Turnaround Work Package Planning demo

Planners get job packs drafted from past packs and standards with every step cited, and stale rigging caught before a crew meets it. 1:25

What the demo shows

Drafts job packs from past packs and standards, each step cited, for turnaround planners.

Agents find the past packs, carry each step across with its source, test it against what has changed since, place lessons on the step they affect, and build isolation, materials, permits and hours. A planner decides every changed step, critical packs are walked in the field, and a lead engineer signs what she has opened.

Transcript

  1. Turnaround Work Package Planning drafts job packs from past packs for turnaround planners.
  2. One turnaround needs 3,126 packs and copies carry-old methods.
  3. From three past packs, 38 steps, 31 kept, 5 changed, 2 stale.
  4. Click apart, and its steps light up.
  5. Step 2.9 lifts from a pad blocked by a 2024 pipe rack.
  6. The 2022 stud lesson cost 11 hours, so tensioners go in.
  7. Istvan reads each proposed change in its source, then accepts it.
  8. When all seven are decided, he sent the pack to a field walk.
  9. Soraya must walk the job and record what she finds.
  10. Until she does, nobody can sign the pack.
  11. Nobody signs their own work.
  12. Every decision is audited.
  13. Only 7 of 38 steps needed a person.
  14. Across the turnaround, 1,118 packs are issued.
  15. Built on Botminds: agents, data, screens, and governance on one platform.

Transcribed from the film’s narration. Captions are on the player.