Run each client project's call, minutes, open items and Friday report
- Minutes read and items placed for them
- Slack computed for each milestone
- A report drafted and challenged first
CDMO project management for drug-substance client projects: agents read the weekly call minutes line by line, place each open item on the side that owes the next move under the milestone it blocks, and compute the slack before a date moves. A change said on a call goes to its owner as a request, and the weekly status report is tested from the client's side before two people sign it.
See one client project's week, call to Friday report ↓Each client project runs on a weekly call, minutes typed the same evening, a tracker kept in a spreadsheet and a status report rebuilt by hand every Friday. What the client owes and what the plant owes sit in the same list, so a reference standard the client promised weeks ago looks like one more overdue line on the plant's side.
A sentence said on the call, such as agreeing to run validation at a larger batch size in a bigger reactor, lands in the minutes as a decision. The process owner has not assessed it, and the client has not asked for it in writing. Friday's report calls the protocol on track because nobody worked out that the slack before it is already gone.
Built forClient project managersMSAT leadsAccount directorsHeads of client project management
Client and plant items share one tracker, and a change said on a call enters the minutes as agreed.
Kept by hand every week
Built-in controls
The client sees each week what waits on it, and a late answer is caught while the date can still be saved.
A drug substance moving to commercial readiness: the project manager runs the week, the MSAT lead assesses a change said on the call, and the account director approves and sends the report.
demoEvery name, project, date and quantity on these screens is invented for the sample.
Who buys and runs client projects at a contract manufacturer.
Run each client project's call, minutes, open items and Friday report
Assess each process change said on a call before anyone agrees
Approve and send the weekly report and own commercial items
Oversee every client project and approve learned rules and settings
The standard it waits on was asked forty days ago; the protocol holds only if it arrives by Friday of next week.
No batch near that size had been made, and the quality agreement needs the client's written approval first.
A promise that the standard should ship next week was recorded as no date given, and the chaser asked for one.
The report said none had arrived; the account director opened the order book and confirmed it before approving.
Seven agents read, place, rehearse, chase, draft and challenge; people sign what leaves the company.
Extracts each decision, action and question from filed minutes and opened email, with speaker, line and confidence.
Checks decisions against the quality agreement's change list and the batch records, and files changes as requests for their owner.
Places each item on the side that owes it under the milestone it blocks, with its age and the slack.
Plays options forward with assumptions the project manager can edit.
Drafts one structured request per client item on its clock and reads replies only as fields and attachments.
Drafts the weekly report with what waits on the client first, each line from an item or a record.
Reads the report the way the client's external manufacturing lead would, testing each on track against the slack.
Around the one project: the portfolio, the agents and their rules, the trail and the settings.
demoSample data, from the working solution.
CDMO project management is running a client's program at a contract manufacturer: the weekly call, minutes, open actions on both sides, milestones and the status report. Here agents read the minutes, place each item on the side that owes it and draft the report, and people approve what is sent.
Because a late answer from the client and a late task at the plant need different actions. Shown on one list, the client's delay reads as the plant's, and nobody asks the client in writing while the date can still be saved.
If it touches the process, equipment, a specification, a filing or the agreement, it is filed as a request for its owner, never as a decision. The quality agreement and ICH Q7 ask for the client's approval before such changes are made.
A challenger reads the draft from the client's chair and tests each on track against the slack. The project manager fixes what it finds and marks the report prepared, and the account director approves and sends it.
Its own project only: the items it owes with what closes each, the milestones and the signed weekly report. Agent drafts stay out of the portal until a person sends them, and the client answers in fixed fields.
It reads the minutes, email a person has filed and the plant's own records, and works beside the schedule. What it adds is the side each item sits on, the slack before each milestone and a report tested before it is sent.
Client products reach PPQ sooner, with every gap closed by evidence.
1-min demoQuality Agreement ManagementNo client hears of an event late, because each client’s stricter clock wins over the plant’s own procedure.
1-min demoClient Change NotificationClients hear about a change before it is made, so improvements go live on schedule.
1-min demoSend the minutes, the tracker and the schedule; we place each item on its side and draft Friday's report.