CMMS Data Build demo
New plants reach first gas with tags, reasoned maintenance plans and spares already loaded, built for the readiness lead from the contractor’s handover. 1:24
What the demo shows
Loads a new asset’s tags, strategies and spares into the CMMS from EPC handover data.
Agents check each contractor batch, build tags and the plant tree, attach a reason to each plan they can defend, write task lists from manuals, find spare lists and check lead times, send gaps back and reconcile each load. A person proposes, a second person signs, and a third releases each wave.
Transcript
- CMMS Data Build loads a new plant's data into the maintenance system for readiness teams.
- Gas enters in 24 days, and maintenance procedures must be in place before it does.
- The day one board asks, can we maintain this on day one?
- The seal gas skids light is out.
- The agent finds the list on page 412 of a data book.
- Two insurance spares land 143 days after first gas.
- Mateo proposes the list.
- Naledi, the maintenance manager, opens the page and signs.
- She raises a startup risk, and Hiroshi acknowledges it.
- Why this strategy catches a bundle pull on a core with no bundle.
- A live load needs an open sample, a signature, and a separate release.
- Result, Way 105 is live, 1.19 million lines every line accounted for.
- Built on Botminds: agents, data, screens and governance on one platform.
Transcribed from the film’s narration. Captions are on the player.