- Before
- Reads every defense and industry agreement by hand, hunting for the one publication clause before the PI orders anything.
- Now
- Opens a board where the clause, the camera and the people are already sorted and cited, and spends her day deciding and signing.
One defense subcontract, through research export control review to a signed plan
Project AWD-26-1147, "Vision-based navigation for small uncrewed aircraft without GPS": a $1,184,000, 24-month subcontract from Corvane Aerospace Systems under a Department of Defense prime contract, starting Monday, November 2. Here is Wednesday, October 21, screen by screen, in the working solution.
- 01Overnight
Every new award read before the office opens
Intake agentAt 11:52 p.m. the Intake agent read 14 new awards: sponsor, terms, keywords, purchases and people. Thirteen are inside fundamental research, each with its reason, for a spot check. One goes to deep review: a defense subcontract with a publication clause and a controlled camera.
One export violation can cost up to $374,474.
- 0211:53 p.m.
The clause that loses the exclusion, found in 31 pages
Clause agentThe Clause agent found three clauses. Clause 14.3 makes every release wait for Corvane's written approval, a flow-down of DFARS 252.204-7000, so the exclusion is lost. Clause 9.4 is a notice only, and clause 22.1 is not triggered because the statement of work says no covered defense information will be furnished.
"No information resulting from the Work shall be released, published or presented by Subcontractor without the prior written approval of Corvane."
- 039:14 a.m.
The exclusion board: inside fundamental research, or controlled
Lenora Vasquez-Hart · Export Control OfficerOne vertical line splits the board. Six items sit inside, including the ODI-9 IMU (7A994), the flight controller and six routine lines (EAR99) and the visiting researcher, screened clear. Six are controlled: clause 14.3, the Lumivane TX-640 thermal camera, its service manual, the navigation code, the flight-test data and papers, and the two foreign graduate researchers' lab access. Each shows a one-line reason, a numbered citation and who stands behind it.
- 04One click
The agents show their plan, sources, confidence and hand-off
The agents"Run the agents again" replays the work step by step: the Clause agent at 0.97 on clause 14.3, the Equipment agent at 0.94 on the camera, USML first, the Challenger's check, the Screener and the Access agent on five people and one visitor, then the Drafter. Each item moves to its side as its step finishes, and the work is handed to Lenora.
- 05Two keys
A thermal camera classified from its spec sheet, and argued the other way
Equipment agent and Challenger agentThe TX-640 is matched to ECCN 6A003.b.4.b parameter by parameter: not specially designed for a military end item, an uncooled 640 × 512 microbolometer at 12 µm, and a 60 Hz frame rate, above the 9 Hz line that would make it 6A993.a. The Challenger argued USML Category XII and 6A993.a and agrees. The vendor's quote says the same. Lenora signs at 3:10 p.m.
A disagreement between the two agents is escalated to the officer, never averaged.
- 06Deemed export
What each foreign student would actually receive
Access agentTomas Reyes Aldana and Nadia Haddad, graduate researchers on F-1 status, may operate the camera and work on the results. Operating is not "use" technology, which needs all six of operation, installation, maintenance, repair, overhaul and refurbishing (15 CFR 772.1); the service manual would need a license, so it stays locked. Their citizenship stays masked behind a logged Reveal.
Confidence 0.92: access under the plan, no license needed, manual locked.
- 079:40 a.m.
Replacement wording with precedent, sent by Sponsored Programs
Lenora, then Owen Pradhan · Contracts OfficerLenora proposes the playbook's wording P-2: a 30-day review for comment, with the decision to publish left to the university, accepted by Corvane in two earlier subcontracts. She cannot send it herself. Owen Pradhan sends it to Corvane from the research administration system at 10:02 a.m.
- 082:20 p.m.
The clause comes out, and the research is open
Corvane accepts Amendment 1Lenora records the sponsor's reply and applies it to the board. Clause 14.3, the navigation code and the flight-test data move back across the line: nine items inside, three controlled. The drafted plan drops from six controls to four.
- 095:05 p.m.
A technology control plan written from the controlled side
Drafter, then LenoraTCP-26-061 for Room 2.114 has four controls, each tied to the item that needs it: physical security, information security, personnel, and travel and shipment. Dr. Thornbury and both students acknowledged their plain-words briefings at 4:40 p.m. Lenora signs at 5:05 p.m. No license is needed, so nothing goes to the empowered official.
- 10On the record
Every step in one inquiry pack
Janelle Okoro · Internal AuditThe audit trail runs from the Intake agent's flag at 11:52 p.m. to the plan signed at 5:05 p.m.: who, what, when, why and which evidence, for people and agents. Export inquiry pack builds a redacted binder for a regulator, the sponsor or internal audit, kept five years.