Turnaround readiness review that reads every work product each night, sets what was reported beside what is proven, and leaves the rating and the signature to named people.
Follow the twelve-week gate, claim by claim ↓Each week a status report says job packs are ninety-something percent complete, and the line links to nothing. Outside reviews come a few times per event and look at a slice of the work.
So the gaps surface in week one. One pack called complete has an isolation list older than a plant change. A material line shows the date the buyer asked for, while the supplier’s letter promises a later one. Somewhere a letter of intent gets reported as a signed contract. The gate passed in a meeting, and the record of who agreed is thin.
Built forReadiness coordinatorsTurnaround managersRefinery managers, as sponsorsIndependent reviewersInternal auditors
Readiness is a percent someone typed into a status report, so the real gaps show up in week one.
Reported by hand today
Built-in controls
Each gate is rated on what the work proves, and the biggest gaps have owners while there is still time to close them.
Fourteen units come down in twelve weeks for 38 days. At this gate the team’s own rating is green. The agents read every job pack, supplier letter, blind list and contract overnight.
demoPlant, people and gate counts here are invented sample data.
Each workstream is two dots on a rail: what the team reported and what the agents could prove. Job packs read 96% claimed and 81% proven. Blinds and isolation sit lowest at 78% proven. The gate lines give amber while the team rated itself green, and the gate milestones run along the top to oil out.
The reactor effluent exchanger’s job pack is reported complete. Its isolation list is dated last turnaround but was carried over unchanged from the one before. It lists 6 blinds and does not show the warm-up bypass added later under a plant change, which needs a seventh. Its other proof rules pass, though the tensioner kits it relies on are flagged to land late.
Materials were reported 94% ready. Read against supplier documents rather than the dates asked for in the ERP, 83% are proven. Each late line shows its planned start and the supplier’s date as two dots, and the agent proposes ways out, such as a second supplier or air freight, for a person to choose.
The tensioner kits for the exchanger’s channel cover studs have a supplier letter on file. It confirms delivery three days after the job’s planned start, because the supplier’s test bench is booked. The ERP still shows the date the buyer asked for. The material date checker quotes the letter and marks the line late.
Any gap can be answered with evidence. The contracts lead sent a signed contract for a scaffold lot that was a letter of intent. The reply reader finds both signatures and the rate schedule, and says the lot counts. Nothing moves until the coordinator accepts. Leads who sent no reply in the window keep their gap.
The coordinator proposed amber. The turnaround manager decides it: proven is below the gate line. He then assigns the four biggest gaps to their workstream leads, each with a proof date: job packs, blinds and isolation, materials and contracts. Permit plans for rescue and fire watch go to the safety lead by rule.
Signing waits until the sponsor opens the gate pack. Beside it is a record of who agreed to what: who proposed the rating, who decided it, who owns each gap. She signs at amber. The pack is frozen as signed, and anything that changes after the signature is listed separately and counts toward the next gate.
The planning lead opens the gap he now owns. Each pack reported complete but not proven is listed with its reason. Most often the isolation list misses a plant change, or there is no QA/QC plan for this turnaround. Others have materials not tied to reservations, old steps, a missing sign-off, or a file that would not open.
The blind list lead sees the same view for isolation. A blind point counts when it sits on a current marked-up drawing, its size, rating and gasket agree with the line list, and any look-alike flange nearby is told apart. Each row says which of those fails, so field crews know where to walk first.
Reported against proven, as the gate shows them.
| Workstream | Reported | Proven | Not proven |
|---|---|---|---|
| Job packs | 3,001 of 3,126 | 2,532 | 469 packs |
| Blinds and isolation | 3,076 of 3,418 | 2,666 | 410 blind points |
| Materials | 6,824 of 7,260 | 6,026 | 798 lines |
| Contracts | 35 of 38 | 31 | 4 letters of intent |
demoSample data, from the working solution.
Five more screens the coordinator, the manager and auditors open around the gate.
demoSample data, from the working solution.
Ratings, owners and signatures belong to named people.
Each one hands its findings to a workstream lead or the coordinator.
Records each workstream’s claim and its report line.
Opens each job pack and tests every proof rule.
Takes supplier dates and compares them with planned starts.
Compares blind points with marked-up drawings, the line list and plant changes.
Looks for two signatures and a rate schedule, and reads contractor plans.
Traces scope, schedule, cost, permits and inspection to proof.
Tests the team’s evidence against the same rule.
Writes the gate pack and works out what the lines say.
A turnaround readiness review checks, at set gates before oil out, whether planning is far enough along to execute. Here agents read every job pack, supplier letter, blind list and contract each night and set what was reported beside what the work proves. The coordinator proposes a rating, the turnaround manager decides it, and the sponsor signs.
A checklist records that someone ticked an item. Here an item counts only when a work product proves it, and each gap names what is missing and who owns it.
Yes. Any gap can be answered with evidence. The reply reader tests it against the same rule, and the coordinator accepts or rejects it with a reason.
Gates sit on the same rail as your milestones, from strategy and team through scope freeze to final go. Each gate has its own items, and a gate closes only when the sponsor signs.
No. An independent reviewer can still spot check what the agents call proven and record an opinion beside the decision. The difference is that the whole set of work products is read every night, between those visits.
The early gates cover strategy, scope and long-lead orders, so the same claimed-against-proven view applies months before execution, while gaps are still cheap to close.
Forgotten deferrals found, and none left standing without a new signature.
1-min demoTurnaround Emergent Work ManagementField findings sorted, cited and decided within the shift.
1-min demoBlind List VerificationIsolation boundaries tested on the current drawing before anyone touches a bolt.
1-min demoWe’ll set each percent beside what the job packs, letters and contracts prove.