of service analyst

    The analyst selects Correct in model, and the bands re-flow. Residential falls to $645.5M. Small commercial gains $0.97M and large commercial gains $2.13M. The correction goes into v15, a new draft made from v14. The original v14 is kept as built, for the record.

    “Corrected in v15 · $3.10M moved from residential to commercial”

  6. 06F2 · the cell

    A subtotal that stops one row short

    Formula auditor

    FUNC!J215 reads =SUM(J210:J213). Row 214 holds account 368.5, for transformers in new subdivisions. Someone inserted it below the range in v12. So $1,418,600 of distribution demand cost reaches no class. The cell's history shows how it happened. The sum was right with four rows in v11. Row 214 was added in v12 and was still left out in v14. The fix is one click, extending the range to J214.

    It proposes the fix and does not change a formula itself. Each finding names its cell and its effect.

  7. 07Three formula errors

    The study ties to Schedule C-2, to the dollar

    Senior cost of service analyst

    The analyst corrects F2, F3 and F4 together. The range is extended. Account 593 is linked back to the ledger's $18,962,300. Street lighting comes out of the distribution demand pool. Then the red line turns green, and the class totals count up to their new values. Four of the seven findings are now decided.

    “Ties to the revenue requirement · the model allocates $1,284,600,000, to the dollar of Schedule C-2”

  8. 08Class results

    What each class pays against what it causes

    Rate design specialist

    With the fixes in, the class results update. They show each class's revenue-to-cost ratio, its parity index and the increase it needs to reach cost. The parity index compares what a class pays with what it costs to serve. Residential's is 0.964, so homes pay a little less than their cost. A typical home using 850 kWh pays $128.40 a month now. At cost it would pay $143.94, which is $0.54 less than v14 showed. A million dollars moved between classes changes home bills, and someone has to explain that. The rate designer moves classes toward parity in steps, during rate design.

  9. 09F7 · explained

    Industrial up 13.7%, and why

    Prior-case comparer

    Against the approved prior study, the system is up 9.6% and industrial is up 13.7%. That is 4.1 points above the system. Small commercial and lighting also moved more than 2 points, and both are already explained. For industrial, the comparer ties each driver to the test-year ledger. One is a generating unit retired before the test year (+$9.10M). Another is two data-center customers that joined in the test year (+$6.40M). Growth in transmission 12CP, the twelve monthly peaks, added $4.60M. Distribution and customer costs added $2.67M.

    “No cell is wrong. The move goes in the testimony.”

  10. 10Signed · 09:28

    The manager decides the judgment call and signs v15

    Cost of service manager

    F5 is a method choice. In the model, the industrial meter weight is typed as 1.0, but this year's meter cost study puts it at 14.6. The prior study used 1.0 by agreement with the ratepayer advocate, so it is the manager's call. The manager accepts the meter cost study weight and accepts F6 and F7. Then the manager signs v15 as the study's witness at 09:28. All five checks are green. The study goes to the director of regulatory affairs for the filing.

    Agents find and propose. A person corrects, and the manager signs.

Who it’s for

Analyst, accountant, rate designer, manager and director on one study

The same study, seen by the five people who build, tie out, price, sign and file it. Here is what their case looked like before, and what it looks like now.

Senior cost of service analyst
Owns the 38-tab electric model
Before
Builds each case's model from the last one and ties out a few totals by hand, never sure that every link came across.
Now
Runs one review on each new version and sees each finding on the flow, with its cell and source. Corrects it in a new version with one click.
Cost of service manager
Decides each fix and signs as witness
Before
Reviews and signs the study, then defends it on the stand, cross-examined on each cell. Wants to find any error first.
Now
Decides each fix and each method choice with the source beside it. Signs a version that ties to the revenue requirement to the dollar.
Regulatory accountant
Owns the revenue requirement schedules
Before
Locks Schedule C-2 and waits to hear if the study matches it. Knows staff will ask why if it does not tie to the dollar.
Now
Sees the tie-out by function against the schedule and the test-year ledger. Each gap opens to the cell that causes it.
Rate design specialist
Turns class costs into tariffs and bill impacts
Before
Designs rates on class costs that may still move. A million dollars moved between classes is a change in home bills to explain.
Now
Works from class results that update with each accepted fix, with parity by class and typical monthly bills at cost.
Director of regulatory affairs
Approves the filing
Before
Approves a filing whose errors may be found in discovery. An errata filing costs a round of discovery and the utility's credibility.
Now
Receives a signed study with each finding closed, plus a review note with cell references, ready for discovery.
The agents

The agents that map, audit and rebuild the cost of service study

Six agents map the model, trace each formula and rebuild each allocator. The cost of service manager decides and signs.

Model mapper

Reads the workbook and maps each link from cost account to function, allocator and customer class. Draws the allocation flow. Compares each new version with the last one and lists the tabs and formulas that changed.

  • Never edits the model
  • Reports each cell it could not resolve
Formula auditor

Traces each formula back to the cells it uses. Flags subtotals that skip rows with values, numbers typed where the row links elsewhere and references to last year's tabs or files. Also flags a formula that differs from the rest of its row, and any amount that reaches a class by two paths.

  • Proposes the fix and never changes a formula
  • Each finding names its cell and its effect
Allocator recalculator

Rebuilds each allocator from its named source. Peaks come from load research, both at the system's peak hour and at each class's own peak. Energy comes from billing plus losses. Customer and bill counts come from billing, and weights from the meter and service cost studies. Reports any share that differs by more than the tolerance, and the dollars it moves by class.

  • Uses the study's own method and never chooses a different one
  • Method questions go to the manager
Revenue requirement reconciler

Ties each function to the revenue requirement schedules and the general ledger, and explains any gap cell by cell.

  • Never changes the revenue requirement
  • Ties to the dollar or explains why not
Prior-case comparer

Compares class results with the approved prior case. Explains each class move beyond the threshold with its drivers, each one matched to the ledger.

  • Never calls a variance an error without a cell
Review note writer

Drafts the review note and errata log with cell references and the dollars each correction moves, ready for discovery.

  • Never files
  • The manager signs
Cost of service manager

Decides and signs.

Ask in plain words

Questions on an allocator, a class move or the tie-out

Ask about any cell, allocator, class or tie-out, or ask for the review note to be drafted. Each answer points to its source. These answers use the sample data.

Why does the residential share fall?

The production demand allocator in v14 still reads last year's load research, which gives residential 46.80%. Rebuilt from this summer's four peaks, the share is 46.10%. Those peaks average 3,488 MW, with residential at 1,608.0 MW. On a $442.9M pool, that moves $3.10M from residential to small commercial (+$0.97M) and large commercial (+$2.13M).

Does the study tie to the revenue requirement?

Not yet. The model allocates $1,283,249,500, which is $1,350,500 short of Schedule C-2. Three cells explain all of it. Row 214 is left out of the transformer subtotal (−$1,418,600). Account 593 is typed over its ledger link (−$542,300). Street lighting is counted twice (+$610,400).

Which classes moved most against the prior case?

Against the approved prior study, the system is up 9.6%. Industrial is up 13.7%, which is 4.1 points above the system. The two biggest drivers are a generating unit's retirement (+$9.1M) and two data-center customers (+$6.4M).

Draft the review note for the manager

It is drafted on the sign-off page. It lists seven items, each with its cell, its source and the dollars its correction moves. The tie-out to Schedule C-2 is there too. Open items are marked, and the manager decides them before signing.

The screens

The allocation flow, the tie-out and the class results

From the working solution, on its sample data. Pick one to see it large.

The allocation flowThe study as a flow from cost accounts to customer classes. Seven findings are flagged where they happen, and the gap to the revenue requirement shows at the top.
A new model versionv14 as built, 24 days to filing: class totals, the last review done by hand and the six agents ready to run.
Tie-out to the revenue requirementA waterfall from Schedule C-2 to what the model allocates, and the tie-out by function against the schedule and the test-year ledger.
An allocator rebuilt from sourceThe 4CP allocator still reads last year's load research. Here it is rebuilt from this summer's peaks, with the shares and dollars moved by class.
Corrected in v15The bands re-flow as $3.10M moves from residential to small and large commercial, and v14 is kept as built.
The cellThe workbook grid, the formula bar, the row the subtotal leaves out, the cell's history by version and its trace to the ledger.
Tied to the dollarThree formula errors are corrected. The model now allocates exactly the $1,284,600,000 of Schedule C-2.
FindingsEach finding with its cell, kind, what it moves, which agent found it and its status, by severity against the materiality threshold.
AllocatorsAll 14 allocators, the source the model uses beside the source each was rebuilt from, the largest gap and the class shares.
Class resultsCost of service, present revenue, revenue-to-cost ratio and parity index by class, and typical monthly bills at cost.
Year over yearClass cost against the approved prior study, and each move beyond 2 points explained with its drivers.
Sign-offThe five checks, the signatures from analyst to manager to director, the review note with cell references and the activity trail.
Review settingsMateriality and tolerances, allocator sources, the prior case, the checks and the people who prepare, sign and approve.
Governance

Signed versions and cited findings in cost of service study review

Each finding cites its cellEach finding names its cell, the source data the cell should read and the dollars it moves by class. For an allocator, that is the range and the load research it should link to. For a subtotal, it is the cell and the row it leaves out. A typed value shows the value and its ledger account.
The reviewed version is keptCorrections are written to a new model version, v15. The reviewed v14 is kept unchanged, as built. So the record shows exactly what was reviewed and what changed.
The manager decides and signsNothing changes in the model until a person accepts it. Method choices, such as meter weights, peaks and classification, are the cost of service manager's decision. The manager signs each version as the study's witness.
Ties to the dollar before signingSign-off waits on five checks. Each finding must be decided, and the study must tie to the revenue requirement. Each allocator must match its source. Year-over-year moves must be explained, and v14 must be kept as built.
Agents do not fileThe agents find and propose. They do not edit the workbook, change the revenue requirement, choose an allocation method or file. The director approves the filing.
People and agents on one activity trailEach upload, review run, correction and signature is recorded with its time. A rejection is recorded with its reason. The trail shows who accepted what, and why. A rejected finding stays in the review note, with the reason.
Configuration

Materiality, allocator tolerance and tie-out rules for the study review

Thresholds, allocator sources, the prior case and the checks are all settings. The cost of service team chooses them.

SettingDefaultChoose from
Materiality per finding$50,000Set in $10,000 steps, from $10,000 to $250,000. Below it, a finding is Low.
Year-over-year explanation2 points1 point · 2 points · 3 points · 5 points of class change against the system change
Allocator tolerance0.05 points0.01 points · 0.05 points · 0.10 points of share before a flag
ReconciliationTo the dollarTo the dollar · within $1,000 · within $10,000 of the revenue requirement
Load researchLR_2026 · Jun to Sep 2026LR_2026 · Jun to Sep 2026 · LR_2026 · 12 months
Customer countsTest year 2026Test year 2026 · Year-end 2026 · from the billing system, average of 13 months
Meter and service costsMeter cost study 2026Meter cost study 2026 · Meter cost study 2022
Prior caseE-2023-0112 · approved v22E-2023-0112 · approved v22 · E-2020-0287 · approved v31 · compared on every run
Connections

Workbooks, load research, ledger and cost studies the review reads

Cost of service workbooksthe class cost of service model, xlsx or xlsm, each version
Load researchAMI sample data, coincident and non-coincident peaks by class
General ledger and revenue requirementtest-year ledger by account and the revenue requirement schedules
Billing determinantsenergy, customer counts, bills issued and revenue at present rates
Cost studiesmeter, service and lamp-level cost studies, the transformer register
Prior case modelsapproved models, orders and settlements from earlier dockets
What it changes

Formulas traced and allocators rebuilt: cost of service study review results

Each figure carries its label: a target the solution is built to, an estimate, a typical published result, or a proven one.

target
100%
of formulas and allocators checked in full before filing
Each formula
each allocator rebuilt
typical
$4.6M
of class cost put on the wrong class in one study, found by commission staff after filing
Found by staffafter filing
With agentsbefore filing
target
2days
to review a 400,000-formula study, down from about 3 weeks
By hand≈ 3 weeks
With agents2 days

“Demo” means seen in the working solution, on its sample utility data. “Target” is the design goal, measured in the live solution. “Estimated” is our estimate for a full review of a 400,000-formula electric study. “Typical” means published figures. Missouri Public Service Commission staff testimony describes a change of about $4.6M in a class cost of service. Panko's field audits of spreadsheets, summarized by Pryor, found 0.38 to 2.5% of formula cells in error. They found a significant error in 80 to 90% of audited spreadsheets. For context, Kentucky Public Service Commission case 2016-00371 saw corrected studies filed after a spreadsheet error. See also the NARUC Electric Utility Cost Allocation Manual (1992) and the AWWA M1 base-extra capacity method. Names on the screens are sample data.

Questions

Cost of service study review questions from rate and regulatory teams

What is a cost of service study review?

It is a check of a utility's class cost of service model before the model is filed. The check confirms that each formula is right and each allocator matches its source data. It also confirms that the study allocates exactly the revenue requirement. Cost of Service Study Review does this with six agents. They trace every formula, rebuild every allocator and tie the model to the revenue requirement. The cost of service manager decides each fix and signs.

How does cost of service study review software find errors in the model?

First, the model mapper maps each link from cost account to customer class. Then the formula auditor checks each formula for ranges that stop short, values typed over links, stale references, inconsistent formulas and double counts. The allocator recalculator rebuilds each allocator from load research, billing and cost studies. Last, the reconciler ties each function to the revenue requirement schedules and the ledger.

Does it check every formula, or a sample?

Every formula. In the sample study, the review traced all 412,880 formulas and rebuilt all 14 allocators in one run of 4 min 06 s. It put each of the seven findings on the flow, with its cell, its source and the dollars it moves.

Does it choose the allocation method for us?

No. The allocator recalculator uses the method in your study and flags the source. It does not pick a different method. Method choices such as meter weights, peaks and classification go to the cost of service manager as a judgment finding. The industrial meter weight in the sample case is one example.

Does it work for water cost of service studies?

Yes. The same review runs on water studies built on the base-extra capacity method. That method splits cost between average use and the extra capacity needed on peak days and hours. The review also checks the max-day and max-hour factors from the demand study.

Can the agents change the workbook or the revenue requirement?

No. The agents do not edit the workbook, change the revenue requirement or file. Nothing changes until a person accepts it. Corrections go to a new version, and the reviewed one is kept. The manager signs as the study's witness, and the director approves the filing.

Can we set our own thresholds and sources?

Yes. The materiality per finding, the year-over-year threshold and the allocator tolerance are settings. So is how closely the study must tie to the revenue requirement. The load research, customer counts, meter cost study and prior case are settings too, and so are the checks and the signers.

What do you need from us for a first review?

We need your cost of service model, its source data, your review checklist and a prior case. The Agentic Solution Engine builds and deploys the solution from those requirements and documents. It goes live once each quality gate has passed. We will first walk you through it on a copy of your own last filed study.

Try cost of service study review
on a copy of your last filed model.

We'll run Cost of Service Study Review on a copy of your last filed model and its source data.