Own the daily review and tier messages, and decide first extensions
- Overdue work tiered before the meeting
- Messages drafted with their sources
- Client notices that wait for their read
A CAPA tracking system that draws each action's promised dates as a line, places overdue work on its tier by working days, and reads every extension request before a named person signs it.
See one second extension judged, tiered and signed ↓Each week the coordinator exports the overdue report from the QMS, chases owners by email and carries the worst of it to the monthly quality review. An owner who cannot make the date files a request with a typed reason and a new date. Someone signs it, the record shows the new date, and the old one survives only in the history.
Nobody sees that the same action has now slipped twice, that the line keeps running without the fix, or that the client's quality agreement asked to be told. Late work climbs by habit: an email when it looks bad, a line in the council deck. At inspection the investigator asks for the CAPA log, counts the extensions, and the site rebuilds why each one was granted.
Built forQA CAPA coordinatorsCAPA action ownersDepartment headsSite QA heads
A CAPA date moves on a typed reason, and a second slip can run with nothing in place to protect the product.
Kept apart, joined by hand
Built-in controls
Each slip becomes a signed decision with the product protected meanwhile, and the client hears of it as its agreement asks.
One action, a glove test before every isolator campaign, asks for its second extension; the coordinator, the engineering manager and the QA head take it to a signed decision.
demoSample data: every person, action and record, and the isolator itself.
Owners ask, coordinators decide first extensions, department heads endorse second ones and site QA heads decide them.
Own the daily review and tier messages, and decide first extensions
Deliver the action, ask for extensions and attach the evidence
Endorse or decline second extensions in their department
Decide second extensions and set the interim control the product needs
Around the slip chart: the action list, what each owner still owes, the council's agenda, rules learned from rulings, and what the client sees.
demoSample data, from the working solution.
A signature is accepted only from the person it names, and only after the record behind it was opened.
Sources are manufacturing and quality systems alone; free text from an owner or the client never changes a date or a count.
CAPA tracking follows each corrective and preventive action from approval to closure against the date its owner promised. Here each open action is a line of its promised dates, overdue work is placed on its tier by working days, and each extension request is read before a named person signs it.
Against the action's risk, its history, the production schedule and the attachments. The extension reader says what is missing, such as an interim control while product keeps running, and the challenger asks what an inspector would.
Overdue work rises by working days past its date: the owner first, then the department head, then the site quality council, and at the top the company's head of quality. The thresholds are settings: tightening takes effect immediately, while loosening waits for a second person's signature.
The protection in place until the corrective action is live. On a second extension of Grade A work, the site QA head approves only with an interim control that goes beyond what the rule already requires, and it is tracked as a task of its own.
Where its quality agreement asks. The client notice writer drafts the new date, the reason and the interim control for that client's products only, and the coordinator reads it to the end before sending it to the client's portal.
No. They read, count, draft and challenge. The coordinator sends each message, the department head endorses, the site QA head decides, and nobody decides their own request.
In working days past the date the owner promised, with every earlier promise kept in view. An action's line steps up only at a signed extension, so a second slip shows as a second step, and the working days past the current date set its escalation tier.
Every CAPA verdict an inspector can follow, from the locked criterion to the batch record.
1-min demoCAPA Closure ReviewA CAPA closes only when what it promised is true in the document, the system and the people who use them.
1-min demoDeviation Investigation Report ReviewReports that clients and inspectors accept the first time, with every claim tied to its record.
1-min demoSend one CAPA with its extension history and the schedule behind it, and we will show where its line stepped and what should have protected the product.