- Sees
- The flagged lines, the sum, the drafted letter and its sources
- Signs
- Takes, changes or rejects each finding, with a reason
A joint venture audit year with 57 days left and one rate nobody approved
Support for one venture arrived 20 days late. The auditor has the rest of the year to test it, and the bill year shuts in under two months. This is that day, on the working screens.
demoVentures, operators, people and dollar figures here are sample data.
- 0157 days left
2024 bills: $412.0M billed, $61.0M still untested
Joint venture auditorEach audit year is a bar of dollars, with the untested part drawn as ice melting toward its date. Below it, the year's spend is a map of blocks by charge type, sized by dollars and shaded by findings. The year before shut with $291.8M never tested, after $96.4M was sampled by hand. Nobody wants a second bar like that.
- 02Before the run
Picked as a date, the year shuts on screen
Non-operated ventures managerThe manager asks what is at stake in dollars. Choosing the last day of the year draws 2024 as shut: every untested dollar and every finding not yet issued is marked as lost, and the line under the bars says this is a preview and nothing has changed. Back on today's date, the auditor starts work.
- 03The run
$52.8M tested in one run, and water disposal turns red
Joint venture auditorThe agents load the late support, tie its lines to the bill totals and test each one against the checked terms for that agreement. Tested dollars rise to $403.8M. Only $8.2M is left, waiting on two operators who have not sent support. One block of the map goes red: water disposal, with $1,976,172 in findings on the 2024 bills.
- 04The finding
14 bills at $0.89 a barrel against $0.62 in the amendment
Joint venture auditorThe finding opens on the sum, bill by bill: barrels, billed rate, agreed rate and the share. The operator's affiliate raised the rate by letter to the operator, with no copy to partners. Of $2,307,555, the part on 2024 bills shuts first; the two 2025 bills ride in the same exception rather than waiting a year for a second letter.
- 05The letter
A letter that names the bills, the amount, the clause and the claim
Joint venture auditorThe drafted exception states what was billed, cites the paragraph of the amendment, gives the barrels and the gap, and claims the adjustment. It asks the operator to produce any approval it holds and reserves rights on lines not yet tested. Four checks under it confirm the bills are named, the amount stated, the clause cited and a claim made, so it cannot go out as a general protest.
- 06Before taking it
The operator's likely answer, before it arrives
Joint venture auditorThe injection line was under repair, so water may have been hauled at a real extra cost. The screen says so plainly. That still needed the parties' approval under the amendment, but it may shape a settlement later. The auditor reads it, keeps the claim as drafted and takes the finding, which sends it to the audit manager.
- 07Before signing
41 ballots, 16 minutes and 212 AFEs, and none approves the rate
Audit managerThe sign button stays off until the manager has opened the amendment, the rate letter and the approvals search himself. The search states what it covered and what it means: no approval was found in the records the company holds, which does not prove none exists. That is why the letter asks the operator to produce one.
- 08Signed
Signed and dated 57 days before the window shuts
Audit managerOnce the manager signs, the signature sets the date on the letter and the finding reads issued. Whoever took a finding cannot sign it; nobody signs their own take. Agents drafted each word but cannot sign, date, issue or settle, and the audit file records who opened which source before signing.
- 09After signing
The operator sees issued exceptions and nothing else
Operator's partner contactThe partner contact at the operator sees only what was signed and issued on that one agreement: the exception with its letter, and an older one already part accepted. There are no drafts, no questions and no other ventures. Each can be accepted, denied with a reason, or answered with a request to meet.
- 10After issue
A reply clock set by the form behind each agreement
Joint venture auditorWith the new exception, eight are issued, $3,746,014 claimed in all. On this form the operator has 180 days to reply in writing. Other rows show an offer waiting for a person, a denial with no support behind it, an accepted claim with no credit yet on a later bill, and a part acceptance where a resolution meeting can be called.