WorkflowData Privacy & AI Governance

Privacy Impact Assessment

DPIA software that drafts from the project's own documents and shows how each risk moves before you sign

See one case, screen by screen ↓
Watch with transcript →

Built forPrivacy officersData protection officersProject ownersSecurity analystsWorks councils

The Problem Today

Project owners get a long privacy questionnaire they cannot answer, and the risks end up scored from memory in a spreadsheet.

€10M
top fine, or 2% of world turnover if higher, under Art. 35, 36 published

Answers chased from four sources

  • Brief
  • Diagram
  • Contract
  • Vendor
  • Data needs rarely challengedAsked if each field is needed, the answer is yes
  • Not reopened on changeThe vendor or design changes, and the file stays shut

The Solution

  1. Screened in minutesNine criteria tested, each with its reason, and the laws that apply named
  2. Answered from the documentsBrief, diagram and vendor contract read, and only the gaps go to the owner
  3. Each risk scored twiceBefore and after controls, and a second agent re-checks each control alone
  4. The privacy officer signsEach control and the residual risk accepted with a reason, then signed

Built-in controls

  • A high residual risk always goes to the DPO
  • Each answer and score cites its passage
  • No one signs what they prepared

What You Get

High-risk projects launch with privacy settled, instead of waiting on it in the final week.

  • Unneeded data fields droppedEach field challenged against the stated purpose
  • High risks brought downOnce the privacy officer accepts the proposed controls
  • Works council briefed plainlyA summary in plain words drafted for employee representatives
In short

What is Privacy Impact Assessment?

Privacy Impact Assessment is DPIA software. It drafts and scores privacy impact assessments and DPIAs for new projects and vendors. Seven agents screen each project. They draft the questionnaire answers from the project's own brief, diagram and contract, with the passage behind each answer. They challenge each data field and score each risk before and after its controls. The privacy officer accepts each control and the remaining risk. The DPO advises, and decides whether the authority must be consulted.

How to choose AI solutions for back-office and enterprise work →

Updated

The problem

Privacy assessments arrive too late to change the project

When a company starts a project that uses personal data in a risky way, the law asks for an assessment first. Under GDPR Article 35 this is a data protection impact assessment, or DPIA. It describes the processing, asks whether each piece of data is really needed, and lists the risks to people and the measures that reduce them. California's risk-assessment regulations and the Colorado and Virginia laws now ask for the same kind of assessment. In most companies the DPIA is a form of 40 to 80 questions. It goes to a project owner who cannot answer it. They forward it to the architect and the vendor, and it comes back partial and without evidence. The privacy officer then rewrites the answers into a description of processing. They score the risks in a spreadsheet, from memory or from an old DPIA.

The answers were in the project's own brief, architecture diagram and vendor contract all along. Nobody had time to read them side by side. So the need for each data field is rarely challenged. When asked if a field is needed, people just say yes. Controls are agreed in meetings but not backed by evidence. Nobody records who accepted which remaining risk. And the DPIA is filed and forgotten, even when the vendor adds a sub-processor or the design adds GPS. A DPIA that arrives after launch changes nothing, and it still costs weeks.

typical€10Mor 2%of worldwide annual turnover, whichever is higher. That is the maximum fine for breaching Articles 35 and 36
typical8 + 6weeksthe most a supervisory authority may take to advise, when high risk remains and the company must consult it
typical2 of 9criteriain most cases mean a DPIA is needed, under the guidelines of the EDPB, the board of EU data protection authorities
Where a DPIA's calendar days goestimated
By hand34 days
With the solution8 days
  • Screening and deciding whether a full DPIA is needed3 → 0.5 d
  • Getting the questionnaire answered by the owner, architect and vendor14 → 2 d
  • Writing the description of processing3 → 0.5 d
  • Scoring the risks and agreeing controls6 → 2 d
  • Checking data needs, and evidence for each control4 → 1 d
  • DPO advice, works council and sign-off4 → 2 d

Our estimate for one full DPIA, from the sample company's 34-day median last year to the 8 days of the sample case.

How it works

Submitted project to signed DPIA, agent by agent

What comes in
Project inProject portal, procurement, documents · brief, diagram, contract
Agents at work
Screening agentthreshold test
Then
Intake agentdrafts answers, cited
Necessity agentkeep, limit, drop
Then
Risk agentbefore and after
Control checkerindependent
Then
Consultation agentDPO and works council
Change watcher
A person decides
Privacy officer and DPOaccept, advise, sign
What comes out
Every answer cited
Risks scored before and after
Signed DPIA
One case, step by step

Eight days to a signed DPIA for a driver fatigue camera in 1,860 trucks

The company's distribution business wants a fatigue camera that faces the driver, from a telematics vendor. It would go in 1,860 trucks driven by 2,340 people in Germany, the Netherlands, Poland and Spain. The pilot is a few weeks away, and go-live a month after it. Here is the DPIA in the working solution, screen by screen.

A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.

  1. 01Day 8, afternoon

    Six things need the privacy officer, and the agents say which first

    Privacy officer

    The privacy officer's home screen opens with a summary. Since yesterday the agents screened 3 new projects and re-checked 9 assessments. Six things need attention, led by the fatigue camera. What the agents found is written in plain sentences with its sources. The risk agent and necessity agent propose dropping the camera's face login. The control checker disputes a blurring control. The screening agent flags palm-scan payments in the canteens.

    “They answer from the assessments and documents, with sources, and act only when you say so.” (the Ask the agents panel)

  2. 02Day 1, 08:31

    A minute after the project is submitted, a full DPIA is called for

    Screening agent

    The project owner submits the fatigue camera through the project portal at 08:30. The screening agent runs the threshold test and finds that 5 of the 9 criteria apply. They are evaluation or scoring, systematic monitoring, sensitive data, vulnerable people (here, employees) and new technology. Biometrics and tracking are also on the authority's list. Each criterion it ticks carries its source. The laws that apply are EU GDPR and, in Germany, the works council's right to co-decide. The privacy officer confirms at 10:14 and the DPIA opens.

    The screening agent recommends. It does not decide “no DPIA” on its own, and each override is recorded with a reason.

  3. 03Day 1, 10:31

    41 of 48 questions answered from the documents

    Intake agent

    The intake agent reads the project brief v1.3, the architecture diagram v0.9 and the vendor's master services agreement and DPA draft, 47 pages in all. It answers 41 of the 48 questions in six sections, each with its source and a confidence score. Where the documents are silent, it asks. That means 5 questions to the project owner and 2 to information security. It also writes the processing description, with 8 operations from recording the cab to recording the road ahead.

    The intake agent does not answer without a source. It leaves a question open rather than guess.

  4. 04One click

    Each answer opens the passage behind it

    Project owner

    Question 14 asks whether special category data, such as biometric data, is processed. The answer is yes, because a face template is stored to identify each driver. It links to the contract, §4.2. There the processor agrees to create a facial template of each driver and store it in its cloud for the term of the agreement. The passage shows who read it: the intake agent on day 1, and the control checker again on day 2. The project owner only confirms or corrects.

    The project owner asked only to be told what was needed, and to confirm it.

  5. 05The risk map

    Each risk drawn twice, before and after

    Risk agent and necessity agent

    The risk agent found 8 risks, 3 high and 5 medium. On the 4 × 4 map, each risk is a ring where it starts and a dot where its controls take it. An arrow joins the two. A move nobody has accepted stays dashed. Pick the operation “Log the driver in by face”, and only the biometric risk stays lit. It is biometric identification, 3 × 4 = 12, high. Beside the map, the risk agent proposes two controls from the company's own library. The necessity agent asks why face login is needed at all, since drivers already badge in at each shift.

    “I propose two controls from our library: edge-only processing with badge login, and deletion of clips after 72 hours. Then the biometric risk is 2 × 3 = 6, medium.” (Risk agent)

  6. 06A question back

    “What if we keep face login?”

    Privacy officer

    The privacy officer asks in plain words before deciding. The risk agent answers with its sources. The biometric risk stays at 3 × 4 = 12, high, even with 72-hour deletion, because the template itself is the risk. A privacy officer cannot accept a high remaining risk. So the DPO, the data protection officer, would have to decide whether to consult the authority. The authority can take 8 weeks, plus 6, which runs past the pilot date.

  7. 07Accepted · A1

    Both controls accepted, and the arrow moves from high to medium

    Privacy officer

    The privacy officer accepts both controls with reason code A1, “Controls adequate and owned”. The dashed arrow turns solid, and the biometric risk moves to 2 × 3 = 6, medium. The control checker had already checked both controls against the contract on its own. Edge-only mode exists, and clip retention can be set from 24 hours to 90 days. The risk agent reports the new picture of 0 high, 1 medium and 7 low. It says what is next: settle the blurring risk, then sign.

    What remains of the biometric risk, in the risk agent's words: the camera still reads drivers' faces to infer fatigue, a health-adjacent state.

  8. 08A disagreement

    A second agent disagrees openly

    Control checker

    The blurring control says faces and number plates in the road camera's clips are blurred before upload. The control checker, which does not see the risk agent's reasoning, read the contract itself. Annex 2 §2.4 says blurring happens only when a clip is downloaded or exported. So it scores the risk at 2 × 1 instead of 1 × 1. The privacy officer keeps the checker's 2 × 1 until the vendor confirms blurring before upload. That confirmation becomes a condition of the sign-off.

    The control checker can block sign-off. It cannot accept a risk.

  9. 09Necessity

    Each data field challenged against the purpose

    Necessity agent

    The purpose is to reduce fatigue-related collisions by alerting drivers and dispatchers. Against it, the necessity agent challenged 12 fields. It proposed to drop 4: the face template, continuous cab video, cab audio and the heart-rate wristband. It proposed to limit 4 and keep 4, each with its reason and source. Accepting the biometric controls decided two of them, so 10 of 12 are decided. The project owner may still contest GPS every second, or the weekly score per driver, with a reason.

  10. 10Day 8, 14:05 · signed

    Residual risk medium, accepted with conditions

    Privacy officer

    The DPO recorded advice under Article 35(2) the day before. The consultation agent's summary in plain words went to the works council chair. The privacy officer accepts the necessity agent's last two proposals. GPS is limited to the event location, and the weekly score to trends. With all five checks done, the privacy officer accepts the remaining risk with reason code RA2, “Accepted with conditions”. The conditions are the transfer impact assessment and penetration test from information security, and the works-council summary. They also include the vendor's written confirmation on blurring. Finally, there is a review in 12 months, or at once on any vendor or design change. The privacy officer types a name to sign, eight days after the project arrived.

    “Recorded with your name, the time and the evidence on the audit trail.”

Who it’s for

Four roles that answer, advise on and sign the DPIA

How the DPIA looked before the agents, and how it looks now, for the privacy officer, the project owner, the DPO and information security.

Privacy officer
Runs the DPIAs and signs them
Before
Has 9 DPIAs in flight and 5 screenings a week. Chases a 48-question form through the project owner, the architect and the vendor. Then scores risks in a spreadsheet and hopes it is signed before go-live.
Now
Opens one map where each risk is drawn before and after, and asks the agents why. Accepts each control with a reason code and signs, with the passage behind each answer in view.
Project owner
Heads fleet safety and owns the project
Before
Gets a questionnaire about Article 35 that cannot be answered from the business side, and forwards it to the architect and the vendor.
Now
Confirms answers already drafted from the project's own brief, diagram and contract, and answers only the 5 questions the documents did not.
Data protection officer
Advises on each DPIA and decides prior consultations
Before
Hears the week before launch that high risk remains, with no pack ready for the authority.
Now
Records the advice in the DPIA itself, and decides any prior consultation with the Article 36(3) pack already drafted and checked.
Information security analyst
Reviews vendor security evidence
Before
Is asked to vouch for encryption and access controls whose evidence lives in email.
Now
Confirms security controls against the vendor's SOC 2 security report. A second agent re-checks each control against the contract.
The agents

The DPIA agents propose and score; only people accept a risk

The agents screen each project, draft its answers, challenge each data field and re-check the controls. The privacy officer signs and the DPO advises.

Screening agent

Runs the threshold test on each new project or vendor within minutes. It checks the nine EDPB criteria, the authority's list and the US state triggers. It gives the reason for each criterion and names the laws that apply.

  • Never decides “no DPIA” alone
  • Records its reasons, and the privacy officer confirms or overrides
Intake agent

Reads the project brief, the architecture diagram and the vendor contract together. Drafts the questionnaire answers, with the passage behind each answer, and writes the description of processing.

  • Never answers without a source
  • Leaves a question open and asks the owner rather than guess
Necessity agent

Challenges each data field against the stated purpose and proposes keep, limit or drop, with its reason and source.

  • Proposes only, and the project owner may contest
  • The privacy officer decides
Risk agent

Finds the risks in each processing operation and scores likelihood × severity with its reasons. Proposes controls from the company's own control library.

  • Never accepts a risk or a control
  • Proposes only controls already in the library
Control checker

Re-checks each control against the evidence, such as contract clauses and the vendor's security report. Re-scores on its own, and says so when it disagrees.

  • No access to the risk agent's reasoning
  • Can block sign-off, but cannot accept
Consultation agent

Drafts the works-council summary in plain words, the DPO advice record and the pack for consulting the authority. Checks the pack against Article 36(3)(a) to (f).

  • Sends nothing without a person
Change watcher

Watches vendor notices, new design documents, scope changes and review dates for each approved DPIA. Proposes reopening only the answers and risks a change touches.

  • Reopens, and never closes
  • Names the answers and risks a change affects
Privacy officer, DPO, project owner

Reason codes, e-signatures.

Ask in plain words

Each DPIA risk score explained by the agents, down to the clause

Ask about any risk, answer or data field, or tell the agents what to draft. Each answer points to the passage it came from. Nothing changes until you accept it.

Why is the biometric risk high instead of medium?

Two things push it up. Severity is 4, because a face template cannot be changed if it leaks, and it identifies the person. Likelihood is 3, because it is stored centrally for the whole contract, for 2,340 drivers. Our matrix calls 9 and above high.

What if we keep face login?

Then the biometric risk stays at 3 × 4 = 12, high, even with 72-hour deletion. The template itself is the risk. A privacy officer cannot accept a high remaining risk. The DPO would have to decide whether to consult the authority, and the authority can take 8 weeks, plus 6, past the pilot date.

What is left before sign-off?

Your decision on the biometric risk, and which score stands for the blurring risk. Then sign. The DPO's advice is recorded. Three conditions will carry into the sign-off. They are the transfer impact assessment and penetration test from information security, and the works-council summary before the pilot.

Draft the works council summary

Done. It is one page in plain words for the works council chair. It says what the camera records, what it will not be used for, how long clips are kept and how a driver contests an alert. It is on the sign-off page, and nothing is sent until you say so.

The screens

The risk map, the second check and the sign-off in the DPIA software

From the working solution, on its sample data. Pick one to see it large.

TodayWhat needs the privacy officer today. It shows what the agents found overnight with sources, a box to ask them, and what is coming due.
ScreeningEach new project and vendor screened against the nine criteria and the authority's list, with the laws that apply and the decision on record.
The questionnaire48 questions in six sections, each answer with its source and confidence. Filter to answers from the documents, the owner's answers or what is still open.
Where an answer came fromThe contract clause behind an answer, highlighted, with the risks it feeds and which agents read it.
Risks, before and afterThe processing description, the likelihood-by-severity map with each risk drawn before and after its controls, and the conversation with the agents.
Asking the agentsA question asked in plain words, answered with its sources, before anything is accepted.
A control acceptedThe arrow moves from high to medium once the privacy officer accepts. The risk agent reports what is left.
The second checkThe control checker's disagreement with the clause it rests on, and the choice of which score stands.
NecessityEach data field challenged against the purpose, to drop, limit or keep. Each has the reason, the source and the owner's right to contest.
Accept and signThe reason code, the conditions that carry into the approval, the typed signature and a record that the DPO's advice was read.
Prior consultationWhy high risk remains, and the pack checked against Article 36(3). It shows the letter to the authority, its clock and the DPO's decision.
What changedA vendor's new sub-processor caught by the change watcher. It shows before and now, the answers and risk it touches, and a choice to reopen or dismiss.
Audit trailEach action by people and agents in order, each entry chained to the one before, and the evidence pack to export.
Governance

Who accepts risk, and what an independent check can block

Each answer and score cites its passageEach answer, risk score, control and agent statement links to the page or clause it came from. That could be the brief, the diagram, the contract, the SOC 2 report or the law. A click opens it.
People accept each control and the residual riskThe project owner confirms answers. The privacy officer accepts each control and the remaining risk with a reason code and a typed e-signature. Information security confirms security controls with evidence.
Residual high always goes to the DPOA privacy officer may accept remaining risk up to medium. A high remaining risk is not accepted quietly. The DPO decides whether to consult the authority, send the project back for redesign, or stop it.
An independent second checkThe control checker re-checks each control against the contract and the vendor's evidence, without seeing the risk agent's reasoning. Its disagreement is shown, and it can block sign-off. A person decides which score stands.
No one signs what they preparedSign-off stays closed while anything is open. The person who prepared a DPIA cannot sign it. No agent signs, accepts a risk, sends anything outside the company or closes a reopened DPIA.
A chained audit trailEach action by people and agents is recorded in order, and each entry is chained to the one before it. The evidence pack exports the DPIA, each answer with its passage, and the decisions and signatures, with a hash.
Configuration

DPIA software settings: risk matrix, acceptance limits and review dates

What the agents may do, who decides and how risk is scored are all settings. Changes are saved as a new version and take effect when the DPO approves them.

SettingDefaultChoose from
High risk from9 on the 4 × 4 matrix8 · 9 · 12
Residual high goes toThe DPO, for a prior-consultation decisionExisting DPIAs keep the matrix they were scored with
Privacy officer may accept residual riskUp to mediumRoles: privacy officer · DPO · project owner · information security · works council · auditor
When a full DPIA is neededTwo or more of the nine criteria, or any item on the authority's listIf the processing matches an approved DPIA, reuse it and record the reason
TemplatesGDPR DPIA (48 questions), UK GDPR DPIA, California risk assessment, Colorado and Virginia data protection assessmentAlso a light privacy review for vendor changes, and an AI impact assessment with the AI Act team
Control library14 controls, each with an owner and the evidence it needsThe risk agent proposes only from this library · add a control
ReviewEvery 12 months, and on any vendor, design or scope changeVendor sub-processor notice: affected DPIAs reopened the same day
Service levelsScreening in 2 business days; owner questions and DPO advice in 5Reminders at 2 and 5 days · go-live within 14 days and unsigned is escalated to the DPO and the business head
Connections

Project portal, procurement and the record of processing behind each DPIA

Project portalnew projects, their briefs and screening requests
Procurement intakenew vendors, contracts and data processing agreements
Document librarybriefs, architecture diagrams, design documents
Record of processingactivities, purposes and retention
Vendor risk registersub-processor notices and security reports
Ticketing, email and chatowner questions, reminders, notifications and approvals
What it changes

Privacy impact assessment results: sign-off before go-live and fields dropped

Each figure carries its label: a target the solution is built to, an estimate, a typical published result, or a proven one.

target
100%
of high-risk launches with a signed DPIA before go-live, the design goal. A missed one can cost up to 2% of turnover
Last year63 of 74
With agentsevery one
demo
4of 12
data fields dropped before launch in the sample case, each field challenged by the necessity agent
4 of 12
fields dropped
target
8days
from start to sign-off, with 41 of 48 answers drafted from the documents, from a 34-day median
Today34 days
With agents8 days

“Demo” means seen in the working solution, on its sample data. “Target” means the design goal, measured in the live solution. “Estimated” means our estimate. “Typical” means published figures. GDPR Art. 83(4)(a) sets fines of up to €10 million or 2% of worldwide annual turnover, whichever is higher. Under GDPR Art. 36(2), the authority advises within eight weeks, and can extend this by six. The WP29/EDPB guidelines WP248 rev.01 say that two of the nine criteria in most cases mean a DPIA. The 34-day median is the sample company's baseline for last year. Names on the screens are sample data.

Questions

DPIA software questions: screening, state laws and prior consultation

What is Privacy Impact Assessment?

Privacy Impact Assessment is DPIA software. It drafts and scores privacy impact assessments and DPIAs for new projects and vendors. Seven agents screen each project. They draft the questionnaire answers from the project's own brief, diagram and contract, with the passage behind each answer. They challenge each data field and score each risk before and after its controls. The privacy officer accepts each control and the remaining risk. The DPO advises, and decides whether the authority must be consulted.

How does it decide whether a project needs a DPIA?

The screening agent tests each new project and vendor against the nine EDPB criteria, the authority's list and the US state triggers. The EDPB is the board of EU data protection authorities. The agent cites the reason for each criterion. Two or more criteria, or any item on the authority's list, means a full DPIA. The privacy officer confirms or overrides with a reason code, so a “no DPIA” decision is documented too.

Can the AI answer the DPIA questionnaire instead of the project owner?

It drafts what the documents answer, and the owner confirms. On the sample DPIA, the intake agent answered 41 of 48 questions from the brief, diagram and vendor contract, each with its passage. It asked the owner and information security the 7 the documents did not cover. It does not answer without a source. High-confidence answers can be confirmed in one step.

Does it handle CPRA risk assessments and US state data protection assessments?

Yes. Templates cover the GDPR and UK GDPR DPIA, the California risk assessment and the Colorado and Virginia data protection assessment. The screening agent names the laws that apply. In the sample, profiling US loyalty members triggers all three state assessments, and one assessment covers them all.

What happens when high risk remains after mitigation?

A privacy officer cannot accept it, so it goes to the DPO. The consultation agent drafts the pack for consulting the authority and checks it against Article 36(3)(a) to (f). It adds the cover letter and the authority's clock of 8 weeks, plus 6. The DPO decides to consult the authority, send the project back for redesign, or stop it, with a reason code.

Does the DPIA stay up to date when the vendor or design changes?

The change watcher follows vendor notices, design documents, scope and review dates for each approved DPIA. When a vendor adds a sub-processor, it names the answers and risks the change touches and proposes reopening only those. The privacy officer reopens them or dismisses the change with a reason.

Can an agent sign the DPIA or accept a risk?

No. The agents propose, explain and cite. They do not sign, accept a risk, send anything outside the company or close a reopened DPIA. The project owner confirms answers. The privacy officer accepts each control and the remaining risk with a reason code and e-signature. An independent checker can block sign-off, and no one signs a DPIA they prepared.

How do we know the agents draft our DPIAs correctly before go-live?

Setup ends with a test on one of your approved DPIAs. The agents re-draft it from its documents, and you compare the answers. Nothing goes live until the test passes and the DPO approves. The Agentic Solution Engine builds and deploys it from your requirements and documents. These are your questionnaire templates, control library, scoring matrix and the systems your projects live in. It goes live once each quality gate has passed.

Re-draft a past DPIA
from its own documents.

We'll run Privacy Impact Assessment on one of your own past DPIAs and the documents behind it.