- Before
- Adjusts standing orders in spreadsheets and checks vault, truck and cutoff limits by hand before 3:00 p.m.
- Now
- Opens each route already sized and checked, reads why each machine changed, and sends the rest.
Friday's armored-carrier run for one route, sized, checked and approved
A Thursday at the bank. The cash operations analyst prepares Friday's run for one route: the carrier's truck leaves the hub vault at 6:30 a.m. with 24 stops, 22 ATMs and 2 branch vaults, next visit Tuesday. The weekend has SSI paid Friday, Halloween Saturday and Social Security Tuesday. Here is what happens next, screen by screen, in the working solution.
A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.
- 01Thursday morning
Friday's routes, riskiest first, before the 3:00 p.m. cutoff
Cash operations analystThe analyst's region has 6 routes and 131 stops for Friday. One route needs a retry after the carrier portal timed out at 10:21 a.m.; this route is ready with 4 exceptions; two routes are already with the manager and one is approved, its file sent. The agents' briefing since 6:00 a.m.: Friday's 6 routes carry $9.62 million against $12.38 million of standing orders, the hospital ATM would run out Sunday at 3:00 p.m., and the Challenger questioned 7 forecasts.
One button prepares the route.
- 02The route
The whole run in one sentence, each figure cited
Forecast agent, Challenger agent, Limits agentThe agents propose $1,840,000 for the route, $770,000 less than the standing order of $2,610,000. The Forecast agent puts demand to Tuesday at $1.62 million, 18% above last week. The Challenger questioned 2 machines. The Limits agent notes that on the standing order the route would need a second truck, $1,150, and one branch vault would sit at 99% of its limit.
“It fits one truck under the carrier's $2.5 million limit, and the hub vault stays at or under $3.18 million this week, inside its $3.5 million insurance limit.”
- 03One line per stop
Each change from the standing order, with its reason
Load plannerEach ATM and branch vault sits on one line in stop order: cash now, days of cash against Tuesday's visit, the proposed load by denomination, the standing order and the change. A drive-up ATM gets $82,000 instead of $120,000: it returned $41,800 unused on average over its last 6 visits. The branch vault gets $96,000 in six denominations instead of $180,000, because its tellers need $88,000 in $1s to $50s and the vault already holds $412,000, mostly $100s.
- 04The hospital ATM
The hospital ATM that would run dry on Sunday
Cash operations analystThe ATM in a hospital lobby has $31,260 and 1.2 days of cash. The analyst opens its line in place: on the $80,000 standing order the curve hits zero Sunday at 3:00 p.m.; the agents' $120,000, all in twenties, reaches the Tuesday 7:40 a.m. visit. An analyst who disagrees changes the load with a reason, and the Load planner and Limits agent recheck it.
“Hospital payday moved to Wednesdays; on the standing order it runs out Sun 3:00 p.m.”
- 05Why $106,000
The drivers add up to the forecast
Forecast agent and Challenger agentSame four days over the last 8 weeks: $76,600. The hospital's payday, moved to every other Wednesday, adds $16,400; SSI on Friday $5,300; Halloween $6,100; Social Security on Tuesday $1,600. The Challenger found the payday after two Wednesday misses: $13,900 forecast against $20,700 actual on the payday two weeks before, and $14,200 against $21,860 on the latest one, the day before. $120,000 leaves $14,000 at the visit, above the $12,000 safety stock.
- 066:00 to 10:30 a.m.
How the route was built, step by step
The agentsTen steps, each with its agent's version, sources and confidence. The Challenger found 20 of 22 machines within 15% of yesterday's forecast and left one machine's overnight spike, $48,800, out of demand with a referral to Fraud Operations. One ATM is out of service, so the crew loads it only if it is repaired. Another, installed last month, has a confidence of 64%, under the 70% threshold, so a person must confirm its load.
The referral's outcome is not shown in the solution.
- 07The limits
Each vault through the week, beyond a single number
Limits agentThe hub vault peaks at $3.18 million on Thursday and holds $3.13 million on Monday after the Federal Reserve order, against its $3.5 million insurance limit; sized for standing orders it would reach $3.78 million. Monday's $2,300,000 Federal Reserve order, 95 bundles of $20s and 4 of $100s, does not cross-ship: the fit $20s went in earlier this week, on Tuesday, and the order falls in a new business week.
- 0810:42 a.m. · 10:52 a.m.
The analyst sends it; the manager approves with one button
Analyst and managerThe analyst sends the route to the cash operations manager, with the exceptions and the analyst's changes summarized. The manager opens the same route and approves $1,840,000 for 24 stops after one check line: one truck, the hub vault at or under $3.18 million, each ATM under $200,000, the file before the cutoff. Had the manager changed a load, the approval would have gone to the Head of Cash Operations instead.
“The Federal Reserve order for Monday stays a separate approval.”
- 09Accepted
Only then does the carrier order file go
Order file agentWith both approvals in, the Order file agent sends the order file to the carrier and the carrier portal accepts it: 24 stops, one line per machine by denomination, the out-of-service ATM marked to load only if in service. It drafts Friday's cash-in-transit entry for the general ledger. No card or account data is in the file, and it is kept five years.
- 10On the record
Each forecast, change and approval, for the examiner
Internal auditThe trail shows the manager's approval with the 4 exceptions reviewed, the analyst's send, the 10:30 a.m. refresh, the excluded overnight spike and the accepted file, people and agents side by side. Internal audit filters and searches it, and exports an audit pack for an examiner with redaction and a checksum.
“Records are append-only.”