WorkflowMaintenance & Engineering

Airworthiness Directive Compliance Tracking

Airworthiness directive tracking that shows why every tail is in or out, and proves every line of the AD status report

See one case, screen by screen ↓
Watch with transcript →

Built forAirworthiness engineersMaintenance plannersTechnical records teamsDirectors of quality

The Problem Today

Engineers decide tail by tail in spreadsheets whether each directive applies, and the proof sits in paper and scans.

$75K
top FAA civil penalty per violation, and each flight counts published
44
flights flown past one directive; the FAA sought $400K, 2024 published

Worked out by hand, per tail

  • Directive
  • Bulletin
  • Parts
  • Task cards
  • Due points worked by handCycles, hours and calendar, whichever comes first
  • Report rebuilt for each auditThe AD status report the FAA expects, retyped

The Solution

  1. The directive read and quotedWhat is unsafe, what to do and by when, with the bulletin it cites
  2. The fleet sieved by paragraphModel, part number and earlier work, each test quoting its paragraph
  3. Checked a second time, blindA second agent re-runs the call; a credit without its sheet is refused
  4. The engineer approvesWith a reason code; each tail then gets a due point and a slot

Built-in controls

  • Each in or out quotes its paragraph
  • The director of quality signs the status report
  • A chained audit trail for the FAA inspector

What You Get

AD work is planned into a slot ahead of each due point, and an audit is answered from a live, signed status report.

0.9 days
of working time per new directive, down from 6 by hand our estimate
  • Proof checked as work returnsEach signed task card matched to the directive's words
  • Engineers decide the hard callsUncertain calls come to the engineer with the record
  • What-ifs answered on the spotSuch as replacing each part now instead of inspecting
In short

What is Airworthiness Directive Compliance Tracking?

Airworthiness Directive Compliance Tracking is airworthiness directive tracking software for airlines that goes past a due list: seven agents read each new AD and its service bulletin, decide which tails it applies to with the paragraph and record behind each in and out, plan each due point into a slot and prove compliance from signed work. The AD engineer signs the applicability call, and the AD status report stays current per tail.

How to choose AI for airlines: a buyer's guide to agentic AI solutions →

Updated

The problem

Tail by tail in a spreadsheet: where airworthiness directive tracking begins

Airworthiness directive tracking begins with a rule: an AD is issued under 14 CFR Part 39, and no one may operate an aircraft that does not meet an applicable AD. Each new one sends an AD engineer into the directive and the service bulletin it incorporates, to work out tail by tail whether it applies (model and line number, installed part numbers by position, modification status, credit for earlier work) and to turn "within 50 flight cycles after the effective date" or "before accumulating 8,000 total flight cycles" into a due point per tail. That call lives in spreadsheets and in engineers' heads; the M&E system only holds a due list after someone has typed it in.

Then technical records must prove, per tail, that the work was done the way the AD says: the right bulletin revision, each step signed, the result sheets, the parts and the inspector's stamp. A carrier must keep the current status of each applicable AD, with its method of compliance and the next due for a recurring action (14 CFR 121.380), yet the AD status report is rebuilt by hand for each audit. An acquired airline's records arrive as scans in another format, and a credit for earlier work is only as good as the page that proves it. Part 39 compliance is judged tail by tail, and the FAA counts each flight.

typical$75,000maximum civil penalty per violation for a carrier, and the FAA counts each flight
typical44flightsflown out of compliance with one AD, and a $400,000 penalty proposed (FAA, July 2024)
Where one new AD's working days goestimated
By hand6 days
With the solution0.9 days
  • Reading the AD and the bulletin it incorporates1 → 0.1 d
  • The applicability call, tail by tail1.5 → 0.2 d
  • Due points in cycles, hours and calendar, and slots1 → 0.1 d
  • Method of compliance and the engineering order0.5 → 0.2 d
  • Proving compliance from signed task cards1 → 0.2 d
  • Rebuilding the AD status report for an audit1 → 0.1 d

Estimated split for one structural AD on a single-type fleet of about 60 aircraft, by hand and with the solution.

How it works

Directive tracking from the AD feed to a signed status report line

What comes in
Sources inFAA · EASA · ADs, bulletins, configuration, cycles, signed work
Agents at work
AD watch agentfinds every new AD
AD reader agentparagraphs + bulletin
Then
Applicability agentthe fleet sieve
Check agentrecomputes blind
Then
Planner agentdue point to slot
Then
Proof agentchecks signed work
Report agentlive status report
A person decides
AD engineersigns the applicability call with a reason code
What comes out
Applicability per tail, quoted
Slots before every due point
Signed AD status report
One case, step by step

A 737-8 slat track AD, sieved tail by tail and proven from signed work

A morning at the airline's main base. The airline flies 300 aircraft, and a new AD on cracking at the forward end of the slat main tracks on 737-8 airplanes, effective on publication, needs an AD engineer's signature today. Here is what happens next, screen by screen, in the working solution.

A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.

  1. 0107:40

    A morning briefing, and a question in plain words

    AD engineer (structures)

    The engineer's Today screen shows 3 new ADs this week, 1 call waiting, 4 tails due within 50 cycles and 9 recurring inspections in 30 days. The applicability agent's briefing says one AD needs a signature: 14 of 62 tails apply, four inside 50 cycles, and the check agent agrees after one correction. The engineer asks whether the nearest tail is legal to fly tonight.

    Applicability agent: “Yes. It has 41 cycles left on the slat track AD and no other AD item open past due; its status report shows 74 applicable ADs, all within limits.”

  2. 02Two days earlier, 06:02

    The AD found, read and quoted with its bulletin

    AD watch agent and AD reader agent

    The watch agent found the AD in the Federal Register and fetched the alert requirements bulletin it incorporates; it filtered out a second AD because the fleet has no 737-7s. The reader agent extracted paragraphs (a) to (l) and Parts 1 to 3 of the bulletin, and wrote the plain summary with 9 quotes: what is unsafe, what to do, by when ((g)(1) within 50 cycles for airplanes at 7,500 cycles or more, (g)(2) before 8,000 cycles for the rest, repeat every 1,500) and what ends it, replacing all eight tracks with the -9 part.

    The AD reader agent quotes each compliance time it states.

  3. 03The sieve

    The fleet falls through the AD's own paragraphs

    Applicability agent

    Each applicability paragraph becomes a sieve, quoted in the AD's words. ¶(c) takes 300 aircraft to 62 737-8s; ¶(c)(1), line numbers 7212 through 8460, stops 24; ¶(c)(2), a slat main track ending -3 or -5 installed at slats 2 to 5, stops 16 that already carry -9 tracks; ¶(k), credit for an inspection under the earlier alert bulletin, stops 8 that still get the 1,500-cycle repeat. Fourteen come through, ordered by cycles left: thirteen on the first pass, and one more after the check agent refused a credit.

  4. 04One click

    One tail out, and the call left to the engineer

    AD engineer

    Any tail opens to show why it is in or out. One tail stopped at ¶(c)(2): seven tracks are -9, but slat 3L carries a -7 from an earlier repair, a dash number the AD does not list. The agent's confidence is 0.71, below the 0.85 threshold, so it does not decide. It suggests moving the tail in until the part is checked on the aircraft, and the engineer can move it in with a reason.

    The applicability agent does not decide a tail below confidence 0.85, or remove a tail without a record.

  5. 05The evening before

    A second agent recomputes blind and refuses one credit

    Check agent and report agent

    The check agent recomputed the call from the raw records without seeing the first answer. It agreed on 61 of 62 tails and refused the ¶(k) credit for a tail from the acquired airline: the scanned pack has 6 pages and the task card refers to a result sheet on page 7. Under rule R4 there is no credit without it, so the tail moved into the ones that apply, due at 8,000 cycles with 3,380 left. The report agent drafted the records request, and an AMOC request under ¶(l)(3) for another tail's repaired slat 4R track.

    Check agent: “Without it there is no credit (rule R4); the tail is due at 8,000 cycles anyway, with 3,380 left, so nothing is at risk while we look.”

  6. 06Asked in the thread

    “What if we replace every track with -9 now?”

    Planner agent

    The engineer weighs the terminating action against repeat inspections. The planner agent answers in the thread: replacement ends the repeats but takes 46 labor hours per airplane, and stores at the base hold 12 tracks, enough for one and a half airplanes. It proposes the -9 replacement on the three tails with C-checks already planned, and the inspection for the rest.

  7. 07Signed

    The applicability call, approved with a reason code

    AD engineer

    Approving takes a reason code (A1 call confirmed as proposed, A2 confirmed with a tail moved in, A3 confirmed with a tail moved out, or X1 send back to the agents), an optional note for the record, and the engineer's e-signature. The engineer signs A1: 14 of 62 737-8s apply and 48 are out, each with the paragraph and the record that stopped it.

    “I approve the applicability call for this AD.” The e-signature carries the engineer's name, role and the time.

  8. 08Tonight at the base

    A due point per tail, and a slot that beats it

    Planner agent and maintenance planner

    The nearest tail has 7,977 of 8,018 cycles and flies 4.6 a day, so it reaches its limit before its next overnight at the base with a hangar, which is two days too late. The planner agent proposes tonight, 22:30 to 04:30: 6.5 labor hours, with the HFEC kit and two Level II technicians free. The plan shows 4 tails inside 50 cycles, 3 to replace with -9, 209.5 labor hours and the engineering order. The planner accepts the slot and the work package goes to the night shift.

    The planner agent does not book a slot or order parts; the planner accepts.

  9. 0902:10

    Signed work comes back and is checked against the AD

    Proof agent and technical records

    Line maintenance signs the work order: 8 of 8 tracks at slats 2 to 5 inspected, no cracks, the HFEC result sheet attached, the inspector's stamp at 7,981 cycles. The proof agent checks method, bulletin revision, steps, results and stamp against ¶(g)(1) and proposes closure. Technical records confirms compliance, and the next inspection is set at 9,481 cycles.

    The proof agent does not close an item with a missing page or edit a record.

  10. 10The next version

    The AD status report is current, line by line

    Report agent and director of quality

    The report agent regenerated the AD status report: the slat track AD added to 14 tails, the inspected tail complied, repeat at 9,481 cycles. That tail's report lists each applicable AD with its amendment, method of compliance, date complied and next action due, each line linked to its evidence. The new version waits for the director of quality's signature, and the report exports as a PDF or CSV for the FAA inspector.

    The report agent does not sign or send anything to the FAA.

Who it’s for

The engineer, planner, records specialist and quality director on one AD

Four people carry one directive: what each did by hand, and what each does now.

Airworthiness directive engineer
Signs the applicability call
Before
Reads each new AD and its bulletin, then decides tail by tail in a spreadsheet. Signs the call, so needs to see why each tail is in or out, with the paragraph.
Now
Opens a sieve built from the AD's own paragraphs, with the record and confidence behind each tail, decides the one call below 0.85 and signs with a reason code.
Maintenance planner
Accepts each slot
Before
Fits AD work into overnights and checks without grounding a jet, and needs the due point in cycles and the slot that beats it.
Now
Gets each tail's due point in cycles, hours and calendar with the limiting one marked, and a proposed slot with labor, tooling and technicians checked, to accept or change.
Technical records specialist
Confirms each closure
Before
Checks signed task cards and chases missing pages from the acquired airline's archive. A task card without the eddy current sheet is not compliance.
Now
Sees each signed work order already checked for method, revision, steps, results, parts and stamp, confirms or rejects it with a reason, and sends records requests already drafted.
Director of quality
Signs the status report and each AMOC
Before
Answers to the principal maintenance inspector, and needs the record behind any tail the inspector asks about.
Now
Signs a versioned AD status report in which each line links to its evidence, and signs AMOC requests the report agent has drafted with the facts and the proposed method.
The agents

Airworthiness directive agents that watch, read, sieve, check, plan and prove

Each AD is read, the fleet sieved through its paragraphs and compliance proven from signed work, with a blind recheck of every call; the AD engineer signs.

AD watch agent

Watches the FAA's AD feed and the Federal Register every 30 minutes, EASA ADs daily and emergency ADs the moment they are sent; fetches the bulletins an AD incorporates and filters by type certificate.

  • Never discards an AD for a fleet type without logging why
AD reader agent

Reads the AD and its bulletins and extracts applicability, actions, compliance times, credit, terminating action and AMOC terms, paragraph by paragraph; writes the plain summary with quotes.

  • Never paraphrases a compliance time without the quote
Applicability agent

Builds a sieve from each applicability paragraph and runs the fleet through it with configuration, installed part numbers, modification status and work history, giving a confidence per tail.

  • Never decides a tail below confidence 0.85
  • Never removes a tail without a record
Check agent

Recomputes applicability, credit and due points from the raw records without seeing the first answer; any difference blocks the call until a person settles it.

  • Never sees the first answer before it finishes
  • Any difference blocks the call
Planner agent

Turns compliance times into cycles, hours and dates per tail at live utilization, finds the slot that beats each due point, checks labor, tooling and parts, and drafts the engineering order.

  • Never books a slot or orders parts; the planner accepts
Proof agent

Reads signed task cards that cite an AD; checks the method, bulletin revision, each step, results, parts and the inspector's stamp; proposes closure and sets the next repeat.

  • Never closes an item with a missing page
  • Never edits a maintenance record
Report agent

Keeps the 14 CFR 121.380 AD status report per tail live and versioned, and drafts AMOC requests, records requests and comments on proposed rules.

  • Never signs or sends anything to the FAA
AD engineer

Signs every call; the planner accepts slots; records confirm proof; the Director of Quality signs the report.

Ask in plain words

Plain questions about an AD, a tail or a task card, answered with the record

The agents sit beside each screen. Ask a question or tell them what to do; answers cite their source, and nothing is approved, sent or booked until a person says so. These answers use the sample data.

Why is this tail out?

¶(c)(2) covers tracks -3 and -5. This tail's slat 3L carries a -7 from an earlier repair; the other seven are -9. The -7 is not listed, so the sieve stops it, but at 0.71 confidence, so the call is yours.

Why tonight for the nearest tail, and not its next overnight?

At 4.6 cycles a day it reaches its 8,018-cycle limit before its next overnight at the base with a hangar, which is two days too late. Tonight it arrives at 21:48 and leaves at 06:15, so the 6.5-hour job fits.

Why not close that work order? The work was done.

The task card follows Revision 01 of the service bulletin; the AD requires Revision 02, which changed the step 9 torque. Work done to the wrong revision is not compliance. The aircraft still has 2,300 flight hours before its due point, so the outstation can re-do step 9 at the next overnight.

Does a repaired track change anything?

Yes. ¶(l) says a repaired slat main track needs an approved AMOC before the (g) time. One tail has a blend-repaired track at slat 4R; the report agent drafted the AMOC request for the director of quality.

The screens

Sieve, compliance plan and status report screens for one AD

From the working solution, on its sample data. Pick one to see it large.

Today, with the agents' briefingThe AD engineer's morning: new ADs, calls waiting, tails due within 50 cycles and recurring inspections, with the agents answering whether a tail is legal to fly tonight.
The AD readerThe airworthiness directive with paragraph markers and highlighted applicability text, beside the requirements extracted paragraph by paragraph from the AD and its service bulletin.
The AD applicability sieveThe AD in plain words (what is unsafe, what to do, by when, what ends it) and the fleet's tails falling through each quoted applicability paragraph, with the agents' thread beside it.
Why a tail is in or outOne tail's applicability: the paragraph that stopped it, the installed part number, the agent's confidence below the threshold, and Move in for the engineer.
Asking the agentsThe tails that apply ordered by cycles left, with due dates and proposed slots, and the planner agent's answer on replacing all tracks to end the recurring inspections.
Approving the applicability callReason codes A1, A2, A3 and X1, a note for the record and the AD engineer's e-signature on the applicability call.
The call signedThe signed applicability call, the planner's accepted slot for tonight and the other slots sent to the maintenance planner.
The compliance planDue points per tail in cycles, hours and calendar, the method of compliance, the proposed slot with labor and tooling, and the engineering order.
Proof of complianceA signed work order checked against the AD (method, bulletin revision, steps, results and inspector's stamp), confirmed by technical records, with the next recurring inspection due set.
The AD status reportThe 14 CFR 121.380 AD status report for one tail: each AD with its amendment, method of compliance, date complied, next action due and evidence link.
Exceptions: AMOCs and records gapsAn AMOC request drafted for a repaired part, a records gap in an acquired airline's scan, an engine AD revision and a disagreement between agents, each with the person who decides.
The audit trailThe audit trail filtered to people's decisions: the applicability call, the accepted slot, the signed work and the records confirmation, each with its reason code, chained entry to entry and exportable for the FAA.
Rules and thresholdsThe confidence threshold, due-soon alerts, blind recomputation, result-sheet credit, four eyes on moving a tail out and status report re-signing.
Governance

Airworthiness directive tracking with quotes, blind checks and signatures

Each in and out is quotedEach sieve quotes the AD paragraph it comes from, and each tail it stops shows the record and the reason. Any value an agent states links to its source: the AD paragraph, the bulletin page, the configuration record, the work order or the scanned page.
Two answers must agreeThe check agent recomputes each applicability call blind from the raw records. Any difference blocks the signature until a person settles it with a record (rule R1), and moving a tail out also needs a second engineer (rule R6).
A named person signs each stepThe AD engineer signs the applicability call, the maintenance planner accepts each slot, technical records confirms each closure, and the Director of Quality signs the status report and each AMOC request, all with a reason code and an e-signature.
Uncertain calls come to the engineerBelow confidence 0.85 the applicability agent asks the engineer instead of deciding, and a credit for earlier work needs the result sheet; the task card alone is not enough (rule R4).
What the agents may not doThey do not approve applicability, move a tail out without a record and a person, book slots, order parts, close an item with a missing page, edit a maintenance record, or sign or send anything to the FAA.
A chained audit trailEach agent step and each person's decision is recorded newest first, each entry chained to the one before it so nothing can be changed unseen, and the trail exports for the FAA.
Configuration

Continuing airworthiness rules: blind checks, confidence and credit

The rules each AD is checked against are settings. Changes are proposed and need the Director of Quality's approval with a reason code.

SettingDefaultChoose from
R1 · The check agent must agree before a call can be signedOnOn · Off
R2 · Confidence below which the engineer decides0.85A number you set; confidence is scored per tail, per AD
R3 · Due-soon alert50 cycles · 100 hours · 14 days, whichever firstCycles, hours and days set separately
R4 · Credit for previous actions needs the result sheetOnOn · Off
R5 · Re-sign the status reportAfter any changeAfter any change · Daily · Monthly
R6 · Four eyes on moving a tail outOnOn · Off
Who signs applicability callsAD engineers; powerplant engineers for engine and propeller ADsSet by role; the administrator cannot sign compliance
Connections

The AD feed, M&E system, configuration data and records library it reads

FAA AD feed and Federal Registerfinal rules, emergency ADs and proposed rules, with EASA ADs the FAA adopts
M&E systemwork orders, task cards and engineering orders, written as drafts only
Configuration recordsinstalled part numbers and serials per position, nightly and on change
Flight hours and cycles feedeach leg, from the aircraft and the movement messages
Maintenance planning, stores and toolingovernights, hangar slots, checks, parts on hand, kits and technicians' authorizations
Records libraryscanned records, including an acquired airline's archive
What it changes

Airworthiness directive tracking results across the fleet

Each figure carries its label: a target the solution is built to, an estimate, a typical published result, or a proven one.

target
0
tails flown past an applicable AD, the design goal
41 cycles to spare
one tail inspected on its overnight
typical
$75K
maximum FAA penalty per violation, and every flight counts
44 flights out of compliance$400,000 proposed
With every AD proven$0
target
100%
of AD work planned into overnights and checks, ahead of each due point

“demo” = seen in the working solution, on its sample fleet data · “target” = the design goal, measured in the live solution · “estimated” = our estimate · “typical” = published figures (49 U.S.C. 46301(a)(1), $75,000 per violation, DOT final rule Dec 30, 2024; FAA newsroom, proposed $400,000 penalty for 44 flights out of compliance with an AD, July 2024). Rules named: 14 CFR Part 39 (including 39.19) and 14 CFR 121.380. The directive, its bulletin, the tails and the work orders shown are sample data, not a real AD. Names on the screens are sample data.

Questions

Airworthiness directive tracking questions from maintenance and engineering

What is Airworthiness Directive Compliance Tracking?

Airworthiness Directive Compliance Tracking is airworthiness directive tracking software for airlines that goes past a due list: seven agents read each new AD and its service bulletin, decide which tails it applies to with the paragraph and record behind each in and out, plan each due point into a slot and prove compliance from signed work. The AD engineer signs the applicability call, and the AD status report stays current per tail.

How do you determine whether an AD applies to an aircraft?

The applicability agent turns each applicability paragraph (model and line or serial numbers, installed part numbers, modification status, credit for earlier work) into a sieve and runs the fleet through it with configuration and work history. Each tail stopped shows the quote, the record and a confidence; below 0.85 the engineer decides. A check agent recomputes the call blind, and any difference blocks the signature.

What must an AD status report include under 14 CFR 121.380?

The current status of each applicable AD, including the method of compliance and, for a recurring action, when it is next due. Here the report agent keeps that AD status report per tail, with each line linked to its evidence; it regenerates on each change, is versioned, and the Director of Quality signs it before it is exported as a PDF or CSV.

How are recurring AD inspections tracked?

When technical records confirms a closure, the proof agent sets the next due from the inspection: in the sample, 7,981 cycles plus the 1,500-cycle repeat makes 9,481. All recurring AD actions show on one list by cycles, hours or calendar, ready to bundle into a check.

Can it prepare an alternative method of compliance (AMOC) request?

Yes. When an AD requires an alternative method of compliance (in the sample, a repaired slat track under ¶(l)(3)), the report agent drafts the request under 14 CFR 39.19 with the facts, the repair data and the proposed method. The Director of Quality edits, signs and sends it; the agent does not send to the FAA.

Does it work with records from an airline we acquired?

Its records library indexes scanned records, including an acquired airline's archive. A credit for earlier work is given only with the result sheet, so a missing page becomes a records gap with a drafted request, and the tail stays in the AD until the page is found.

Who signs the applicability call, the slot and the closure?

People do, each with a reason code and e-signature on a chained audit trail. The AD engineer signs the call, the planner accepts slots, records confirms closures and the Director of Quality signs the report. The agents propose, quote and ask; they do not approve applicability, book slots, order parts, close an item with a missing page, edit a record or sign anything.

Can we test it on an AD we have already worked by hand?

Yes. The Agentic Solution Engine builds and deploys it from your requirements and documents (your AD procedures, fleet configuration, M&E system and a sample of past ADs and signed work), and it goes live once every quality gate has passed. We will walk you through it on one of your own recent ADs.

Sieve your own fleet
through one of your recent ADs.

We'll run Airworthiness Directive Compliance Tracking on one of your recent ADs and your own fleet configuration.