- Sees
- The parcel, each agent’s reading and the passage behind each citation
- Signs
- Prepares the report and sends records requests to the city
Nine screens behind one zoning report, from the parcel to the signature
From the parcel’s district to counsel’s signature: what each screen does, how it works in short points, and the role it serves.
- 01Parcel and zone
District and overlay found from the zoning map, assessor and survey
How it works
- Reads the zoning map sheet, the assessor record and the survey together
- Places parcel 2077-14-3-02-011 wholly in O-2 and the corridor overlay
- Each parcel fact carries its source, from the 4.62 acres to the proposed use
- A split-zoned lot goes to the analyst
Zoning analystStarts every site from a confirmed district and overlay; no more tracing map sheets against assessor pages.
- 02Permits and certificates read
Every permit, variance and open case laid on one timeline
How it works
- Lays 14 permits, 2 variances and 1 enforcement case on one line from 1996
- Puts the amending ordinances on the same line
- Reads it all in 6 min 40 s: 3 min 05 s for the code, 1 min 50 s for permits and variances
- Flags the final inspection of B-21-0884 as not found
Zoning analystReplaces days of pulling city records and working out which ones bear on zoning at all.
- 03The code as of each date
The code rebuilt as of any past date, ordinance by ordinance
How it works
- Seven rules across five dates, from April 1996 to today
- Each changed cell names the ordinance that changed it
- Office parking moves from 1 per 375 sq ft to 1 per 300 sq ft in November 2019
Zoning analystAnswers which version of the code applied when the building was permitted, without a hunt through the ordinance archive.
- 04Ask about this parcel
Questions in plain words, answered with the code then and now
How it works
- Counsel types the question the client would ask
- Quotes the 1996 ratio beside the current one, with the arithmetic: 112 required then, 140 now
- Cites the certificate of occupancy, the parking permit, §17.62.040 and the survey
- Accept into the report, edit, or reject on stated grounds
Land use counselGets a straight answer on the parking and the reason it holds, in place of a third party’s binder weeks later.
- 05Permitted and conditional uses
The use table read for the proposed use, with its approval path
How it works
- Medical office over 10,000 sq ft has been conditional in O-2 since July 1, 2023
- Lists the five criteria the commission weighs: three likely met, two needing evidence
- Drafts the application checklist: 9 items, 6 already in the file
Land use counselTells the client before closing that the clinic needs planning approval, what the commission will weigh, and that the open case must close first.
- 06Conformity, item by item
Every item held against the code today and the code when built
How it works
- Ten items in one table: use, parking, setbacks, sign, height, floor area ratio and landscaping
- Required today, existing and when built, with sources on each row
- 5 conform, 3 legally non-conforming, 1 violation, 1 needs approval
Real estate associateSees the whole site in one view, and which items need counsel, with no table to assemble from a 340-page code.
- 07Conformity item: generator pad
A violation told apart from a feature a variance protects
How it works
- The pad sits 9 ft from the rear line where 25 ft is required
- Variance V-96-12 covers the principal building only
- Open case CE-23-0412 puts the pad on the seller’s cure list, with a cure request drafted
Land use counselKeeps the buyer from inheriting a cure the seller should pay for, by separating what was never lawful from what was.
- 08Right to rebuild
What the building loses if it burns, set out for the lender
How it works
- Quotes the 1996 rule at 60 percent of value beside 50 percent of replacement value today
- Names what a rebuild would need: 140 spaces and a 50 ft front setback
- Keeps counsel’s added note on law-and-ordinance coverage as an edit
Real estate partnerHands the lender a right-to-rebuild answer it can lend on, with the damage threshold and the features a rebuild would not keep.
- 09Zoning report and sign-off
A zoning report built only from accepted answers, signed the same day
How it works
- Each statement cited, from the summary to violations
- 11 pages and 46 citations, all checked by the analyst
- 6 of 6 answers decided: 5 accepted as drafted, 1 edited
- Counsel signs; release is a separate partner’s step
Land use counselSigns a cited report on the day the questions were asked, where a third-party report takes two to three weeks.