Turn an approved root cause into accepted actions with owners and dates
- Actions proposed on the ladder from the evidence
- Challenger points before QA sees the plan
- Options compared by strength and exposure
A CAPA plan built from the approved root cause, with each action placed by the strength of its control, checked on every similar machine and signed by the review board.
See one CAPA plan built from root cause to board ↓After an investigation approves its root cause, the CAPA owner starts from the action the investigator proposed, and the easiest one to type is retraining the operators. Nobody checks, action by action, which cause each one fixes or how strong a control it is, so a cause left with no action stays invisible until it recurs.
The plan also stops at the machine that failed, so the same weakness on a sister machine at another plant waits for its own deviation. The effectiveness check comes months later, at closure, and counts quiet batches.
Built forCAPA ownersQA CAPA coordinatorsCAPA review boardsSite quality leads
CAPA owners copy the investigator's proposed action, so a system cause gets retraining and the failure comes back.
Read by hand for each plan
Built-in controls
Each CAPA fixes the system where its cause lives, and every similar machine is covered before it can fail the same way.
The CAPA owner, the QA coordinator, the review board and the site quality leads work one plan on them: a granulator torque excursion traced to a software change and a worn seal.
demoThe plants, clients, people, CAPA numbers and figures on these screens are sample data.
All four work the same ladder, each on its own step.
Turn an approved root cause into accepted actions with owners and dates
Check each plan against its evidence before it reaches the board
Approve major and critical plans with two signatures
Accept or dispute the actions extended to their plant
Each agent hands its work on to another agent or to the person who decides.
Reads the approved root causes and maps each proposed action to the cause it fixes, showing the open rungs.
Plays the inspector: runs the retraining test, flags criteria blind to the cause and missing extensions or client notices, and attacks the agents' own drafts.
Proposes actions on the ladder from the evidence, each with its strength and effort.
Compares sister equipment across the plants on software version, recipe alarm limits, seal run hours and failure mode.
Writes a measurable effectiveness criterion for each action, read from a named system such as the historian, the CMMS or the learning system.
Drafts the change control and the client notices from the approved plan.
Learns from QA and board rulings and offers each one as a proposed rule.
The investigation proposed retraining for an alarm limit a software update had widened to 380 N·m; operators cannot react to an alarm that never sounds.
The draft took the manual's general 500 h, above the 410 h at which this seal failed; the revision raises a work order at 300 h and inspects at 200 h.
A tally of repeat deviations only counts excursions someone noticed; the rewritten criterion reads torque from the historian over 30 batches.
demoSample data, from the working solution.
The CAPAs in design, the records each citation opens and the rules past rulings became.
demoSample data, from the working solution.
A CAPA plan is the set of corrective and preventive actions written once an investigation approves its root cause, each with an owner, a due date and a test of success. Here agents place each action by the strength of its control and tie it to the cause it fixes, and the CAPA review board signs.
Only once process, procedural and system causes have been ruled out, which the first chapter of EU GMP asks before human error is named. The challenger blocks a retraining-only plan for a system cause; QA can keep one for a genuine skill gap, with the reason recorded.
The ladder blends the action hierarchy used in root cause work with the hierarchy of controls, from retraining up to removing the hazard. Each company names its rungs and the lowest rung a system cause may rest on.
Yes. The GMP rule on investigations covers any other batch or product the failure may involve, and the extension checker gives the plan that reach across sister equipment before approval. Each site quality lead accepts or disputes what lands on their plant.
At plan time. The criterion writer drafts a measurable criterion for each action, read from a named system, and the board approves it with the plan.
Each client whose product the plan touches, within the window its quality agreement sets. The change drafter writes the notice from the approved plan; the QA CAPA coordinator opens and sends it only after the board approves.
The plan starts only once the investigation approves its root cause. Each action is tied to the cause it fixes, a cause with no action shows red before anyone submits, and retraining alone cannot go to QA against a software, equipment or procedure cause.
No CAPA quietly drifts past its date: every slip is justified, signed and seen.
1-min demoCAPA Effectiveness CheckEvery CAPA verdict an inspector can follow, from the locked criterion to the batch record.
1-min demoCAPA Closure ReviewA CAPA closes only when what it promised is true in the document, the system and the people who use them.
1-min demoSend one approved investigation with its proposed CAPA, historian trends and work orders, and the agents will draft its plan on the ladder for your board to judge.