Storage Tank Inspection Management demo
Terminal engineers see each tank’s next due date reworked from its own readings, with the sum shown, so no date moves later on a hunch. 1:24
What the demo shows
Tracks tank inspection intervals, findings and repairs with records for terminal engineers.
Agents read old reports, rework each date from the readings, check each signer's certificate on the signing day and shade the terminal's plot plan by how far each date can be trusted. The engineer moves a date, the terminal manager countersigns and states what she opened, and no button moves a date later.
Transcript
- Storage Tank Inspection Management tracks intervals, findings, and repairs for terminal engineers.
- By hand, these reports take about 1,395 hours, so nobody checks.
- Agents rebuild each date from readings and shade every tank by how far to trust it.
- T. 126 shows 2031 in the register.
- Its 2022 floor leaves 0.148-inch, losing 0.012 a year against a 0.10 minimum.
- That is four years, 2026 now.
- And his certificate ended five weeks before he signed.
- The engineer moves T.
- 126 up. No button moves it later.
- The terminal manager opens each page herself.
- Floor table. 2012 reading.
- Signature. Certificate. She rules how it runs until it's opened and countersigns.
- Her signature states what she opened.
- The ruling reaches the register.
- 56 looked too late.
- Now it is 55.
- Built on Botminds.
- Agents. Data. Screens and governance. on one platform.
Transcribed from the film’s narration. Captions are on the player.