Transformer DGA Interpretation demo
Catch incipient transformer faults from the oil. 1:15
What the demo shows
A workflow solution for transformer engineers that interprets DGA results and flags faults.
Six agents read every lab report and monitor alarm the day it arrives, run five interpretation methods side by side, plot the sample on the Duval triangle as a path through the transformer's own history, and set the advice by how fast the gas is rising; the condition engineer signs and the maintenance manager approves any load cap or outage.
Transcript
- Transformer DGA Interpretation reads every oil test and flags faults early.
- Today, lab PDFs get filed, methods disagree, and experts are scarce.
- Saltmarsh Road, T2's new report is in.
- Nadia asks the agents to read it.
- Agents extract the gases, run five methods, and check the history.
- For two years, the path crept through T1.
- Now it enters T2, a thermal fault.
- Ethylene nearly doubled since T2 took its sister unit's load.
- Methods disagree on temperature.
- The rising ethylene ratio settles it.
- The change is fast, so the advice is firm.
- Wrist sample in seven days capped the load.
- Nadia signs, Omar approves the cap, and a lab is told.
- Built on Botminds: agents, data, screens, and governance on one platform.
Transcribed from the film’s narration. Captions are on the player.