When a health authority approves a medicine, the approval usually comes with homework: further studies, each with reports and dates attached. The company adds promises of its own, in meetings and in written replies. Post-marketing commitment tracking is the work of keeping every one of those duties on record, with its date and its owner, until the agency confirms it is done.
This guide is for anyone who owns, compiles, signs or pays for that record: regulatory leads, regulatory operations, EU and affiliate regulatory staff, clinical, manufacturing and real-world evidence owners, compliance, and the leaders deciding whether to automate the work. No background needed.
Imagine you are the regulatory lead at Northwind Bio, a mid-size biotech with four marketed medicines. It is Wednesday, October 7, 2026. Your tracker holds 29 open items across four products and eight health authorities. FDA has just approved Veltrimab, your injectable biologic, for Crohn's disease, and its letter adds a new pediatric study, with its study plan (the protocol) due June 30, 2027.
The tracker looks complete. But back on May 20, your manufacturing team, known in regulatory work as CMC, sat in a formal meeting with FDA (a Type C meeting) about a new shipping route for the 200 mg/mL prefilled syringe. FDA's minutes arrived in June and were filed with the ordinary correspondence on June 19. Their action items list two things. The promise your company made (FDA calls you "the sponsor") sits just above them, in the discussion of Question 3.
Type C minutes · action items, p. 2
Item 1
FDA issues final minutes
Item 2
Sponsor files the packaging change
Shipping report
Not listed
Type C minutes · Question 3, p. 2
Words
"The sponsor agreed to submit a shipping validation report…"
Date
March 31, 2027
In the tracker
No entry, no owner
On the tracker: nothingOwed: March 31, 2027175 days left, and nobody knows.
Lena, your CMC lead, has no date for this report on any plan, because nobody has told her it is due. Left alone, the date passes in March with no report and no one aware of it.
Careful commitment tracking reads the discussion as well as the action items, and finds the date nobody put on the tracker while there is still time to meet it.
Postmarketing requirements and commitments: the duties, the clocks, FDA's numbers and what goes wrong
What a company owes its regulators after approval, where each duty is written down, how the reporting clocks run, and how teams keep track today, explained without selling anything. If you are new to regulatory affairs, start here.
01 · In plain words
Post-marketing commitments in plain words: the homework that comes with an approval
A drug company spends years proving a medicine works, and the US Food and Drug Administration (FDA) or another health authority finally approves it. Approval rarely ends the conversation. The approval letter often lists studies the company still has to run: a study in children, because the trials were in adults; a trial to confirm that an early result turns into real benefit for patients; a stability study on a new syringe. Each comes with dates for a protocol, for finishing the study and for the final report.
FDA calls the studies it can order postmarketing requirements, or PMRs. The studies a company agrees to in writing, without a statute or rule forcing them, are postmarketing commitments, or PMCs.1 Europe has its own versions, called specific obligations and post-authorisation measures. Other countries add local conditions to their approvals. A company with a few products in a few markets soon owes dozens of dated items to several agencies, and each item lives in a different letter.
Then there are the promises that never reach an approval letter. In a meeting about a new shipping route, a company's CMC lead (CMC means chemistry, manufacturing and controls, the part of a filing about how a product is made and tested) says the company will send a validation report by the end of March. FDA writes that into its minutes. In a reply to a Canadian reviewer's question, someone commits to send stability data. Those sentences bind the company in practice, and they are filed as ordinary correspondence.
Tracking means holding all of this in one record: the exact words, the date, who owns the work, how it is going, and what the agency last said. It also means reporting. Every year FDA expects a status report on each open study, and it publishes how companies are doing.1,2 An item leaves the open list only when the agency confirms it is done.
One FDA letter's path from the mailbox to a closed commitment
The agency writes something downFDA's October 2 letter approves Veltrimab for Crohn's disease and adds a pediatric study, PMR 4512-7, with its protocol due in June 2027.
Someone finds it and records itThe exact wording, the page, every date. This is where the May promise in the Type C minutes was lost.
Owners are named and watchedA regulatory owner and a functional owner (the person whose team does the work), with internal targets well before the agency date.
Status goes back to the agencyAnnual status tables, 180-day reports on a confirmatory trial, renewal updates in Europe.
The agency closes itFDA writes that the item is fulfilled or released. Until that letter arrives, it stays open.
Steps 2, 3 and 4 are the subject of this guide. The company, products and dates in this example are fictional.
Why a submitted report stays open, and three more commitment surprises
Your status is public
FDA publishes a searchable, downloadable database of open PMRs and PMCs, refreshed four times a year, with the applicant and the status of each study. A competitor, a journalist or a patient group can look up what you owe.1,2
Submitting the report closes nothing
"Submitted" is an open status. An item closes when FDA tells the applicant in writing that it is fulfilled, or releases the applicant from it.1 In this guide's example, FDA's letter came eight months after the report.
CMC commitments are in no public list
FDA's database leaves out commitments on chemistry, manufacturing and controls, and its annual performance report does too.1,3 For those, your own record is the only complete list anyone has.
Nobody publishes how often promises get lost
We found no regulator, survey or study that counts promises dropped from meeting minutes. Reading your own minutes for one product is the only way to learn your number.
What PMR, PMC, annual status report and fulfilled mean
PMR
A postmarketing requirement: a study or clinical trial a statute or regulation makes the applicant (the company holding the approval) run after approval.1
PMC
A postmarketing commitment: a study or trial the applicant agrees in writing to run, with no statute or regulation requiring it.1
Annual status report
The yearly report to FDA on each open PMR and PMC, due within 60 days of the approval anniversary.4,5
Fulfilled
FDA has written to the applicant that the requirement or commitment is met. Only then does it count as closed.1,6
PMR vs PMC vs a promise in the minutes: three kinds of post-approval duty
In shortA PMR is required by law. A PMC is agreed in writing. A promise is an undertaking the company gave a regulator in a meeting or a reply, with no formal number. FDA's public data tracks the first two, apart from CMC commitments; only your own reading finds the third.
The difference between the first two is legal. FDA can require a study under four authorities, listed below, and missing a requirement can bring enforcement. A PMC has no such statute behind it, though FDA still tracks it and many applicants must report on it each year.1
The third kind has no agency term at all. "Promise" is this guide's word for a dated undertaking that appears only in minutes, a written response or an email. It has no number and no line in any public database, and the only file that holds it is the correspondence archive. The cards below use this guide's fictional company, Northwind Bio, whose medicines include Veltrimab and Dravenzo.
Required
Postmarketing requirement
Written into an approval letter or a later letter under a named authority, numbered by FDA. Dravenzo's PMR 3990-4, a deferred pediatric study, is one. Reported every year until FDA closes it.
Agreed
Postmarketing commitment
Agreed with FDA and usually listed in the same letter, also numbered. Veltrimab's PMC 4512-1, a long-term remission registry, is one. Clinical ones go in the annual status report; CMC ones are reported another way.
Said
Promise outside a letter
"The sponsor agreed to submit…" in minutes, or "Northwind commits to…" in a reply. Veltrimab's shipping validation report by March 31, 2027 is one. Only someone reading the sentence will find it.
The four authorities behind FDA's postmarketing requirements
Authority
What it lets FDA require
A tracking detail that catches people
Section 505(o)(3) of the Federal Food, Drug, and Cosmetic Act (FD&C Act), added by the Food and Drug Administration Amendments Act of 2007 (FDAAA)
Postmarketing studies and clinical trials, on the grounds the section sets out.1
Falling behind the original schedule, or failing to report status, counts as a violation unless the applicant shows good cause.1
Pediatric Research Equity Act (PREA), section 505B
Studies of certain new drugs in children, which may be deferred until adult data have been reviewed.1
If FDA extends a deferral, the new date counts as the original date, so status is judged against it. Ask at least 90 days before the deferral would expire.1
Accelerated approval (approval on an early measure likely to predict benefit), section 506(c), 21 CFR 314.510 and 601.41
Studies to verify and describe the predicted effect or other clinical benefit.1
Progress reports at least every 180 days, on top of the annual report.7
Animal efficacy rule, 21 CFR 314.610 and 601.91
Studies for drugs approved on animal data because human efficacy trials are unethical or not feasible.1
They run only when an emergency arises. Without one, FDA says they "will remain pending indefinitely".1
21 CFR means title 21 of the Code of Federal Regulations, where FDA's rules sit.
Two authorities account for nine in ten open postmarketing requirements
Open PMRs by authority, September 30, 2024, on-schedule and off-schedule added together
FDAAA section 505(o)(3)885
PREA, pediatric620
Accelerated approval113
Animal efficacy18
Source1 · Our addition of FDA's Tables 4 and 5. FDA counts 1,636 open PMRs in all, plus 386 open PMCs.
Show the numbers
Authority
Open PMRs
FDAAA section 505(o)(3)
885
PREA, pediatric
620
Accelerated approval
113
Animal efficacy
18
The wording is the record. Three phrases change what a line means. "Required" points to a statute. "We remind you" often repeats a rule that already binds every product, and creates no new item. "The sponsor agreed" in minutes is a promise, however informal the meeting felt. Good tracking copies the agency's sentence exactly, because a paraphrase loses which of these it was.
03 · The rules and their dates
The FDA rules behind PMR and PMC tracking, and what changed in 2026
In shortSection 506B of the FD&C Act and two regulations set the yearly report. Later laws added required studies, pediatric studies and 180-day reports. In 2026 Congress opened PREA failures to enforcement under section 303, the Act's penalties section, and FDA finalized its formal meetings guidance, the document that says minutes are the official record.
Status as of November 2026
Three decades of laws have added clocks; none has taken one away
1997FDAMA section 130
Creates section 506B: annual reports on postmarketing studies.
2003PREA
Required pediatric studies, deferrable after adult data.
2007FDAAA
Adds section 505(o)(3), with the power to require studies and to treat a missed schedule as a violation.
2012FDASIA
Lets FDA extend a pediatric deferral.
Dec 2022FDORA section 3210
Accelerated approval reforms: reports at least every 180 days, and a faster route to withdrawal.
Feb 3, 2026Public Law 119-75, section 6602
Opens PREA failures to section 303 action on a lack of due diligence, after a noncompliance letter and 45 days to respond. Covers failures from August 2, 2026.
Aug 2026Formal meetings guidance final
Finalizes the 2023 draft: minutes in 30 calendar days, and minutes are the official record.
A first report within one year of approval and annually after that; reports at least every 180 days for accelerated approval, which FDA must post; a yearly Federal Register report; a posted statement when a study deadline is missed.7
In force
21 CFR 314.81(b)(2)(vii) and (viii)
For new drug applications (NDAs) and abbreviated new drug applications (ANDAs): the status of each required or committed study in the four clinical and nonclinical categories the rule lists. Item (viii) covers other postmarketing studies, including CMC and stability studies the applicant agreed to.5
In force
21 CFR 601.70 and 601.28
For biologics license applications (BLAs): the same four kinds of study and the same five status terms, within 60 days of the anniversary of U.S. approval. Section 601.28 adds a yearly report on pediatric studies.4,12
In force
FDA's good cause guidance for section 505(o)(3)(E)(ii)
How FDA judges good cause for a missed required study deadline, and how to communicate with it.13
Draft, July 2023
Formal meetings guidance
Minutes within 30 calendar days of a formal meeting, and a written route for disagreeing with them. Section 04 explains both.10
Final, August 2026
Accelerated approval guidance
When a confirmatory trial counts as underway before approval.14
Draft, January 2025. FDA's guidance page still labeled it draft in November 2026.
EU pharma package
A new regulation and directive. They are not law yet, so plan on today's rules for conditional authorisations and specific obligations.15
Not law on November 3, 2026. Council position adopted September 28, 2026; Parliament's second reading awaited, with no Official Journal reference.15 The new rules apply 24 months after entry into force.16
FDA's guidance documents are its current thinking and do not bind anyone. The statutes and regulations do.
04 · Where commitments are written
Regulatory commitments live in five kinds of document, and only one announces them under a heading
In shortApproval letters announce their requirements under clear headings, so they get entered. Minutes, question responses and local certificates do not, and they are filed as correspondence. Dates also come in several forms, from a calendar day to "after 30 lots", and each needs a decision when it goes on a tracker.
Document
Where the duty sits
What to capture
Approval or supplement approval letter
Under headings such as required pediatric assessments and postmarketing commitments, each with a number and milestone dates.
Number, exact wording, authority, each milestone. A later letter can revise an existing item, so compare before adding.
FDA meeting minutes
In the discussion under each question, and sometimes in the action items. A written-response-only meeting has no minutes; its written responses serve as the record.10
The sentence, the question it answers, the page, and whether a date is stated.
Responses to agency questions
In your own reply, often in one line. Your team wrote it, so nobody reads it as an incoming duty.
The undertaking, the agency and the question number.
EU decision and Annex II, CHMP opinions
Annex II.D for conditions, Annex II.E for specific obligations; recommendations in assessment documents.17
Category, due date, and each later change to it.
Local approvals and certificates
In a decision or certificate held by an affiliate, sometimes translated.
The condition, the original and the translation, and a named local owner.
A supplement is a filing that changes an approved application. EMA is the European Medicines Agency, and CHMP is its committee for human medicines.
Score your documents: minutes and question responses are the first place to look
A way to score your own documents. Replace these ratings with what you find in a sample
Usually fineSometimes missedOften missed
Found on arrivalStates a clear dateHas a named ownerReaches the status reportApproval letterUsually fineUsually fineSometimes missedUsually fineSupplement letterSometimes missedUsually fineSometimes missedSometimes missedMeeting minutesOften missedSometimes missedOften missedOften missedQuestion responseOften missedSometimes missedOften missedOften missedLocal certificateSometimes missedUsually fineOften missedOften missed
Illustrative · replace with your own numbers
Show the numbers
Found on arrival
States a clear date
Has a named owner
Reaches the status report
Approval letter
Usually fine
Usually fine
Sometimes missed
Usually fine
Supplement letter
Sometimes missed
Usually fine
Sometimes missed
Sometimes missed
Meeting minutes
Often missed
Sometimes missed
Often missed
Often missed
Question response
Often missed
Sometimes missed
Often missed
Often missed
Local certificate
Sometimes missed
Usually fine
Often missed
Often missed
Why a promise in FDA minutes is easy to miss and hard to dismiss
FDA holds several kinds of formal meeting with sponsors, the companies behind a medicine: Type A, Type B, Type B (end of phase), Type C, Type D and INTERACT. It issues "the official, finalized minutes to the requester within 30 calendar days after the meeting", and its guidance says "FDA's minutes are the official records of meetings".10
If you disagree with the minutes, you contact the FDA project manager and, if that does not settle it, send a written description of the disagreement. FDA then confirms the minutes stand or adds an addendum.10 So the record is what FDA wrote, unless you objected.
Teams read minutes for the answer to their question, and for the action items. A dated promise can sit in the discussion paragraph just above. That is how it happens in this guide's example: on page 2 of the Type C minutes, the action items list final minutes and a packaging supplement, while the sentence "The sponsor agreed to submit a shipping validation report… to the BLA by March 31, 2027" sits at the end of Question 3.
Five forms a due date can take on a postmarketing commitment
Form in the document
Example
How to record it
Month and year
"Final Protocol Submission: 06/2027"
Keep the agency's wording, and track the last day of the month, June 30, 2027.
Calendar day
"by March 31, 2027"
Record it as written.
Tied to another filing
"with the next annual report for NDA 218904"
Work out the date (March 13, 2027 here) and show that a person derived it.
Tied to an event
"after 30 commercial lots have been manufactured"
Track the event as well as the stated date. The lots can run out of time before the calendar does.
No date at all
"the sponsor will provide the data when available"
Keep it visible as undated, and ask a person to set a date. Never invent one.
05 · The annual status report
The annual status report under 21 CFR 314.81 and 601.70, worked through
In shortFor each open study, the report gives the description, the original and any revised schedule, one of five status words, and an explanation. It is due within 60 days of the approval anniversary. Status is judged against the original schedule, so moving a date rarely clears the word "delayed".
What each row of a PMR and PMC status table must say
The two regulations ask for the same things: the applicant's name, the product, the application and supplement number, the approval date, the date of the commitment, a description of the study, its schedule, its current status and an explanation of that status.4,5 The explanation is the hard part. For NDAs it covers patient enrollment against the planned total and the reasons for any schedule change.5 Those facts sit with clinical, CMC and real-world evidence teams, so someone has to go and get them, one sentence at a time.
Due date of the report = anniversary of U.S. approval + 60 days, or an alternate date FDA has granted in writing. Veltrimab: October 21 + 60 days = December 20, 2026. Dravenzo: January 12 + 60 days = March 13, 2027.
FDA lets applicants ask for an alternate reporting date, and some use one to report on several applications at once.1 Write the granted date on the record. An alternate date that lives in one person's memory is a late report waiting to happen. Pediatric studies on a BLA carry a further yearly report under 21 CFR 601.28, also within 60 days of the anniversary.12
The five status words and the sixth state that closes the item
Finished or ended, and the final report is with FDA.4,6
PMC 4512-5: final report sent June 22, 2026.
Closed, by FDA's letter only
Fulfilled or released
FDA confirms the terms are met, or releases the applicant because the study is no longer feasible or useful.1,6
Dravenzo PMR 3990-1: FDA's letter arrives on October 5.
Pending is the largest status on open requirements, and delayed comes next
Open PMRs by status, NDAs and BLAs together, September 30, 2024
1,636open PMRs
Pending616
Delayed485
Ongoing346
Submitted185
Terminated4
Source1 · FDA counts pending, ongoing and submitted as on schedule; delayed and terminated as off schedule.
Show the numbers
Part
Value
Pending
616
Delayed
485
Ongoing
346
Submitted
185
Terminated
4
Moving a date usually leaves the word "delayed" in place. Status is measured against the original schedule, even when FDA has acknowledged a new plan.4,1 The exception is a granted pediatric deferral extension, where FDA treats the new date as the original one.1 A tracker that overwrites the first date loses the only number that sets the status, so keep the original and the current date side by side.
What a CMC commitment on the same letter does differently
A single approval letter can list clinical and CMC commitments side by side, and they part ways at reporting. FDA's report states that the status of PMCs on chemistry, manufacturing and production controls is "not required to be reported" under 21 CFR 314.81(b)(2)(vii) and 601.70, and they are absent from FDA's database and its performance report.1 For NDAs, section 314.81(b)(2)(viii) covers them instead.5
They still have dates, and a missed one still reaches the FDA division that reviews your next supplement. Keep them on the same record, and report them by the route your letter names.
06 · 180-day reports
Accelerated approval confirmatory trials and the 180-day progress report clock
In shortA drug on accelerated approval owes a progress report on its confirmatory trial at least every 180 days, and FDA posts what it receives. FDA's fiscal 2024 report describes two reports a year: one 180 days after approval and one with the annual status report. A schedule counted from each last date drifts earlier on the calendar, so agree your convention with your FDA division and write it down.
Accelerated approval lets FDA approve a drug on an early measure that is likely to predict benefit, on the condition that the company runs a study to confirm the benefit. If the confirmatory trial fails, FDA has procedures that can remove the drug from the market.18
The 2022 reforms, section 3210 of the Food and Drug Omnibus Reform Act (FDORA), tightened this in several ways.7,19 The law now says the sponsor "shall submit to the Secretary a report… not later than 180 days after the approval of such drug and not less frequently than every 180 days thereafter", and that FDA "shall promptly publish" what is reported on its website.7
FDA may require the study to be underway before approval or within a set time after it, and failure to run a required study "with due diligence" is a ground for expedited withdrawal.19
104 of 278
accelerated approval applications had incomplete confirmatory trials, in the applications FDA's drug center approved from 1992 through 2021.20
Department of Health and Human Services (HHS) inspector general, September 2022, data as of May 2022
34%
of those 104 (35 applications) had at least one trial past its original planned completion date.20
HHS OIG, September 2022
13%
of all accelerated approval applications had been withdrawn when the inspector general reported.20
HHS OIG, September 2022
Counted 180 days at a time, Talvoren's report falls five days earlier each October
Talvoren is a fictional drug in this guide's example. Each date is 180 days after the last, from accelerated approval on April 22, 2025
Apr 22, 2025Accelerated approval
The clock starts on the letter's date.
Oct 19, 2025Report 1
Submitted October 15.
Apr 17, 2026Report 2
Submitted April 10.
Oct 14, 2026Report 3
Seven days away on October 7, and no draft exists.
Apr 12, 2027Report 4
Next in the series.
Fictional example from this guide
Show the numbers
When
What
Apr 22, 2025
Accelerated approval
Oct 19, 2025
Report 1
Apr 17, 2026
Report 2
Oct 14, 2026
Report 3
Apr 12, 2027
Report 4
Which date does the next 180 days count from? The example counts each deadline from the last deadline. The statute says "not less frequently than every 180 days", which a cautious reader counts from the last report actually filed: report 2 went in on April 10, and 180 days from then is October 7, a week earlier than the schedule shows. FDA's fiscal 2024 report describes a fixed pattern instead: the first report 180 days after approval, with a 60-day grace period, and the next with the annual status report, both every year.1 Agree your convention with your FDA division, and record it.
The 180-day report is short, and it often has its own owner, even when one of the two goes in with the annual report. It gives trial status, enrollment and any change to the timeline, usually with facts from a clinical team busy running that trial. The same trial often appears in other markets' conditions too, with other dates, as the next section shows.
07 · EU and other markets
How EU specific obligations, post-authorisation measures and other markets' conditions add their own dates
In shortEMA sorts post-authorisation measures into categories with their own codes and due dates. A conditional authorisation lasts a year, and the renewal application is due six months before it expires, with an update on the specific obligations. Other regulators work in similar ways, so one trial can owe different dates in five markets.
A conditional marketing authorisation lets the EU approve a medicine for an unmet need on less complete data. It is "valid for one year" and "can be renewed annually", and the holder must "fulfil specific obligations within defined timelines".21 Commission Regulation 507/2006 sets the frame: the obligations and their timeframe are spelled out, and the renewal goes in at least six months before expiry.22
EMA adds that with no application the authorisation "will expire automatically", and that the interim report should give details for each specific obligation.23 From 2006 to June 2016, 30 medicines received one, and it took an average of four years to generate the further data needed to convert to a full authorisation.24 We did not find a newer count that we could read; check EMA's annual reports.
EMA code
What it is
Where it sits and how binding
SOB
Specific obligation, imposed only on conditional authorisations and those under exceptional circumstances.17
Annex II.E of the Commission decision. Reviewed at each renewal or annual re-assessment.23,17
ANX
A condition of the authorisation. It can include a post-authorisation efficacy study (PAES).17,25
EMA says these "are not binding" on the authorisation.17 They are still worth keeping on the record.
EMA uses other codes too; its questions and answers give the full list.17
Changing a date in the EU has its own procedure. The holder submits the data on the timeframe the committee set and may propose dates, which the committee must agree. Changing the due date of a specific obligation or an Annex II condition is a type IB variation (a minor change filed with EMA), category C.9.b.17 A medicine authorised under exceptional circumstances goes through an annual re-assessment, filed on the anniversary of the Commission decision, adjustable by up to two months either way.23
How the UK, Canada, Switzerland and Australia handle approval conditions
A Letter of Undertaking signed by the CEO or a designated signing authority; annual status reports within 60 calendar days of the anniversary, using the words Pending, Ongoing, Delayed, Terminated, Submitted and Fulfilled.27 New terms and conditions authorities take effect April 1, 2027.11
Swissmedic
Temporary authorisation under Article 9a of the Therapeutic Products Act.28
Granted for at most two years, with special conditions.28
Two years at first, with up to two extensions and six years at most; confirmatory data fall due on the date set from the sponsor's clinical study plan.29
The example's register also holds local conditions from PMDA in Japan, TGA in Australia and ANVISA in Brazil. Those entries, including their wording and dates, are fictional; check each agency's current rules for your own products.
One trial owes Europe its final report three months before the US
Dates attached to the Talvoren confirmatory trial TMR-301, by agency
Nov 18, 2026TGA, Australia
Apply to extend the provisional registration, with an update on the trial.
Dec 22, 2026EMA
Conditional authorisation renewal, with an update on the specific obligations.
Mar 31, 2027FDA
Trial completion, PMR 4601-1.
Jun 30, 2027EMA
Final clinical study report, SOB 001.
Sep 30, 2027FDA and Health Canada
Final report with datasets.
Fictional example from this guide
Show the numbers
When
What
Nov 18, 2026
TGA, Australia
Dec 22, 2026
EMA
Mar 31, 2027
FDA
Jun 30, 2027
EMA
Sep 30, 2027
FDA and Health Canada
This is why teams link one study across markets. If the US and EU leads each keep their own list, each sees a coherent plan, and nobody sees that Europe needs the final report on June 30, 2027 while the US plan writes it for September. A slip in the trial moves every line at once.
08 · What goes wrong
Why post-approval commitments slip: twelve errors and where each one starts
In shortMost failures start months before the agency date: a sentence never entered, an owner who left, an internal milestone nobody watched. FDA's own count shows about one annual status report in five arrived late or not at all in fiscal 2024. The errors below are our reading of how the rules and the documents interact; no public study ranks them.
Of 750 annual status reports due, 583 arrived on time
NDA and BLA status reports expected in FDA's fiscal 2024
Expected in fiscal 2024750
Received at any point in the year649
Received on time583
Source1 · "On time" is FDA's test: within 60 days before or after the anniversary or alternate date.
Show the numbers
Stage
Reports
Expected in fiscal 2024
750
Received at any point in the year
649
Received on time
583
Error
How it happens
What it does
Reading the document
Promise left in the minutes
The reader looks at the action items and the answer to the question.
No owner, no plan, and the date arrives unannounced.
Reminder logged as a commitment
"We remind you" of a rule that applies to every licensed product.
False items that dilute the list.
Revised wording overwrites the old
A later letter widens a study's scope and someone edits the entry in place.
Nobody can show what the original said or when it changed.
Paraphrased title replaces the sentence
Long wording gets shortened to fit a spreadsheet cell.
The owner plans for the title, and the agency judges the sentence.
Keeping the dates
Internal targets unseen
The tracker holds the agency date and the plan lives with the function.
Lots or patients fall behind for months before anyone reacts.
Original schedule lost
The cell holds one date, so the new date replaces it.
What a missed PMR or PMC date risks: public status, penalties and withdrawal
In shortThe first consequence is visibility: FDA's public database and annual report. Beyond that come a violation finding for a required study, civil money penalties, misbranding and, since 2026, section 303 action on PREA studies. Accelerated approvals also face a faster route to withdrawal. Patients carry the real cost when pediatric or confirmatory data arrive late.
Three in ten open postmarketing requirements are off schedule
30 in 100
open PMRs were off schedule on September 30, 2024: 489 of 1,636. For PMCs it was 79 of 386, about 20 in 100.
open PMRs were off schedule on September 30, 2024: 489 of 1,636. For PMCs it was 79 of 386, about 20 in 100.
30 of 100
Deferred pediatric studies run late more than any other kind
Share of open PMRs off schedule, by authority, September 30, 2024
PREA, pediatric (252 of 620)41%
FDAAA section 505(o)(3) (218 of 885)25%
Accelerated approval (19 of 113)17%
Animal efficacy (0 of 18)0%
Our reading of the sources1 · Our division of FDA's Tables 4 and 5. Animal efficacy studies wait for an emergency, so they stay pending.
Show the numbers
Authority
Off schedule
PREA, pediatric (252 of 620)
41%
FDAAA section 505(o)(3) (218 of 885)
25%
Accelerated approval (19 of 113)
17%
Animal efficacy (0 of 18)
0%
Consequence
When it applies
Source
Public status
PMRs and non-CMC PMCs that FDA has verified for posting, open or closed in the past year, in a database refreshed around the end of January, April, July and October.
Violations of section 505(o): up to $377,701 per violation and $1,510,803 per proceeding. These are the 2025 levels, which HHS keeps for 2026. Since February 2026 the penalty section also names section 505B, though HHS's table does not yet list it.
Until February 2026 a PREA failure could not bring section 303 action. Now it can, if the company showed a lack of due diligence, after a noncompliance letter and 45 days to respond in writing. It covers failures from August 2, 2026 (180 days after enactment), and products still marketed.
Where the PMRs from each fiscal year stand: delayed, open or closed
Six years on, a quarter of fiscal 2018's requirements are still delayed
PMR status on September 30, 2024, by the fiscal year FDA set the requirement, percent of each year
PendingOngoingSubmittedDelayed or terminatedClosed
FY201810%24%56%
FY201912%19%60%
FY202016%17%18%43%
FY202113%19%20%42%
FY202233%22%16%23%
FY202359%14%13%
FY202487%
Source1 · Rounded from FDA's Table 8; closed is fulfilled plus released.
Show the numbers
Pending
Ongoing
Submitted
Delayed or terminated
Closed
FY2018
4%
10%
6%
24%
56%
FY2019
3%
12%
6%
19%
60%
FY2020
16%
17%
6%
18%
43%
FY2021
13%
19%
6%
20%
42%
FY2022
33%
22%
6%
16%
23%
FY2023
59%
14%
7%
7%
13%
FY2024
87%
6%
5%
1%
1%
A third of the requirements closed in fiscal 2024 closed without being fulfilled
PMRs closed in fiscal 2024, NDAs and BLAs together
Fulfilled156
Released: no longer feasible, or product withdrawn62
Released and replaced by a revised requirement19
Source1 · Our addition of FDA's NDA and BLA columns in Table 7.
Show the numbers
How it closed
PMRs
Fulfilled
156
Released: no longer feasible, or product withdrawn
62
Released and replaced by a revised requirement
19
Enforcement figures tell a small part of the story. A late pediatric study can mean children go on being treated without a tested dose. A late confirmatory trial means patients and payers rely longer on an unconfirmed benefit: the inspector general counted more than $18 billion in Medicare and Medicaid spending from 2018 through 2021 on the 18 drugs behind the applications with trials past their original dates.20 And for the company, every supplement filed to a division that is waiting on a late report starts with that conversation.
10 · The numbers
How many postmarketing requirements are open: FDA's counts, and what nobody publishes
In shortOn September 30, 2024, 402 applicants held 2,022 open PMRs and PMCs across 826 applications, or about five per applicant. FDA adds roughly 300 new requirements a year. Nobody publishes a market size for tracking tools, or how much time the work takes.
2,022
open PMRs and PMCs on September 30, 2024: 1,636 requirements and 386 commitments.1
FDA, fiscal 2024 report
5.0 each
open items per applicant on average, with 402 applicants and 826 applications, or 2.4 per application. CMC items come on top.1
Our division of FDA's counts
299 a year
new PMRs on average since fiscal 2018, and 84 new PMCs.1
FDA, fiscal 2024 report
The open list has stayed near 1,600 requirements and 370 commitments for three years
Open PMRsOpen PMCs
05001,0001,5002,0001,636386
FY2022FY2023FY2024
Source1,33,34,35 · Counts on September 30 of each year. FDA cautions that comparing open and on- or off-schedule counts across years can be misleading, because the group of items changes. Read this as the size of the list each year, with no judgment on performance.
Show the numbers
Open PMRs
Open PMCs
FY2022
1,602
364
FY2023
1,575
360
FY2024
1,636
386
More companies hold open postmarketing items each year
Lost promises, table hours, software share: figures nobody publishes, and how to get yours
Question
Public figure
What to measure instead
How many promises sit outside the tracker?
No public figure.
Read every set of minutes and every question response for one product, and count the undertakings with no entry.
Hours to compile one status table
No public figure.
Time your next three tables, including every email to an owner.
Share of companies using a commitments module in a regulatory information management (RIM) system
We found no figure we could read and verify.
Ask peers. What matters is which documents feed yours.
Size of the commitment tracking software market
No public figure for this function alone.
Your own cost: people, hours, and the recovery work after each late item.
Items per product, outside the US
No public figure.
Count one product across every market it is sold in.
A quick outside check on your own record costs nothing: download FDA's database, filter to your applications, and compare every row and status with your tracker. Explain each difference; some will be lag, because FDA reviews what it receives before it updates a status.1,2
11 · AI and the regulators
What AI can do for regulatory commitments management, and what regulators expect
In shortReading letters and minutes for undertakings, comparing them with a register and drafting status text are good jobs for software, because each result can be checked against its page. FDA's draft AI guidance leaves out internal workflows that have no effect on patients, quality or study reliability. People still sign, and electronic signature and audit trail rules still apply to the records.
The work that moves to software, and the decisions that stay with named people
Good job for software
Why it is checkable
What stays with a person
Find each undertaking in every letter and set of minutes
The sentence and its page can be shown beside the result.
Whether it is a real duty, and its type.
Compare with the register: new, changed, or a status event
Old and new wording can sit side by side.
Applying a change to a date or scope.
Watch every milestone and internal target daily
Date arithmetic can be tested.
Whether to ask for a new date, and what to tell the agency.
Draft status rows from the register
Each explanation can cite its evidence.
The status word, the explanation, and the signature.
Status as of November 2026
Text
What it says, exactly
Status and reach
FDA draft guidance on AI for regulatory decision-making
Covers AI that produces "information or data to support regulatory decision-making". It "does not address" AI used "for operational efficiencies (e.g., internal workflows, resource allocation, drafting/writing a regulatory submission) that do not impact patient safety, drug quality, or the reliability of results".36
Draft, January 2025; FDA's page still labeled it draft in November 2026. A tracker likely sits in the exclusion, but FDA asks sponsors to engage early if unsure. Your own quality group should decide.
21 CFR Part 11, FDA's rule on electronic records and signatures
Secure, computer-generated, time-stamped audit trails that do "not obscure previously recorded information"; signed records that show the signer's printed name, the date and time, and the meaning of the signature.37
In force. FDA's October 2024 questions and answers cover clinical investigations.38 Tools can only offer controls that support your compliance; no product can be certified to Part 11.
FDA Computer Software Assurance guidance
Written for "computers and automated data processing systems used as part of medical device production or the quality management system".39
Issued February 3, 2026, replacing the September 2025 issue. Its scope is device production and quality systems. It is useful as a way of thinking about risk, and it does not govern a drug regulatory tracker.
Draft EU good manufacturing practice (GMP) Annex 22, artificial intelligence
Covers static models with deterministic output (the same input always gives the same answer) in GMP computerised systems. Generative AI and large language models "should not be used in critical GMP applications"; in non-critical ones, qualified personnel stay responsible for the outputs.40
Still a draft on November 3, 2026: consultation closed October 7, 2025,41 and EudraLex Volume 4 lists no Annex 22. It is aimed at manufacturing, so a regulatory tracker is outside it, but check before a tool feeds a GMP decision on a CMC commitment.
FDA and EMA guiding principles; EMA reflection paper
Ten principles of good AI practice in drug development, starting with "Human-centric by design".42 EMA's paper gives its views across the medicine's lifecycle.43
January 2026 and September 2024. Principles, with no binding force of their own.
Data integrity: MHRA guidance, ALCOA+, ISPE GAMP
Records attributable, legible, contemporaneous, original and accurate, plus complete, consistent, enduring and available.44 ISPE's AI guide covers the system lifecycle and supplier duties.45
MHRA 2018, updated 2021. ISPE July 2025, an industry guide.
EU AI Act
Regulation (EU) 2026/1744 moves high-risk duties under Annex III to December 2, 2027 and, for AI embedded in regulated products, to August 2, 2028.46
In force since July 27, 2026, published July 24, as a law firm reports it. Whether your tool is high risk is your counsel's call.
Signature and audit trail rules reach every step; AI-specific texts reach few
Which text bears on which tracking task
Outside its aimWorth checkingApplies
Part 11FDA AI draftDraft Annex 22Data integrityReading letters and minutesWorth checkingOutside its aimOutside its aimAppliesProposing a register entryWorth checkingOutside its aimOutside its aimAppliesSigning an entry or date changeAppliesOutside its aimOutside its aimAppliesDrafting a status explanationWorth checkingWorth checkingOutside its aimAppliesA CMC decision that feeds GMPAppliesWorth checkingWorth checkingApplies
Our reading of the sources37,36,40,44 · Our reading, for discussion with your quality group. General information only; take your own legal advice.
Show the numbers
Part 11
FDA AI draft
Draft Annex 22
Data integrity
Reading letters and minutes
Worth checking
Outside its aim
Outside its aim
Applies
Proposing a register entry
Worth checking
Outside its aim
Outside its aim
Applies
Signing an entry or date change
Applies
Outside its aim
Outside its aim
Applies
Drafting a status explanation
Worth checking
Worth checking
Outside its aim
Applies
A CMC decision that feeds GMP
Applies
Worth checking
Worth checking
Applies
The limit that matters most. A reading tool can miss a sentence or misjudge one. Measure both: give it documents where you already know every undertaking, and count what it finds, what it misses and what it flags wrongly. A confident list with no page beside each item is worth little. Always keep the check on the page, and keep a person's signature on the entry.
12 · How teams do it today
Who owns a health authority commitment today, from approval letter to status table
In shortRegulatory affairs owns the list, functional teams own the work, and regulatory operations compiles the reports. Teams commonly keep the record in a spreadsheet or a RIM module, typed by hand from approval letters. The hours pile up at report time, chasing status from people who have other jobs.
Regulatory lead, operations, functional owners and compliance: who carries what
RL
Regulatory lead
Owns the list for a product or portfolio, decides what is a commitment, signs entries and status tables, and talks to the agency.
Cares about: what the company said in a meeting that nobody wrote down.
RO
Regulatory operations
Files every letter, keeps the tracker, compiles annual status reports and 180-day reports.
Cares about: one sentence from each of twelve busy people.
EU
EU and affiliate regulatory leads
Specific obligations, Annex II conditions, renewals and local conditions, often with translated documents.
Cares about: EMA's date list agreeing with their own.
FO
Functional owners
Clinical, CMC and real-world evidence leads who run the studies and the assays.
Cares about: hearing early, with the agency's actual words.
CO
Compliance
Reviews changes to dates and scope, and prepares for inspections and partner audits.
Cares about: who moved a date, why, and what the agency wrote.
A commitment passes through five hand-offs before it reaches an annual table
1Letter arrives
Into a shared mailbox or the registrations archive.
Regulatory operationsDay 0
2Typed into the tracker
Approval letters are entered. Minutes and responses are filed.
Regulatory operationsDays later
3Owner told
An email, if someone knows who owns it now.
Regulatory leadWhen noticed
4Plan kept apart
Lots, patients and sites live in the function's plan.
Functional ownerUnseen
5Status chased
Once a year, by email, as the table comes due.
Regulatory operationsAbout 14 hours
6Table signed
Reviewed, corrected and filed with the annual report.
Regulatory lead60 days after the anniversary
Fictional example from this guide
Show the numbers
Step
What happens
Who
Time
Letter arrives
Into a shared mailbox or the registrations archive.
Regulatory operations
Day 0
Typed into the tracker
Approval letters are entered. Minutes and responses are filed.
Regulatory operations
Days later
Owner told
An email, if someone knows who owns it now.
Regulatory lead
When noticed
Plan kept apart
Lots, patients and sites live in the function's plan.
Functional owner
Unseen
Status chased
Once a year, by email, as the table comes due.
Regulatory operations
About 14 hours
Table signed
Reviewed, corrected and filed with the annual report.
Regulatory lead
60 days after the anniversary
Over a third of a status table's hours go on chasing people
One working estimate for one annual status table: 38 hours in all, split by task, in hours
Gathering status from ownersCross-checking tracker, archive and lettersWriting each explanationReview and fixes
By hand141284
Illustrative · replace with your own numbers · An estimate used throughout this guide, drawn from no published study. Time your own.
Show the numbers
Gathering status from owners
Cross-checking tracker, archive and letters
Writing each explanation
Review and fixes
By hand
14
12
8
4
Spreadsheet, RIM module or outside help: three ways teams keep the record
Way
What it does well
Where it falls short
A shared spreadsheet
Fast to start, flexible, everyone can open it.
One date to a cell, no signatures, no link to the page, and an edit overwrites what was there.
The commitments module of a RIM suite
A validated system of record, with workflows and links to registrations.
It holds what someone typed in. Whether minutes and responses reach it depends on who read them.
An outside regulatory service
Extra hands at report time, useful after an acquisition.
The outsider knows only the documents it is sent, so the knowledge of what was said stays inside.
Part B · See it working
Botminds Post-Marketing Commitment Tracking on four products and eight health authorities
Part A described the work without naming a product. This part shows how Botminds does it, at a fictional biotech with four marketed medicines. Every company, person, number, letter and application number in the screens is sample data, and any rule text quoted on a screen is the sample's wording.
13 · Three letters, one promise
Three new FDA letters on October 7, and the shipping promise nobody tracked
In shortThis is the example from the top of the page, inside the product. Omar Haddad, the regulatory lead, clicks once. Specialist agents read three new FDA letters, put six new dates on the timeline as proposals, and re-read Veltrimab's 63 minutes and responses on file. They find one promise from May that was never tracked. Omar signs it onto the timeline, and Lena Ortiz, the CMC owner, will hear about it 90 days ahead.
1
Every date owed to an agency, on one timeline by product
Omar opens the commitment timeline: 29 open items, 4 products, 8 health authorities. Requirements are circles; commitments and promises are squares. Red means at risk. He clicks the red square on Veltrimab's lane: re-evaluate the limits on HMW species (high molecular weight, meaning clumped protein), due October 31, 24 days away.
The panel on the right shows where that date came from: the approval letter, page 2, in the agency's words, with 10/2026 highlighted. It also shows why the item is red: 21 of the 30 commercial lots have been made.
The commitment timeline. Twelve months of dates by product, colored by risk, with the page behind the selected date. The sample labels this CMC item "506B reportable"; see the note in section 15.
2
"Read 3 new letters": five steps you can watch
Three FDA letters are waiting. Omar clicks "Read 3 new letters". The Correspondence Reader identifies the S-008 supplement approval, the Dravenzo fulfillment letter and the Type B minutes. The Commitment Extractor finds 6 items, each with its page and exact words, and sets one standing reminder aside. The Change & Duplicate Checker sorts them: 4 new, 1 change to CMT-101, PMR 3990-1 fulfilled.
Because Veltrimab just received a new approval, the Promise Finder re-reads that product's 63 minutes and responses on file.
The agents at work. Each step says what it read and what it found. The last step is always a person's decision.
3
Proposed dates appear dashed until Omar signs
The new dates land on the timeline as dashed, violet proposals. The new pediatric Crohn's study, PMR 4512-7, has its final protocol due June 2027, nine months out, with study completion 06/2030 and the final report 12/2030. On Dravenzo, two promises from the Type B minutes appear the same way. Nothing is final yet.
Proposed dates, dashed. PMR 4512-7 with its three milestones highlighted in the letter, waiting for a signature.
4
Five promises outside approval letters, and one never tracked
Below the timeline, a panel lists what the company told agencies in meetings and replies. Two Health Canada responses are already on the timeline as CMT-111 and CMT-308. Two come from the new Dravenzo minutes, waiting for a signature. The fifth is at the top, marked "Never tracked · filed Jun 19".
Promises outside approval letters. Each row quotes the promise and shows whether it is tracked. Re-read just now: 63 Veltrimab documents plus the 3 new letters.
5
The sentence, the page and why it was missed
Omar clicks it. The panel shows the Type C minutes of June 12, page 2, the sentence with March 31, 2027 highlighted, and a plain note: a dated promise in the discussion of Question 3, filed on June 19 with no timeline entry. The source opens at the passage, and the action items sit just below it, listing other things.
The never-tracked promise. Due in six months, found today, with a proposed owner.
The minutes at the passage. The promise is highlighted. The action items below it do not mention it.
6
One signature puts CMT-116 on the timeline
"Add to the timeline" opens the promise with its date fixed by the minutes, Lena Ortiz as functional owner and the meaning of the signature: "I approve this timeline entry". The alerts are scheduled at 90, 60, 30 and 7 days before March 31, 2027: December 31, January 30, March 1 and March 24.
Omar signs. The promise becomes CMT-116, the open count goes from 29 to 30, and the panel now reads "On the timeline".
The signature has a meaning. Who signs, what the signature means, and when the alerts fire.
The record it creates. Exact wording, schedule, owners, and the minutes linked as the source.
The promise sat unwatched for 140 days, and 175 remain to deliver it
CMT-116, the shipping validation report for the 200 mg/mL prefilled syringe
May 20, 2026Type C meeting
The sponsor agrees to submit the report.
Jun 12, 2026FDA's minutes
Dated within FDA's 30 calendar days.
Jun 19, 2026Filed
The minutes are filed as correspondence. No timeline entry.
Oct 7, 2026Found and signed
The new approval triggers a re-read of the product's file.
Dec 31, 2026First alert
Lena Ortiz hears 90 days ahead.
Mar 31, 2027Report due
To the BLA.
Fictional example from this guide
Show the numbers
When
What
May 20, 2026
Type C meeting
Jun 12, 2026
FDA's minutes
Jun 19, 2026
Filed
Oct 7, 2026
Found and signed
Dec 31, 2026
First alert
Mar 31, 2027
Report due
14 · Reviewing a letter
Reviewing the S-008 approval letter: new requirement, changed commitment, standing reminder
In shortThe letter opens beside what was found. Each item carries its page, a confidence figure and a reason. A new requirement is confirmed, a change shows old and new wording, and a standing reminder is set aside. Omar decides each one, and a change to an existing record also needs a compliance countersignature.
Letter review. PMR 4512-7 at 97% confidence, typed as a deferred pediatric requirement under PREA, with its three milestones and proposed owners. Sample text, written in the style of an FDA letter.
Old and new, side by side. The remission registry widens to Crohn's disease. The schedule stays, and the original wording stays in the record's history.
Every letter, one tray. Waiting or filed, with what was found and who signed. The mailbox and the registrations archive feed it automatically.
Four kinds of finding, and what each one asks of the regulatory lead
Finding
In this letter set
Omar's choice
New item
PMR 4512-7; PMC 4512-8 (a drug-tolerant anti-drug antibody, or ADA, assay, final report 09/2027).
Confirm, edit or reject; confirm the proposed owner.
Change to a record
PMC 4512-1, wording widened; schedule unchanged.
Apply, add as new, or reject. Applying needs a second signature from Dana Okafor in compliance.
Status event
FDA's letter that PMR 3990-1 "was fulfilled".
Apply: the record moves from Submitted to Fulfilled and closes.
Not a commitment
The standing reminder on distribution reports.
Set aside with a stated reason, or add it anyway.
15 · The register and records
The commitments register, inherited items with no owner, and one study across five agencies
In shortBehind the timeline sits a register of every requirement, commitment, obligation, condition and promise. It filters by type, product, agency, owner and date. It shows who owns what, surfaces items that arrived in an acquisition with no owner, and links the same study across markets.
The register. Sorted by next due date. The next milestone, a small schedule bar and the owner sit on every line.
The acquisition's gap. Filter "No functional owner": two of Nexarin's four items, transferred from Merrow Therapeutics on September 2, have nobody producing the work.
Raised as a risk. An extractables and leachables study, due December 31, with no status since July. Assigning an owner is the next action.
One deliverable, several records. The confirmatory trial TMR-301 links its FDA requirement, the 180-day reports, the EMA specific obligation, the TGA condition and the Health Canada report.
Where the sample data differs from FDA's rules. The sample labels its CMC commitments "506B reportable", and its Veltrimab letter uses a CMC heading under section 506B. FDA's fiscal 2024 report says the status of CMC commitments is not required under 21 CFR 314.81(b)(2)(vii) and 601.70.1 The record's label is sample text; in your own setup it follows your letters and your regulatory group's reading.
16 · Before a date slips
Catching a slipping commitment early: internal targets, a new date and a 180-day draft
In shortEvery morning the Deadline Monitor checks each milestone and internal target, alerts owners from 90 days out and raises a slip the day a target is missed. Moving a date takes a reason and two signatures. A report that is due soon can be drafted on the spot from the trial's status.
1
Three internal targets missed before the agency date
On CMT-106, the HMW species re-evaluation, the plan said 25 lots by June 30, 30 lots by August 31 and a data review by September 30. All three were missed, by 99, 37 and 7 days. The agency date is still 24 days off, so there is time to talk to FDA before it passes.
Internal targets slip first. The owner's plan is shown beside the agency date, with what was missed and by how many days.
2
Requesting a new date takes a reason and two signatures
"Request a new date" opens a dialog. The Deadline Monitor and the Status Reporter draft the reason in the agency's terms: 21 of the 30 lots made, the 30th planned for February 2027, the supplement to follow, a proposed new date of May 31, 2027. Omar edits and signs; Dana Okafor countersigns. The dialog says the item will be reported as Delayed, which matches FDA's rule that status follows the original schedule.4
A drafted reason, for a person to sign. The earlier date stays in the record.
3
A 180-day progress report, drafted from the trial status
Talvoren's progress report 3 is due in 7 days and no draft exists. The Status Reporter reads the trial status (612 patients, enrollment complete April 16, 71% of final-analysis events), compares it with report 2, and writes the report in four sections with five citations. Omar can ask Dr. Maya Chen, the clinical owner, to check the facts, then sign and mark it submitted.
Progress report 3. Trial identification, status, enrollment and timeline, ready for the clinical owner's check.
17 · Annual status tables
Drafting the annual status table for BLA 769412, 74 days before it is due
In shortEach US application has its clock. The Status Reporter writes one row per requirement and commitment: original and current schedule, the agency's status word, and an explanation with its evidence. Sam Patel in regulatory operations reviews, Omar signs, and the section exports to the annual report. The dashboard and settings keep the whole portfolio in view.
Clocks by application. Anniversary plus 60 days for each, along with the 180-day report and EU renewals.
The drafted status table. Six rows, drafted before Omar signs the S-008 letter. PMC 4512-6 goes in as Delayed with its reason. The sample puts CMC rows here with the clinical ones; FDA does not require CMC status in this section,1 so set that split to suit your letters.
The solution's estimate: 38 hours to about 6 on one status table
Hours per application, by hand and drafted from the register
By hand (estimate)Drafted from the register (estimate)
Gathering status from owners14 hours2 hours
Cross-checking register, archive and letters12 hours1.5 hours
Writing each explanation8 hours1.5 hours
Review and fixes before signature4 hours1 hour
Illustrative · replace with your own numbers · The solution's own estimate before deployment. Time your own tables.
Show the numbers
By hand (estimate)
Drafted from the register (estimate)
Gathering status from owners
14 hours
2 hours
Cross-checking register, archive and letters
12 hours
1.5 hours
Writing each explanation
8 hours
1.5 hours
Review and fixes before signature
4 hours
1 hour
The dashboard. Open items, what is due, and how they split by kind. All figures are sample data. The 93% on-time rate (37 of 40 milestones) is a design target, which you measure once the solution is running.
Your lead times, your signers. Alerts at the days you choose, slip alerts, a 30-day escalation, a weekly digest, and named signers by kind of decision.
18 · Who reads, who signs
Seven commitment-tracking agents, and the people who sign every entry
In shortSeven specialist agents read, compare, route, watch and draft. None of them adds, changes or closes a record. A named person confirms each entry, a second person countersigns a change to a date or scope, and a commitment closes only when the agency confirms it.
Correspondence Reader to Status Reporter: what each agent does and never does
Correspondence Reader
Reads each letter, set of minutes and response, and works out the agency, document type, product, application and date. Translated copies keep a link to the original.
Never discards a page. Unknown document types go to a person.
Commitment Extractor
Finds each requirement, commitment, condition and promise, with the exact wording, the page, the legal basis and every date. Standing reminders are marked as not a commitment.
Never paraphrases the agency's words. An item with no date goes to a person.
Promise Finder
Reads minutes and responses, discussion included, for what the company said it would do, and checks each against the timeline. Re-reads a product's file on a new approval.
Never adds anything to the timeline, and never gives an undated promise a date.
Change & Duplicate Checker
Matches each item to the register by number, product, wording and study: new, a change, or a status event such as fulfilled. Links the same study across markets.
Never overwrites a record. The original wording and dates stay in the history.
Owner Router
Proposes regulatory and functional owners from your routing rules: clinical studies to the clinical owner, stability and assays to CMC, registries to real-world evidence, EU obligations to the EU lead. Raises inherited items with no owner.
Never assigns without a rule or a person's confirmation.
Deadline Monitor
Checks each milestone and internal target every morning, alerts owners at your lead times, raises a slip when a target is missed, and escalates 30 days out when there is no draft or evidence.
Never changes a date. Each alert names the record, the date and the owner.
Status Reporter
Drafts annual status tables, 180-day reports and EU obligation updates from the register: original and current schedule, the agency's status word, and a short explanation with citations.
Never submits, and never writes Submitted as Fulfilled. A delayed item always carries a reason.
Regulatory lead, compliance, EU lead: who signs what on the commitment record
Confirms and signsRegulatory leadEvery timeline entry and US status table, with the meaning of the signature recorded.
Second signatureComplianceCountersigns each change to a date or scope, with the reason and the earlier version in view.
Signs EU itemsEU regulatory leadEU obligations, renewals and their changes, routed by rule.
Electronic signatures record the signer's name, the time and the meaning, and every agent step and human decision goes on an audit trail you can export. These are controls that support your compliance with 21 CFR Part 11 and EU Annex 11; your validation stays yours. Botminds is SOC 2 Type II audited, and its information security is managed to ISO 27001. One rule is fixed: a commitment closes only when the agency confirms it.
Letters, minutes and responses in; a signed timeline and status tables out
From the agencies
Approval and supplement approval letters
FDA meeting minutes: Type A, B, C and D, and INTERACT
EU Annex II conditions, specific obligations and post-authorisation measures
Local approval certificates and conditions, with translations
From your team
Responses to agency questions
Your current tracker, as a starting point
Routing rules, lead times and signers
Progress and internal targets from each owner
Agents read, compare, watch and draftEvery letter, set of minutes and response, for every agency and market
A named person signs each entry
Every date linked to its page
Outputs
A commitment timeline by product, every date linked to its source page
Promises found outside approval letters
Alerts at 90, 60, 30 and 7 days, and slips raised
Annual status tables and 180-day reports, drafted and cited
A signed audit trail
Design targets
100% of dates link to their letter or minutes page
93% of milestones met on time
About 6 hours per status table, the solution's estimate before deployment
Your RIM, mailbox and document repository stay where they are
Regulatory mailbox
Approval and supplement letters are read as they arrive, every 15 minutes in the sample setup.
Your RIM system
It stays the system of record. Correspondence and approvals are read from the archive nightly.
Document repository
FDA minutes and responses to agency questions are read where they are filed.
Affiliates
Local certificates and conditions come in with their translations, each linked to the original.
Word exports
Status tables and progress reports export as documents for your normal publishing route.
Roles and maker-checker controls (one person prepares, another approves) apply across the portfolio, whether you run four products or a global catalog.
Part C · Are you ready to automate?
Automating PMR and PMC tracking: what late dates cost, what it returns and how to test it
You own a commitments list, or compile the reports, or answer for the products behind them. This part is written for you. It helps you count your costs, work out a return, judge how ready you are and test any vendor, including us, on your own letters and minutes.
19 · What late dates cost you
What a missed commitment costs you in penalties, public status and recovery hours
In shortNobody publishes what a late commitment costs a company, so the numbers that matter are yours. A few published figures frame them: how often reports arrive late, how often pediatric studies run behind, and the maximum civil penalty for a required study. Start with your own hours and your own near misses.
22%
of the 750 annual status reports due in fiscal 2024 were late or never arrived: 66 late, 101 not received.1
FDA, fiscal 2024 report · our addition
41%
of open PREA pediatric requirements were off schedule on September 30, 2024: 252 of 620.1
FDA, fiscal 2024 report · our division
$377,701
per violation is the top civil penalty for violating section 505(o), the 2025 level that HHS keeps for 2026.30,31
45 CFR 102.3 · HHS notice, October 2026
Status chasing, rework and lost promises: where the cost hides in your year
Cost
Where it hides
How to find your number in a week
Status table hours
Regulatory operations, and every owner who answers an email
Time your next status table, or rebuild last year's hours from the email thread
Letter intake
Reading and typing each letter into the tracker
Count last year's letters; time five
Lost promises
Minutes and responses filed as correspondence
Read all minutes and responses for one product; count undertakings not on the list
Late or delayed items
Recovery work: explanations, extra studies, meetings with the division
List every item moved or flagged delayed last year, and estimate hours per item
Differences from FDA's list
An item FDA shows as open that you show closed, or the reverse
Compare FDA's database download with your tracker2
Inherited portfolios
Items transferred in a deal, with spreadsheets and no owners
Count open items from your last acquisition or license, and how many have a named owner today
On this guide's starting assumptions, status tables take the most hours in a year
Hours a year at the calculator's defaults, before any automation
Status tables (12 at 38 hours)456
Recovering late items (3 at 60 hours)180
Status check-ins (80 items, 4 a year, half an hour)160
Letter intake (150 at 30 minutes)75
Illustrative · replace with your own numbers · The same assumptions as the calculator in the next section. Replace them with your own.
Show the numbers
Work
Hours a year
Status tables (12 at 38 hours)
456
Recovering late items (3 at 60 hours)
180
Status check-ins (80 items, 4 a year, half an hour)
160
Letter intake (150 at 30 minutes)
75
Costs no calculator counts: a partner audit, a stalled supplement, children still waiting
A division's patienceA late report colors the next conversation about a supplement or a new indication.
Partner and diligence reviewsA licensing partner or buyer asks for the list, and yours takes three weeks to rebuild.
The public record"Delayed" beside your product's name in a database anyone can search.
Patients waiting on dataA pediatric study behind schedule is a longer wait for a tested dose.
20 · Your return
Hours back on status tables and letter intake, set against the tool's yearly cost
In shortPut in your own numbers. The return comes from four places: status table hours, letter intake, status chasing and recovery from late items. Promises found before they fall due are real value that no formula prices well, so the calculator leaves them out. Every default is an illustrative assumption to replace.
Four places commitment tracking pays back
Status tables
Review and sign a drafted table
Rows arrive with schedules, status words and cited evidence; people review and sign.
tables × hours saved × loaded hourly cost
Letter intake
Confirm items with their wording already in place
Each item comes with its wording, dates and page.
letters × minutes saved ÷ 60 × hourly cost
Status chasing
Owners update a record they already watch
Alerts replace rounds of email for each open item.
items × check-ins × hours saved × hourly cost
Late items
Catch the slip while it is small
An internal target missed in June is cheaper to handle than a date missed in October.
late items avoided × recovery hours × hourly cost
Your yearly value from faster status tables and fewer late items
Your volumeYour timeYour cost
Illustrative yearly value
Status tables$0
Letter intake$0
Status chasing$0
Late items avoided$0
Value before cost$0
Net of tool and validation cost$0
Hours freed a year0
Formulas: tables × (hours today − with automation) × cost; letters × (minutes saved) ÷ 60 × cost; items × check-ins × hours saved × cost; late items × recovery hours × cost. 38 and 6 hours are the estimate used in this guide. Every default is an assumption: no public figure exists for any of them.
Start where misses are costly and reading is hard: minutes, responses and inherited files
A way to pick the first documents. Move the points to fit your portfolio
Is your commitments list ready for automation? Eight questions on documents, owners and signatures
In shortScore each question 0, 1 or 2. Nothing you choose leaves this page. The score says whether to build your baseline first, run a measured pilot or plan a full roll-out.
1
How much you owe
How many open requirements, commitments, obligations and conditions do you carry across all markets?
Why it mattersVolume and spread across agencies decide how much a single record saves.
A strong answer"About 120 items across six products and nine agencies, and we can show the list."
2
Where the documents sit
Can you put your hands on every letter, set of minutes and response for a product today?
Why it mattersA tool can only read what it can reach. Scattered files mean a clean-up comes first.
A strong answer"All in the registrations archive, with affiliates' certificates in one shared folder."
3
Promises in minutes
Does anyone read minutes and responses specifically for undertakings, and enter them?
Why it mattersNo public list covers this blind spot, so it can be an early win. A rule on what counts as a promise has to exist first.
A strong answer"A written rule on what we track, and a sample audit last year that found three missed."
4
Original and current dates
Does your record keep the original schedule, each revision and the agency's exact wording?
Why it mattersFDA's status words depend on the original schedule. A tool can't restore what was overwritten.
A strong answer"Both dates in separate fields, wording copied in full, every change dated."
5
Named functional owners
Does every open item have a person who owns the work, and do they know it?
Why it mattersAlerts need someone to reach. Items from an acquisition are the usual gap.
A strong answer"Yes, checked quarterly; three inherited items were reassigned in September."
6
Internal targets
Do functional plans (lots, patients, sites) carry dates ahead of the agency date, in a form you can see?
Why it mattersInternal targets slip months before an agency date. They give you the warning.
A strong answer"Each CMC and clinical owner sets targets, and they sit beside the agency date."
7
Who signs what
Is it written down who confirms a new entry, who changes a date and who closes an item?
Why it mattersSoftware proposes and people decide, so the decision rights have to exist before the tool can route to them.
A strong answer"Regulatory lead confirms, compliance countersigns date changes, an item closes only on the agency's letter."
8
Quality and IT sign-off
Have your quality and IT groups agreed how they would assess an AI-assisted tool that touches regulated records?
Why it mattersPart 11 and data integrity questions come up in the first meeting. A named assessor speeds the review.
A strong answer"A risk-based approach agreed, a named validation lead, and a security review process we have used before."
9
An inspector's question · for reflection
If a partner or inspector asked today for everything you have told FDA you would do on one product, how long would the honest answer take, and how sure would you be it was complete?
Why it mattersYour answer lists the gaps. Each gap is a candidate job for software: reading, comparing, watching or drafting.
A strong answerA short, specific list, for example: "every promise with its page, one list across markets, original dates kept, and no item closed before the agency's letter."
0–6
Explore
Build the baseline first: read one product's minutes and responses, time one status table, compare your list with FDA's database, and name an owner for the record.
7–11
Ready to pilot
Run a measured pilot on one product with planted promises, and let your regulatory lead sign every entry.
12–16
Ready to implement
Plan the whole portfolio: every market, signers by kind of decision, RIM and mailbox connections, and validation with your quality group.
22 · Test any vendor
Testing commitment tracking software on your own minutes, with promises you planted
In shortAsk each vendor, us included, the same specific questions. Measure your baseline, test on your own documents with undertakings you already know about, and decide on three numbers. None of these steps commits you to anyone.
Twelve questions on reading, dates, signatures and exit
A
Does it read what your tracker misses?
A1
Does it read the discussion in minutes and your own responses to agencies, as well as approval letters?
Why it mattersThat is where untracked promises sit.
Strong answer · warning sign
A demonstration on your minutes, with each promise's page.
"You enter commitments and we track them."
A2
What does it do with a promise that has no date, or a date tied to an event?
Why it mattersAn invented date is worse than none.
Strong answer · warning sign
Marks it undated, asks a person, and tracks the event.
It fills in a default.
A3
How does it tell a new item from a change to an existing one, or a reminder that creates nothing?
Why it mattersDuplicates and false items erode trust in the list.
Strong answer · warning sign
Shows old and new wording, and the reason.
Everything arrives as new.
B
Will the status words come out right?
B1
Does it keep the original schedule apart from the current one, and apply the pediatric deferral extension rule?
A setting per item, reviewed by your regulatory group.
All rows go in one table, with no way to split them.
B3
How does it count the 180-day clock, and who decides the convention?
Why it mattersA small drift becomes a late report.
Strong answer · warning sign
You choose; the choice is recorded.
A yearly recurring reminder.
C
Who decides, and can you prove it?
C1
Can anything reach the record, change a date or close an item without a named person's signature?
Why it mattersPeople answer for the record.
Strong answer · warning sign
No. Signatures carry a meaning, and date changes take two.
Auto-close when a report is filed.
C2
What controls support 21 CFR Part 11 and Annex 11, and what validation evidence do you give us?
Why it mattersNo vendor can make you compliant; only you can.37
Strong answer · warning sign
A list of controls and documents, and SOC 2 reports you can read.
"We are Part 11 certified."
C3
Can every date open the exact page it came from, a year from now?
Why it mattersAn inspector or partner asks for the source.
Strong answer · warning sign
One click to the page, with the passage marked.
A link to a folder.
D
What happens with your data and your exit?
D1
How does it handle translated local documents and keep the link to the original?
Why it mattersA condition's meaning can change in translation.
Strong answer · warning sign
Both versions linked, and a named local owner signs.
Only the translation is kept.
D2
How does it work with our RIM: read from it, write to it, or duplicate it?
Why it mattersTwo systems of record is a new problem.
Strong answer · warning sign
A clear statement of which system holds what.
"You won't need your RIM."
D3
Is our correspondence used to train models, and what do we take with us if we leave?
Why it mattersAgency correspondence is confidential.
Strong answer · warning sign
A contractual no, plus an export of records, history and signatures.
Vague terms, and a data dump with no history.
A one-product pilot in five steps
Read one product's file by hand. Every set of minutes and every response. Write down each undertaking. That list is your answer key.
Time your baseline: one status table and five letters, by step, including the emails.
Plant some tests: copy five documents and add promises you know about, including an undated one and one in a translated file.
Run in parallel for five weeks on live letters, with your regulatory lead signing every entry and one real status table drafted.
Decide with three numbers: undertakings found against your key, false items per document, and hours to a signed status table.
A twelve-week pilot on one product ends with a decision on three numbers
Your teamVendor
Read one product's file, build the key
Time one status table and five letters
Connect the archive, set rules and signers
Read the file, compare with the key
Parallel run with live letters
Draft a real status table
Measure and decide
Week 04812
Illustrative · replace with your own numbers
Show the numbers
Activity
From
To
Read one product's file, build the key
0
3
Time one status table and five letters
0
2
Connect the archive, set rules and signers
1
4
Read the file, compare with the key
4
6
Parallel run with live letters
5
10
Draft a real status table
8
10
Measure and decide
10
12
Undertakings found, false items and hours to a signed status table, plus two checks
Measure
How
Why
Undertakings found
Found ÷ on your key, split by letters, minutes, responses and translated files
One percentage hides a weakness in minutes
False items
Items your lead rejects, per document
A tool that flags every sentence catches every promise
Dates and wording right first time
Sample 100 entries against their pages
The wording is the record
Hours to a signed table
Stopwatch, including owners' time
The cost case rests on it
Warning lead time
Days between a slip being raised and the agency date
Early warning is the point of tracking
The working-session questions: nine for your regulatory, quality and IT leads
Bring regulatory affairs, regulatory operations, the EU lead, CMC, clinical, compliance, quality and IT into one room.
1
What counts, and who owns it
1
What will we treat as a promise: only dated sentences, or any undertaking?
Why it mattersThis rule decides how many items appear.
Strong answer · warning sign
A written rule with examples.
"We'll know it when we see it."
2
Do we track recommendations and CMC items on the same record as PMRs?
Why it mattersA list that leaves them out has the blind spots of the public one.
Strong answer · warning sign
Yes, with types that keep them apart.
Separate lists by department.
3
Who owns an item during a transfer or after an acquisition?
Why it mattersThat is when owners vanish.
Strong answer · warning sign
A named step in the deal checklist.
Found out at the next annual report.
2
Quality and validation
4
Is this tool in Part 11 scope, and on what reasoning?
Why it mattersThe answer sets the validation effort.37
Strong answer · warning sign
A written assessment by your quality group.
An assumption either way.
5
How does our reading of FDA's draft AI guidance apply to this use?
Why it mattersIts scope turns on the effect on patients, quality and study reliability.36
Strong answer · warning sign
A short risk memo, reviewed once a year.
No one has read it.
6
What sampling check will we run on the tool's output once it is live?
Why it mattersAccuracy can drift with new document types.
Strong answer · warning sign
A quarterly sample against the page.
Trust it after the pilot.
3
Operating it
7
Which system holds the official date when the tool and our RIM disagree?
Why it mattersA disagreement will happen.
Strong answer · warning sign
One named system, and a reconciliation step.
Whichever someone looks at.
8
What lead times suit each kind of item? A 24-month stability pull needs more than 90 days.
Why it mattersAn alert after the work should have started helps no one.
Strong answer · warning sign
Lead times by type, plus internal targets.
One setting for everything.
9
How often do we compare our list with FDA's public database?
Why it mattersIt refreshes quarterly, and it is what the outside world sees.2
Strong answer · warning sign
Quarterly, with an owner.
Never.
23 · Questions people ask
Postmarketing requirements and commitments: sixteen questions regulatory teams search
In shortEach answer stands alone, so you can send one to a colleague.
What is a postmarketing commitment?
A postmarketing commitment, or PMC, is a study or clinical trial that a drug or biologic company agrees in writing to run after approval, where no statute or regulation requires it. FDA usually lists it in the approval letter with milestone dates. Many PMCs must be reported on each year, and FDA tracks them in a public database, except those on chemistry, manufacturing and controls.1
What is the difference between a PMR and a PMC?
A postmarketing requirement (PMR) is a study a statute or regulation makes the company run, under section 505(o)(3), the Pediatric Research Equity Act, accelerated approval or the animal efficacy rule. A postmarketing commitment (PMC) is a study the company agrees to in writing without such a requirement. Missing a PMR can bring enforcement; a PMC has no penalty statute behind it, though both are reported and FDA tracks both.1
What is post-marketing commitment tracking?
Post-marketing commitment tracking is keeping every postmarketing requirement and commitment, EU obligation, local approval condition and promise on one record, with the agency's exact words, dates, owners and status, until the agency confirms each one is done. The work includes reading letters and minutes, alerting owners ahead of dates and compiling status reports. Teams do it in spreadsheets, in regulatory information management systems or with software that reads the documents.
When is the annual status report due?
An annual status report on postmarketing studies is due within 60 days of the anniversary of the U.S. approval of the original application, or on an alternate date FDA has granted in writing. Section 506B asks for the first report within one year of approval and annually after that. A product approved on October 21 has a report due by December 20 each year.4,7,1
What goes in a status report under 21 CFR 601.70 or 314.81?
A status report gives, for each study, the applicant, the product, the application and supplement numbers, the approval date, the date of the commitment, a description, the schedule, the current status and an explanation. The status must be one of pending, ongoing, delayed, terminated or submitted. The explanation covers things such as enrollment and the reason for any schedule change.4,5
Do CMC commitments go in the annual status report?
FDA's fiscal 2024 report says the status of PMCs on chemistry, manufacturing and production controls is not required under 21 CFR 314.81(b)(2)(vii) and 601.70, and FDA's public database leaves them out. For NDAs, section 314.81(b)(2)(viii) covers CMC and stability studies the applicant agreed to. Keep them on your own list and report them by the route your approval letter names.5,1
What does delayed mean for a PMR?
Delayed means the study is behind its original schedule. It is measured against the original schedule even if you have told FDA a new plan, so moving a date usually leaves the status as delayed. The exception is a granted pediatric deferral extension, where the new date counts as the original due date.4,1
What is a 180-day progress report?
Under section 506B(a)(2), a sponsor of a drug on accelerated approval must report on its confirmatory trial no later than 180 days after approval and at least every 180 days after that. FDA must post the information promptly on its website. FDA's fiscal 2024 report describes the first report 180 days after approval, with a 60-day grace period, and the next with the annual status report, both every year.7,1
What happens if a postmarketing requirement is late?
FDA's public data shows the item as off schedule. For a section 505(o)(3) study, falling behind the original schedule or failing to report is a violation unless you show good cause, and civil money penalties can reach $377,701 per violation, the 2025 level HHS keeps for 2026. An accelerated approval can face expedited withdrawal when a required study is not run with due diligence. Since a February 2026 law, a PREA failure from August 2, 2026 can bring action under section 303, the penalties section of the FD&C Act, if the company showed a lack of due diligence.1,19,30,9,31
What is FDA's postmarketing requirements and commitments database?
It is FDA's public, searchable, downloadable list of postmarketing requirements and commitments, showing the applicant and the status of each study FDA has verified for posting, open or closed in the past year. FDA refreshes it around the end of January, April, July and October. It leaves out commitments on chemistry, manufacturing and controls, so it cannot stand in for a company's own list.1,2
Are promises in FDA meeting minutes binding?
FDA's guidance says its minutes are the official records of meetings, so a sentence such as "the sponsor agreed to submit" is on the record unless you objected through the disagreement route. No rule we found sets a specific penalty for a promise in minutes. Treat each as a dated duty anyway: the reviewing division will expect it, and a later supplement may depend on it.10
What are EU specific obligations?
Specific obligations, coded SOB, are duties imposed on conditional marketing authorisations and those granted under exceptional circumstances. They sit in Annex II.E of the Commission decision, with due dates. A conditional authorisation is renewed each year, with the application filed at least six months before expiry and a report on the remaining obligations.23,17
How do you find promises in minutes that were already filed?
Read each set of minutes and every response to an agency for phrases such as "the sponsor agreed to", "will submit" and "commits to", in the discussion as well as the action items. Compare each with your list. Software can do the first pass and show each sentence with its page; a regulatory lead decides which ones count.
Can AI track regulatory commitments?
AI can read letters and minutes, propose entries with their pages, compare them with a register, watch dates and draft status text. It can miss or misjudge a sentence, so measure it on documents where you already know the answers, and keep a person's signature on each entry. FDA's January 2025 draft AI guidance does not address operational uses that have no effect on patient safety, drug quality or study reliability; have your quality group assess yours.36
Can commitment tracking software be Part 11 certified?
No. 21 CFR Part 11, FDA's rule on electronic records and signatures, can't be certified for a product. It sets requirements for your electronic records and signatures, such as time-stamped audit trails and signatures that show the name, the time and the meaning. A vendor can offer controls that support your compliance and evidence for your validation; the assessment remains yours.37
Does Botminds replace our RIM system?
No. Botminds reads correspondence from your registrations archive, mailbox and document repository, and gives your team a working commitments register. Your regulatory information management (RIM) system stays the system of record. Agents propose; your regulatory lead signs each entry, and a commitment closes only when the agency confirms it.
24 · One-page summary
Post-marketing commitment tracking on one page: the method, the clocks and 14 terms
Print this page
In shortThe whole guide on one screen: the method, the rules and clocks as of November 2026, the readiness bands and the terms.
The method
Read every letter, set of minutes and response, discussion included.
Copy each undertaking exactly, with its page, type and every date.
Compare with the record: new, changed, status event or nothing new. Never overwrite.
Name a regulatory and a functional owner; set internal targets ahead of the agency date.
Keep the original and current schedule side by side.
Link the same study across markets.
Report on each clock, with the agency's status word and evidence; a person signs.
Close only on the agency's letter.
The clocks
Annual status report: within 60 days of the U.S. approval anniversary.4,5
Pediatric deferral extension: ask at least 90 days before it expires.1
EU conditional authorisation: renewal at least six months before expiry.23
FDA minutes: within 30 calendar days of the meeting.10
Readiness: score 0–2 on eight questions: 0–6 explore · 7–11 pilot · 12–16 implement.
FDA's latest numbers, as of September 30, 2024: 1,636 open PMRs, 30% off schedule; 386 open PMCs, 20% off schedule; 78% of status reports on time.1 As of November 2026: formal meetings guidance final, August 2026 · PREA failures open to section 303 action under a February 3, 2026 law · EU pharma package not yet law · draft Annex 22 not final.
14 terms
PMR
A postmarketing requirement: a study a statute or regulation makes the applicant run.
PMC
A postmarketing commitment: a study the applicant agrees to in writing.
Promise
This guide's word for an undertaking found only in minutes, a response or an email.
Annual status report
The yearly report on each open PMR and PMC.
Original schedule
The first agreed dates; status is judged against them.
Delayed
Behind the original schedule.
Fulfilled · Released
Closed by FDA's letter: terms met, or the duty lifted.
Section 505(o)(3)
The 2007 FDAAA power under which FDA requires postmarketing studies.
PREA
The Pediatric Research Equity Act; its studies can be deferred.
Accelerated approval
Approval on an early measure, with a confirmatory trial owed.
Specific obligation (SOB)
An EU duty in Annex II.E of a conditional or exceptional circumstances authorisation.
Conditional marketing authorisation
An EU approval valid for one year, renewed annually.
CMC
Chemistry, manufacturing and controls: how a product is made and tested.
RIM
Regulatory information management system: the record of registrations and submissions.
25 · Sources
Sources
Accessed November 2026. Regulatory status statements are as of November 2026.
FDA, "Report on the Performance of Drugs and Biologics Firms in Conducting Postmarketing Requirements and Commitments, Fiscal Year 2024" (data as of September 30, 2024; Federal Register notice April 24, 2026). fda.gov
FDA, Postmarketing Requirements and Commitments searchable database. accessdata.fda.gov
FDA, "Postmarketing Requirements and Commitments: Introduction", content current as of August 9, 2024. fda.gov
21 CFR 601.70, "Annual progress reports of postmarketing studies", current in the eCFR as of October 30, 2026. ecfr.gov
21 CFR 314.81(b)(2)(vii) and (viii), annual report content for NDAs and ANDAs, current in the eCFR as of October 30, 2026. ecfr.gov
FDA, "Postmarketing Requirements and Commitments: Status and Fulfillment Categories", content current as of August 9, 2024. fda.gov
FD&C Act section 506B, 21 U.S.C. 356b, "Reports of postmarketing studies", U.S. Code 2023 edition. govinfo.gov
FD&C Act section 505B, 21 U.S.C. 355c, added by Public Law 108-155, December 3, 2003, U.S. Code 2023 edition. govinfo.gov
Public Law 119-75, Consolidated Appropriations Act, 2026, section 6602, "Ensuring Completion of Pediatric Study Requirements", enacted February 3, 2026. govinfo.gov
FDA, "Formal Meetings Between the FDA and Sponsors or Applicants of PDUFA Products", final guidance for industry, August 2026. fda.gov
Health Canada, "Consultation: Draft guidance on terms and conditions for human and veterinary drugs", December 12, 2025 (closed February 10, 2026). canada.ca
21 CFR 601.28, annual reports of postmarketing pediatric studies, current in the eCFR as of October 30, 2026. ecfr.gov
FDA, "Postmarketing Studies and Clinical Trials: Determining Good Cause for Noncompliance with Section 505(o)(3)(E)(ii)", draft guidance, July 2023. fda.gov
FDA, "Accelerated Approval and Considerations for Determining Whether a Confirmatory Trial is Underway", draft guidance, January 2025. fda.gov
European Parliament, Legislative Observatory, procedure file 2023/0131(COD), "Awaiting Parliament 2nd reading", read November 3, 2026; Council position published October 1, 2026. europarl.europa.eu
Barnes & Thornburg, "The EU Pharma Package: What U.S. Companies Need to Know", 2026. btlaw.com
EMA, "Post-authorisation measures: questions and answers", last updated March 27, 2026, listed in the agency's post-authorisation guidance. ema.europa.eu
FDA, "Accelerated Approval Program", content current as of August 25, 2026. fda.gov
FD&C Act section 506, 21 U.S.C. 356, including subsection (c), accelerated approval, U.S. Code 2023 edition. govinfo.gov
HHS Office of Inspector General, "Delays in Confirmatory Trials for Drug Applications Granted FDA's Accelerated Approval Raise Concerns", OEI-01-21-00401, September 2022. oig.hhs.gov
EMA, "Conditional marketing authorisation". ema.europa.eu
Commission Regulation (EC) No 507/2006 of March 29, 2006, on conditional marketing authorisation. legislation.gov.uk
EMA, "Renewal and annual re-assessment of marketing authorisation", post-authorisation procedural advice, linked documents updated October 6, 2026. ema.europa.eu
EMA, "Conditional marketing authorisations give patients access to important new medicines earlier", January 23, 2017, covering 2006 to June 2016. ema.europa.eu
EMA, "Scientific guidance on post-authorisation efficacy studies". ema.europa.eu
MHRA, "Conditional marketing authorisations, exceptional circumstances marketing authorisations and national scientific advice from January 1, 2021", updated March 11, 2025. gov.uk
Health Canada, "Guidance Document: Notice of Compliance with Conditions (NOC/c)", revised September 16, 2016. canada.ca
Swissmedic, "Temporary authorisation for human medicinal products", guidance ZL109_00_001e. swissmedic.ch
TGA, "Applying for provisional registration extension or transition to full registration". tga.gov.au
45 CFR 102.3, civil monetary penalty inflation adjustments table, row for 21 U.S.C. 333(f)(4)(A)(i), read in the eCFR as of October 30, 2026; 2025 adjustment, 91 FR 3665, January 28, 2026. ecfr.gov
HHS, "No Adjustment to HHS Civil Monetary Penalty Amounts for 2026", Federal Register document 2026-21524, scheduled for October 21, 2026. federalregister.gov
K. Karst, "The Dark Side of PREA", FDA Law Blog, March 9, 2026, on Public Law 119-75, section 6602. thefdalawblog.com
FDA, the same report for Fiscal Year 2023 (90 FR 23056, May 30, 2025). fda.gov
FDA, the same report for Fiscal Year 2022 (Federal Register notice April 23, 2024). fda.gov
FDA, "Postmarketing Requirements and Commitments: Reports", content current as of August 19, 2026. fda.gov
FDA, "Considerations for the Use of Artificial Intelligence to Support Regulatory Decision-Making for Drug and Biological Products", draft guidance, January 2025. fda.gov
21 CFR Part 11, sections 11.10(e) and 11.50, current in the eCFR as of October 30, 2026. ecfr.gov
FDA, "Electronic Systems, Electronic Records, and Electronic Signatures in Clinical Investigations: Questions and Answers", final guidance, Federal Register October 2, 2024. govinfo.gov
FDA, "Computer Software Assurance for Production and Quality Management System Software", guidance, February 3, 2026 (replaces the September 24, 2025 issue). fda.gov
European Commission, EudraLex Volume 4, draft Annex 22 "Artificial Intelligence", consultation text, July 2025. health.ec.europa.eu
European Commission, stakeholders' consultation on EudraLex Volume 4, Chapter 4, Annex 11 and new Annex 22, July 7 to October 7, 2025. health.ec.europa.eu
FDA and EMA, "Guiding principles of good AI practice in drug development", content current as of January 14, 2026. fda.gov
EMA, "Reflection paper on the use of Artificial Intelligence (AI) in the medicinal product lifecycle", current version first published September 30, 2024. ema.europa.eu
MHRA, "Guidance on GxP data integrity", March 9, 2018, updated September 27, 2021. gov.uk
ISPE, "GAMP Guide: Artificial Intelligence", July 2025. ispe.org
S. Pearce and T. Nietsch, "EU Digital Omnibus on AI Enters into Force", National Law Review, July 31, 2026, on Regulation (EU) 2026/1744. natlawreview.com
Next step
See it on your own approval letters and minutes.
Explore the solution, or bring one product's letters, minutes and responses, and we will put every promise on one timeline with you, each date linked to its page.
We use essential cookies to make this site work, and cookieless, anonymised analytics to understand how it's used. "Accept all" also turns on Google Analytics, which sets cookies. Privacy policy