Turnaround Schedule Health Check demo

Schedulers see the turnaround schedule tested against job packs, blind lists, material dates and the crane plan, with each collision pinned. 1:24

What the demo shows

Checks a turnaround schedule’s logic against scope, packs and permits, for schedulers.

Agents read the schedule file and cross-check it against job packs, the blind list, purchase orders, kept scope, the crane plan and permit rules. Each disagreement lands as a pin with cited sources and a proposed fix. The scheduler decides, the execution lead countersigns, and the tool never edits the schedule.

Transcript

  1. Turnaround Schedule Health Check tests a schedule against the real world for schedulers.
  2. This schedule passes its network checks.
  3. A 5% limit lets 932 activities go untied.
  4. The math cannot see job packs or blind lists.
  5. The agents can. 411 pins land, 9 on the critical path.
  6. On day 11, the E-2417A bundle pull starts before blind B.
  7. 24-0187 is in.
  8. Mkechi, the scheduler, ties the job to the blind walk.
  9. 31 crane hours move off the peak.
  10. Float falls from 52 hours to 22.
  11. She decides. The tool never edits the schedule.
  12. Hamish, the execution lead, opens every source and countersigns.
  13. 411 collisions the math could not see.
  14. Two people on every fix.
  15. Built on Botminds: agents, data, screens, and governance on one platform.

Transcribed from the film’s narration. Captions are on the player.