Quality Management Review & Inspection Risk demo
Quality management review that pins each ICH Q10 input where an inspector would meet it, ranks it by inspection risk, and asks leadership to decide. 1:23
What the demo shows
A quality management review solution that builds each site's ICH Q10 pack by inspection risk.
Agents pin each review input on the plant's floor plan where an inspector on the usual route would meet it, link faults that share equipment or cause into one signal, and rank each on a written inspection risk score. A mock inspection walk questions the plant's evidence and the agents' own draft, and the review is drafted in ICH Q10 order with every line opening its record. The chair proposes a decision with an owner and a date for each ranked signal, a second senior quality person agrees after opening the same records, and the plant reviews roll up into the company review.
Transcript
- Quality Management Review and Inspection Risk, for quality heads.
- Seventy-eight percent of FDA drug inspections in fiscal 2025 ended with action indicated.
- Three faults on one brine valve, filed apart, are linked: ninth becomes fifth.
- The challenger asks: did management know? Last quarter accepted the first fault with no action; our draft is fixed too.
- The Plant 5 head opens the records behind the signal, one at a time.
- Each work order counts as read only after it has been open long enough to read.
- He proposes a reliability review of the whole brine loop, and signs.
- The Head of Quality opens the same three records herself.
- Nobody agrees with their own proposal, and every signature carries its meaning.
- She agrees as second person; the review becomes a decision meeting.
- Built on Botminds: agents, data, screens and governance on one platform.
The narration as written for the film. Captions are on the player.