- Before
- Reads each new AD and its bulletin, then decides tail by tail in a spreadsheet. Signs the call, so needs to see why each tail is in or out, with the paragraph.
- Now
- Opens a sieve built from the AD's own paragraphs, with the record and confidence behind each tail, decides the one call below 0.85 and signs with a reason code.
A 737-8 slat track AD, sieved tail by tail and proven from signed work
A morning at the airline's main base. The airline flies 300 aircraft, and a new AD on cracking at the forward end of the slat main tracks on 737-8 airplanes, effective on publication, needs an AD engineer's signature today. Here is what happens next, screen by screen, in the working solution.
A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.
- 0107:40
A morning briefing, and a question in plain words
AD engineer (structures)The engineer's Today screen shows 3 new ADs this week, 1 call waiting, 4 tails due within 50 cycles and 9 recurring inspections in 30 days. The applicability agent's briefing says one AD needs a signature: 14 of 62 tails apply, four inside 50 cycles, and the check agent agrees after one correction. The engineer asks whether the nearest tail is legal to fly tonight.
Applicability agent: “Yes. It has 41 cycles left on the slat track AD and no other AD item open past due; its status report shows 74 applicable ADs, all within limits.”
- 02Two days earlier, 06:02
The AD found, read and quoted with its bulletin
AD watch agent and AD reader agentThe watch agent found the AD in the Federal Register and fetched the alert requirements bulletin it incorporates; it filtered out a second AD because the fleet has no 737-7s. The reader agent extracted paragraphs (a) to (l) and Parts 1 to 3 of the bulletin, and wrote the plain summary with 9 quotes: what is unsafe, what to do, by when ((g)(1) within 50 cycles for airplanes at 7,500 cycles or more, (g)(2) before 8,000 cycles for the rest, repeat every 1,500) and what ends it, replacing all eight tracks with the -9 part.
The AD reader agent quotes each compliance time it states.
- 03The sieve
The fleet falls through the AD's own paragraphs
Applicability agentEach applicability paragraph becomes a sieve, quoted in the AD's words. ¶(c) takes 300 aircraft to 62 737-8s; ¶(c)(1), line numbers 7212 through 8460, stops 24; ¶(c)(2), a slat main track ending -3 or -5 installed at slats 2 to 5, stops 16 that already carry -9 tracks; ¶(k), credit for an inspection under the earlier alert bulletin, stops 8 that still get the 1,500-cycle repeat. Fourteen come through, ordered by cycles left: thirteen on the first pass, and one more after the check agent refused a credit.
- 04One click
One tail out, and the call left to the engineer
AD engineerAny tail opens to show why it is in or out. One tail stopped at ¶(c)(2): seven tracks are -9, but slat 3L carries a -7 from an earlier repair, a dash number the AD does not list. The agent's confidence is 0.71, below the 0.85 threshold, so it does not decide. It suggests moving the tail in until the part is checked on the aircraft, and the engineer can move it in with a reason.
The applicability agent does not decide a tail below confidence 0.85, or remove a tail without a record.
- 05The evening before
A second agent recomputes blind and refuses one credit
Check agent and report agentThe check agent recomputed the call from the raw records without seeing the first answer. It agreed on 61 of 62 tails and refused the ¶(k) credit for a tail from the acquired airline: the scanned pack has 6 pages and the task card refers to a result sheet on page 7. Under rule R4 there is no credit without it, so the tail moved into the ones that apply, due at 8,000 cycles with 3,380 left. The report agent drafted the records request, and an AMOC request under ¶(l)(3) for another tail's repaired slat 4R track.
Check agent: “Without it there is no credit (rule R4); the tail is due at 8,000 cycles anyway, with 3,380 left, so nothing is at risk while we look.”
- 06Asked in the thread
“What if we replace every track with -9 now?”
Planner agentThe engineer weighs the terminating action against repeat inspections. The planner agent answers in the thread: replacement ends the repeats but takes 46 labor hours per airplane, and stores at the base hold 12 tracks, enough for one and a half airplanes. It proposes the -9 replacement on the three tails with C-checks already planned, and the inspection for the rest.
- 07Signed
The applicability call, approved with a reason code
AD engineerApproving takes a reason code (A1 call confirmed as proposed, A2 confirmed with a tail moved in, A3 confirmed with a tail moved out, or X1 send back to the agents), an optional note for the record, and the engineer's e-signature. The engineer signs A1: 14 of 62 737-8s apply and 48 are out, each with the paragraph and the record that stopped it.
“I approve the applicability call for this AD.” The e-signature carries the engineer's name, role and the time.
- 08Tonight at the base
A due point per tail, and a slot that beats it
Planner agent and maintenance plannerThe nearest tail has 7,977 of 8,018 cycles and flies 4.6 a day, so it reaches its limit before its next overnight at the base with a hangar, which is two days too late. The planner agent proposes tonight, 22:30 to 04:30: 6.5 labor hours, with the HFEC kit and two Level II technicians free. The plan shows 4 tails inside 50 cycles, 3 to replace with -9, 209.5 labor hours and the engineering order. The planner accepts the slot and the work package goes to the night shift.
The planner agent does not book a slot or order parts; the planner accepts.
- 0902:10
Signed work comes back and is checked against the AD
Proof agent and technical recordsLine maintenance signs the work order: 8 of 8 tracks at slats 2 to 5 inspected, no cracks, the HFEC result sheet attached, the inspector's stamp at 7,981 cycles. The proof agent checks method, bulletin revision, steps, results and stamp against ¶(g)(1) and proposes closure. Technical records confirms compliance, and the next inspection is set at 9,481 cycles.
The proof agent does not close an item with a missing page or edit a record.
- 10The next version
The AD status report is current, line by line
Report agent and director of qualityThe report agent regenerated the AD status report: the slat track AD added to 14 tails, the inspected tail complied, repeat at 9,481 cycles. That tail's report lists each applicable AD with its amendment, method of compliance, date complied and next action due, each line linked to its evidence. The new version waits for the director of quality's signature, and the report exports as a PDF or CSV for the FAA inspector.
The report agent does not sign or send anything to the FAA.