Tarmac Delay Compliance demo
Watches ground holds against the 3- and 4-hour limits and files DOT reports, for ops control 1:34
What the demo shows
Watches ground holds against the 3- and 4-hour limits and files DOT reports, for ops control
Tarmac Watch runs every aircraft's clock from a cited start time and predicts takeoff and breach from the deice queue and ATC programs. On a surface diagram of the airport, each aircraft sits in a ring that closes toward its limit, and the Return Planner says when a return must start and which gate it can have. The duty manager approves the return; agents draft the captain's ACARS and the station message for the duty manager to send, log food and water and announcements from the cabin crew, and after any long delay draft the DOT report and an evidence pack that a second agent reconciles before a compliance analyst certifies it.
Transcript
- Tarmac Delay Compliance watches every aircraft holding passengers for operations control.
- By law, passengers can leave within 3 hours for on international flights.
- One airline paid $4.1 million for 43 flights held too long.
- Snow at O'Hare, Corvay 9-02 to Boston, out 2 hours 10.
- Boston has a ground stop.
- The agent predicts takeoff 43 minutes past the limit.
- It's line, gate B14 frees at 1520, start back by 1540.
- Teresa, the duty manager, approves with a reason.
- Agents draft the captain's and station's messages.
- She sends both, and the captain turns back.
- Food and water at two hours was already logged.
- After a long delay, a checker agent reconciles every time.
- The DOT report is drafted that day.
- Every value cited, every decision signed, every step logged.
- The door opens at 2 hours 39.
- None of the eight aircraft went past the limit.
- Built on bot mines, agents, data, screens, and governance on one platform.
Transcribed from the film’s narration. Captions are on the player.