Maintenance and Inspection Deferral Management demo

Safety-critical deferrals judged with every safeguard they lean on, so the technical authority sees what else on the barrier is weak. 1:23

What the demo shows

Case file for each deferred safety-critical task: risk, expiry, cumulative effect, sign-off.

Agents draft each request, read its risk assessment for the safeguards it relies on, check those against today's records, and show the overlap on a calendar by barrier. If an assessment turns out false, the rank is set again and each gap covered before anyone signs. High risk goes onshore, and agents never move a date.

Transcript

  1. Maintenance and Inspection Deferral Management gives each deferred safety task a case file for offshore teams.
  2. A regulator faulted one operator for ignoring cumulative impact.
  3. DR-0388 asks a second 60 days on a shutdown valve test among 186 open deferrals.
  4. The agent checks each safeguard against today's records.
  5. Two are false. Gas detectors and proven, firewater pumpy out.
  6. Three protections and proven or out for 19 days.
  7. So the rank rises to high and each gap gets covered.
  8. The technical authority grants 14 days with two conditions.
  9. The installation manager opens the records and countersigns.
  10. Then the onshore asset manager opens them and signs.
  11. Detectors first cuts the overlap from 19 days to 12.
  12. Built on Botminds: agents, data, screens, and governance on one platform.

Transcribed from the film’s narration. Captions are on the player.