Maintenance and Inspection Deferral Management demo
Safety-critical deferrals judged with every safeguard they lean on, so the technical authority sees what else on the barrier is weak. 1:23
What the demo shows
Case file for each deferred safety-critical task: risk, expiry, cumulative effect, sign-off.
Agents draft each request, read its risk assessment for the safeguards it relies on, check those against today's records, and show the overlap on a calendar by barrier. If an assessment turns out false, the rank is set again and each gap covered before anyone signs. High risk goes onshore, and agents never move a date.
Transcript
- Maintenance and Inspection Deferral Management gives each deferred safety task a case file for offshore teams.
- A regulator faulted one operator for ignoring cumulative impact.
- DR-0388 asks a second 60 days on a shutdown valve test among 186 open deferrals.
- The agent checks each safeguard against today's records.
- Two are false. Gas detectors and proven, firewater pumpy out.
- Three protections and proven or out for 19 days.
- So the rank rises to high and each gap gets covered.
- The technical authority grants 14 days with two conditions.
- The installation manager opens the records and countersigns.
- Then the onshore asset manager opens them and signs.
- Detectors first cuts the overlap from 19 days to 12.
- Built on Botminds: agents, data, screens, and governance on one platform.
Transcribed from the film’s narration. Captions are on the player.