SystemRegulatory Affairs

The complete guide · November 2026

IDMP and ePI product data, explained.

Every medicine sold in the EU has its facts written in approved documents: its strength, its pack sizes, the factory that releases each batch. Europe's medicines regulator now wants those facts as coded data in one shared record, built on a family of standards called IDMP, and companies are starting to publish the leaflet inside the box as data too, known as electronic product information, or ePI. The first deadline for most products is December 2026.

This guide is for anyone who keys, checks, signs or pays for this data: regulatory data stewards, regulatory operations leads, labeling managers, master data and supply teams, and the leaders deciding whether to automate the work. No background needed.

See one case, screen by screen →
Watch with transcript →
A quick example · fictional

Imagine you are a regulatory data steward at Veltara Therapeutics, a mid-sized drug company in the Netherlands. It is Tuesday, October 13, 2026. The company holds 412 products in 21 European countries, and the 381 outside the EU's critical-medicines list must have their manufacturer data with the European Medicines Agency (EMA) by the end of December, 79 days away.

Today's product is Narvexa 50 mg film-coated tablets, sold in 9 countries. Four approved documents describe it, 23 pages in all: the prescriber's summary, the patient leaflet, the carton, and the quality section of the dossier.

You copy the pack sizes into the record and stop. The summary, section 6.5, lists packs of 28, 56 and 98 tablets. The dossier, section 3.2.P.7, registers two.

Summary (SmPC v4) · section 6.5
Approved
Mar 14, 2026
Container
"Aluminium/aluminium blisters"
Pack sizes
28, 56 and 98 tablets
Dossier · Module 3.2.P.7
Sequence
0007
Container
Cold-formed foil blister
Pack sizes
28 and 56 tablets
3 pack sizes in the summary2 in the dossier and leafletone of them should not reach the EU record.

The container wording matches nothing on EMA's list of terms, either. And the leaflet writes the batch release site as "Voorbeeldweg 41", where EMA's organization list holds "Voorbeeldweg 41-43".

Careful data work catches the pack nobody registered, the address written two ways and the wording EMA cannot read, before they go into the record other EU systems read.

IDMP and ePI product data readiness guide
Part A · Understand it

IDMP compliance from the ground up: EMA's deadlines, SPOR terms, approved documents and ePI

The standard, the dates, the lists of terms, the documents, the errors and the market, explained without selling anything. If you are new to regulatory data, start here.

01 · In plain words

IDMP data explained: one medicine's approved facts, written once, in codes every EU system can read

When a regulator approves a medicine, it approves documents. There is a summary for prescribers (the summary of product characteristics, or SmPC), a leaflet for patients, the wording on the carton, and a long technical dossier whose quality part, Module 3, explains how the medicine is made. Those documents are written for people. A person can read "yellow, round, biconvex film-coated tablet" and know what it means. A computer that tracks medicine shortages across 30 countries cannot, unless someone has turned that sentence into a code.

For years, the same tablet has been described in different ways in different national systems. The EU's answer is one shared record for every medicine, the Product Management Service, or PMS, which the European Medicines Agency (EMA) calls the common source of product master data for all EU medicines.1 Its shape comes from a family of ISO standards called Identification of Medicinal Products, or IDMP. PMS is one of four EMA data services known together as SPOR: substances, products, organizations and referentials, the controlled lists of terms such as dose forms and routes of use.2

Much of the record was loaded from older databases, with parts left empty. Packaging material and manufacturing operations are among the blanks.3 So the companies that hold each medicine's license to sell, its marketing authorization, have to fill them in, a task called enrichment. The facts are already approved. They sit in different documents with different owners, in free text, and the documents do not always agree. Someone has to find each value, match it to the exact EMA term, settle any conflict, sign, and send it.

A second project uses the same facts. Electronic product information (ePI) is the approved leaflet, summary and label as structured data in a health-data format called FHIR, so a phone can show the current leaflet when a patient scans the box.4 The more cleanly a company holds its product data, the less of this work it does twice.

One tablet's facts, from approved documents to a shared EU record

  1. The regulator approves the documentsNarvexa's summary and leaflet, version 4, are approved on March 14, 2026. The dossier and carton match the approval, or should.
  2. The data steward finds the approved versionsFour documents, 23 pages, owned by labeling, chemistry, manufacturing and controls (CMC), and supply.
  3. Each fact becomes coded dataThe steward fills the record, matches each value to its EMA term and settles conflicts. This is where the 98-tablet pack is caught, or copied into the EU record.
  4. Someone signs and submits to EMAThe steward signs. The operations lead sends. The record is checked, and anything wrong comes back.
  5. The record has to stay trueEvery later change to the product can change the data. Other EU systems read it, and shortages teams rely on it.

Step 3 is the subject of this guide. The people, companies and figures in this example are fictional.

Why the December 2026 deadline surprises IDMP teams: four things newcomers miss

Most critical-list products had no manufacturer data four weeks out

On June 1, 2026, four weeks before the critical-medicines deadline, EMA showed that 72.7% of products on that list had no manufacturer data in PMS.5

EMA picks the document that leads

The SmPC is "the main referring document" for data entry. The dossier's Module 3 can be used to harmonize values when documents differ on existing products.6 That order surprises teams who assume the dossier always wins.

A new pack size still takes the old road

New pack sizes go in through XEVMPD, EMA's older product database, and load into PMS from there. Manufacturer data and structured pack details go directly into PMS.3

The address must already exist at EMA

A manufacturer is reported by its location code in EMA's organization list. If the site or its address is wrong there, you ask EMA to fix the list first.6,7

IDMP, PMS, SPOR and ePI in one line each

IDMP

Five ISO standards that describe a medicine in data: substance, dose form, units, pharmaceutical product, medicinal product.

PMS

EMA's Product Management Service, the EU's shared record of medicines, shaped by IDMP.

SPOR

EMA's master data: substances (SMS), products (PMS), organizations (OMS) and term lists, or referentials (RMS).

ePI

The authorized summary, label and leaflet as structured FHIR data, published alongside the usual documents.

Fourteen terms are defined in the one-page summary.

02 · What IDMP is

The ISO IDMP standards and how EMA turned them into SPOR and the Product Management Service

In shortIDMP is five ISO standards. EMA applies them through four data services, and the rules for filling them in are in the EU IDMP Implementation Guide. Chapter 2 of that guide, version 2.5 from August 2026, is the document that says what each field means.

The five standards fit together like nested boxes. A substance sits inside a pharmaceutical product, which is the form the patient takes. That sits inside a medicinal product, the thing a company is authorized to sell, with its name, packs and manufacturers.2 Articles 25 and 26 of Commission Implementing Regulation (EU) No 520/2012 oblige EU member states, authorization holders and EMA to use them. Submitting data on authorized medicines to EMA has been mandatory since July 2012, in an older format.2

ISO standardWhat it coversOn Narvexa, the fictional tablet
ISO 11238SubstancesSelvoranib hydrochloride; microcrystalline cellulose
ISO 11239Dose forms, units of presentation (the countable unit, such as one tablet), routes, packagingFilm-coated tablet; tablet; oral use; blister
ISO 11240Units of measurementMilligram
ISO 11616Regulated pharmaceutical product information50 mg per tablet, by mouth
ISO 11615Regulated medicinal product informationName, holder, packs of 28 and 56, manufacturers

The four SPOR services behind every coded value

S · SMS

Substances

Names and codes for active ingredients and excipients, the inactive ingredients. A person selects the substance's code; a search on a synonym returns the preferred term.8 EMA offers no SMS user interface yet.9

P · PMS

Products

The product record itself. Its user interface went live read-only in May 2024, added products authorized outside EMA's central route that September, and gains editing in stages.9

O · OMS

Organizations

Validated names and addresses, each with an organization ID and a location ID. OMS does not define the role an organization performs; that belongs to the product record.7

R · RMS

Referentials

Controlled term lists: dose forms, routes, containers, materials, legal status. Anyone can browse them, and changes are requested through EMA.10

How many fields a PMS product record holds

EMA's FAQ puts PMS at around 180 data elements, against around 50 attributes in XEVMPD.3 Its current data-element guide runs to 232 pages, and many elements repeat for every ingredient, package and manufacturer.6 One consultancy counted 250 to 300 fields per product in 2015.11 No regulator publishes an average for a real product, so count yours once you have mapped one.

PMS asks for more than three times what the older database held

Data elements in PMS against attributes in XEVMPD, approximate, from EMA's FAQ

PMS180
XEVMPD50

Source 3,6 · EMA says around for both figures. Elements repeat for every ingredient, package and manufacturer, so a real record runs longer.

Show the numbers
DatabaseFields (around)
PMS180
XEVMPD50
03 · EMA's deadlines

EMA's PMS data enrichment deadlines: June 2026, December 2026 and June 2027

Status as of November 2026

In shortEnrichment applies to products that are not centrally authorized, meaning they did not go through EMA's single EU-wide route. Critical-list products, those on the EU's Union list of critical medicines, were due at the end of June 2026. All others owe manufacturer data by the end of December 2026 and pack sizes by the end of June 2027. This guide calls each of these deadline groups a lane. EMA moved two of those dates in September 2025 and has asked industry associations for assurance that the new dates will hold.

Two enrichment deadlines remain, and the older database runs on for years
  1. Sep 10, 2025EMA moves two deadlines

    Critical-list data moves from end 2025 to June 2026; other pack sizes from December 2026 to June 2027.

  2. End of Jun 2026Critical-list products

    Manufacturer data and structured pack details for non-centrally authorized products on the Union list.

  3. Jun 2026Public PMS API beta

    Open for testing. A final version is expected in early 2027.

  4. End of Dec 2026Manufacturer data, all other products

    Through the PMS Product User Interface or API.

Source 9,12,5,3

Show the numbers
WhenWhat
Sep 10, 2025EMA moves two deadlines
End of Jun 2026Critical-list products
Jun 2026Public PMS API beta
End of Dec 2026Manufacturer data, all other products
End of Jun 2027Pack sizes, all other products
Mar 2029European Health Data Space
2029Applications through PMS
2030+XEVMPD retired
DocumentWhat it asks of youStatus
EMA enrichment timetableThe three deadlines above, by product group and channel.9,12Current. Last changed September 2025; a service provider's October 2026 update says EMA's roadmap shows no further extension13
EU Implementation Guide, Chapter 2, version 2.5What each field means and which document it comes from. "The Manufacturer shall be specified using the location identifier."6August 7, 2026
PMS frequently asked questionsPractical answers: scope, channels, known issues. "The expert view of the Product team", and EMA says it is not an official statement.3September 29, 2026
Regulation (EU) 2022/123 and the shortages platformThe reason for manufacturer data: EMA's shortages platform needs sites and operations so capacity can be reported in a crisis.3,14In force; first full set of platform functions since January 202514
Union list of critical medicinesDecides the first lane. Companies find their products with PMS's dynamic product report.3,15Version 2.1, revision 1, January 202616
ISO IDMP and Article 57 data dutiesUse the standards, and keep authorized product data up to date, under Article 57(2) of Regulation (EC) No 726/2004.3,2In force

Who owes enrichment, and who does not

In scope
  • Products authorized nationally, or through mutual recognition or decentralized procedures, in the EU and EEA. EMA's word for them is "non-CAPs".3
  • All registered manufacturers. Chapter 2 says those not actively used should be submitted too.6 The FAQ adds that, "for the moment", companies report those in the electronic application form.3 Read the two together, and check Chapter 3 of EMA's guide.
Not in this push
  • Centrally authorized products. Their data came across from EMA's own system. Holders review it and keep it current.3
  • UK products. EMA's FAQ says they are out of scope, and enrichment for Northern Ireland is not required.3
Critical medicines, the first lane, are about one product in eight on the EU record

289,520 valid products in PMS on June 1, 2026

Not on the critical list: 88.2%On the Union list of critical medicines: 11.8%
11.8%on the list
  • Not on the critical list88.2%
  • On the Union list of critical medicines11.8%

Source 5

Show the numbers
PartValue
Not on the critical list88.2%
On the Union list of critical medicines11.8%
If you sell in the US. The FDA has no equivalent deadline on its IDMP page, last updated in May 2022. It says the National Drug Code, the Unique Ingredient Identifier and the UCUM units of measure conform to ISO 11615, 11238 and 11240, and that it will keep working on global use of the standards.17 Data built to IDMP travels, but nothing there sets a date.
04 · SPOR term matching

How SPOR data mapping works: free text in a document, one coded term in the record

In shortMost fields do not accept free text. A document's wording has to become a term from RMS, a location from OMS, or a substance from SMS. Often it is a straight match. Sometimes one phrase has to become several terms, and sometimes the list needs changing first.

The film-coated tablet is the easy case. SmPC section 3 says "Film-coated tablet", and RMS has a term with that exact name, code 100000073665.8

The hard cases come from the way documents compress information. A blister described as "aluminium/aluminium" says something a packaging engineer understands and a term list does not. In EMA's own worked examples, the container and its materials are separate values: the container type "Blister" (100000073496), then the materials, such as "Aluminium" (200000003200) and "PVC" (200000003222).8 So one short phrase can become one container and three materials, and only the dossier says which three.

One phrase in the SmPC becomes a container and three materials, and the dossier supplies the materials
  1. 1Read the SmPC

    Section 6.5 says "Aluminium/aluminium blisters".

    SmPC 6.5
  2. 2Set the container

    The container type is the term Blister.

    RMS
  3. 3Open the dossier

    Section 3.2.P.7 describes the layers: polyamide (OPA), aluminium and PVC.

    Module 3
  4. 4Code each material

    Each layer becomes its own material value in the record.

    RMS

Fictional example from this guide · Narvexa, the guide's fictional tablet.

Show the numbers
StepWhat happensWhoTime
Read the SmPCSection 6.5 says "Aluminium/aluminium blisters".SmPC 6.5
Set the containerThe container type is the term Blister.RMS
Open the dossierSection 3.2.P.7 describes the layers: polyamide (OPA), aluminium and PVC.Module 3
Code each materialEach layer becomes its own material value in the record.RMS
In the documentBecomesFromWhat makes it hard
"Film-coated tablet."Authorized dose form: Film-coated tabletRMSLittle. An exact match, once you know the section
"Aluminium/aluminium blisters."Container: Blister. Materials from the dossier's layersRMS, using Module 3.2.P.7The summary leaves out the layers. The dossier has them
"Voorbeeldweg 41, 2399 SS Leiden"One location code for that siteOMSThe list holds "41-43". Same building or another one?
"selvoranib hydrochloride equivalent to 50 mg selvoranib"Ingredient, reference substance and strengthSMSSalt or base, and how the strength is expressed
"Packs of 28 and 56"Two packaged products, each with its unit of presentationXEVMPD, then PMSEach pack is its own record, with its own national number

When EMA's list has no term or the wrong address

You do not type around a missing term. You ask EMA to add or correct it, which takes time you should plan for. OMS change requests now go through the EMA Service Desk, with supporting documents, from someone with a SPOR user role.7 RMS change requests moved to their own portal on October 1, 2025.10

EMA's 2018 overview gave an indicative five working days for validating an OMS request, and warned that requests with missing documents or the wrong request type are rejected.18 We found no current service level, so treat five days as a floor and test it with a real request.

Check before you request. EMA's overview says a physical move is a different request from a correction: you do not update location A into location B.18 A steward who writes "Voorbeeldweg 41" into a change request when the site already exists as "41-43" creates more work, or a duplicate. Search first, and bring the trade register entry or good manufacturing practice (GMP) certificate when you do ask.18
05 · Where each field lives

Which approved document holds which IDMP field: SmPC, leaflet, carton, Module 3 and the eAF

In shortNo single document holds a whole record. Composition is in the SmPC and Module 3.2.P.1, packaging in SmPC 6.5 and 3.2.P.7, sites in 3.2.P.3.1, 3.2.S.2.1 and the electronic application form (eAF). EMA makes the SmPC the main reference and lets Module 3 harmonize existing data where the documents differ.

Manufacturers are the field the SmPC does not hold

Where a steward looks first, by field family

Not usuallyPartlyGoodMain
SmPCLeafletCartonModule 3eAFActive substance and strengthMainPartlyGoodMainGoodExcipientsMainPartlyNot usuallyMainPartlyDose form and routeMainGoodGoodGoodGoodPack sizesMainGoodGoodMainPartlyContainer and materialsGoodPartlyNot usuallyMainPartlyShelf life and storageMainPartlyGoodMainNot usuallyBatch release siteNot usuallyMainNot usuallyMainMainOther manufacturing sites and operationsNot usuallyNot usuallyNot usuallyMainMainLegal status of supplyPartlyNot usuallyGoodNot usuallyGood

Our reading of the sources 6,8,19,20 · Our reading of the section lists in EMA's guide, the QRD template and ICH M4Q. Practice varies by product and country.

Show the numbers
SmPCLeafletCartonModule 3eAF
Active substance and strengthMainPartlyGoodMainGood
ExcipientsMainPartlyNot usuallyMainPartly
Dose form and routeMainGoodGoodGoodGood
Pack sizesMainGoodGoodMainPartly
Container and materialsGoodPartlyNot usuallyMainPartly
Shelf life and storageMainPartlyGoodMainNot usually
Batch release siteNot usuallyMainNot usuallyMainMain
Other manufacturing sites and operationsNot usuallyNot usuallyNot usuallyMainMain
Legal status of supplyPartlyNot usuallyGoodNot usuallyGood

The sections a data steward knows by heart

Field familyIn the product informationIn the dossier
Composition and strengthSmPC 2, SmPC 6.13.2.P.1 Description and composition6,20
Dose form and routeSmPC 3, SmPC 4.23.2.P.120
PackagingSmPC 6.5, leaflet 6, carton3.2.P.7 Container closure system20
Shelf lifeSmPC 6.3 and 6.43.2.P.8 Stability20
ManufacturersLeaflet 6 names the batch release site3.2.P.3.1 and 3.2.S.2.1, and eAF section 2.56

Section numbers follow the current ICH M4Q(R1), the international guideline for the dossier's quality part.20 Its revision, M4Q(R2), is still a draft, and ICH's work plan targets final adoption in June 2027.21

EMA's rule when the SmPC and Module 3 disagree

Chapter 2 says the contents of the eAF, Module 3 and SmPC "shall be aligned, where applicable", and that "the SmPC as authorized/to be authorized is the main referring document for data entry purposes".6 For products already in PMS, where the common content is not aligned, "the information available in the relevant sections in Module 3 can be used to harmonize the values in PMS", as long as confidentiality is kept and no complexity is added.6

Chapter 8 gives the reason, naming four things that happen in older products: different detail across SmPCs, different ways of expressing strength, excipient lists that are not uniform, and different phrasing for national reasons. Its worked example aligns on the most detailed SmPC that matches Module 3.8

Three sums to run on any product: pack size, strength and the deadline

Pack size

Count units of presentation

EMA defines pack size as the total units per unit of presentation: its example is "8 tablets".6 Narvexa's 28-tablet pack is 2 blisters of 14, the 56 is 4 blisters of 14. A 98 would be 7 blisters. Module 3 registers no such thing, so it is a question for the labeling team.

Strength

Separate salt from base

"Selvoranib hydrochloride equivalent to 50 mg selvoranib" means the record's strength is 50 mg per tablet of the base. EMA points to the SmPC and Module 3 as the main references, with presentation strength given where stated.6,8

The deadline

Divide what is left by your rate

Veltara has 381 products in the December lane and 287 ready, so 94 are left. At 14 a week that takes 6.7 weeks. From October 13, it ends on November 29, which leaves 32 days before December 31.

06 · ePI on FHIR

EMA's electronic product information: the EU ePI Common Standard, the roadmap and the pilot

Status as of November 2026

In shortePI is the authorized product information in the FHIR-based EU ePI Common Standard. It starts as a voluntary extra step for centrally authorized medicines, English first, while Word and PDF stay the legal submission. National products follow after a readiness assessment. It becomes mandatory for newly authorized medicines when the new pharmaceutical legislation applies.

ePI reaches centrally authorized medicines first, in three steps, then national products
  1. 2020Key principles

    EMA, the Heads of Medicines Agencies and the Commission publish them. The network later adopts a FHIR-based common standard.

  2. Jul 2023 to Aug 2024Pilot

    Real procedures with EMA and regulators in Denmark, the Netherlands, Spain and Sweden.

  3. Mar 20, 2026Draft roadmap

    Published after the Management Board noted it.

  4. Sep 1, 2026Guidance for applicants

    EMA/199350/2026, applicable from go-live.

  5. Sep 28, 2026Council adopts its position on the pharma package

    Its first-reading position. Parliament's second reading is pending, with an indicative plenary date of November 23, 2026, and publication in the Official Journal follows.

  6. Q4 2026Voluntary: vaccines

    Centrally authorized vaccines, ATC code J07.

Source 4,22,23,24,25,26,27 · ATC codes classify medicines by use. EMA marks the roadmap as a draft, with only the vaccines go-live shown as set. EMA's ePI page, read November 3, 2026, announces no go-live and says its guidance applies from that date.

Show the numbers
WhenWhat
2020Key principles
Jul 2023 to Aug 2024Pilot
Mar 20, 2026Draft roadmap
Sep 1, 2026Guidance for applicants
Sep 28, 2026Council adopts its position on the pharma package
Q4 2026Voluntary: vaccines
H1 2027Voluntary: oncology
H2 2027Voluntary: all centrally authorized
2027 to 2028National products

How an ePI is built inside the FHIR standard

ePI covers Annex I (the SmPC), Annex II, Annex IIIA (the label) and Annex IIIB (the leaflet).25 EMA's implementation guide, release 1.0.0 of September 17, 2026, built on FHIR R5, describes the shape in the picture below.28 EMA's portal lets a company author in its editor, and its guidance also describes importing content through FHIR.25

Inside an ePI, a list points to bundles, and each bundle holds one document's content
  1. 1List

    Indexes the documents of one ePI and carries its metadata.

  2. 2Bundle

    Each document is a bundle.

  3. 3Composition

    Sits inside the bundle and holds the content under its template headings.

  4. 4Binary

    Images are encoded in binary resources.

Source 28

Show the numbers
StepWhat happensWhoTime
ListIndexes the documents of one ePI and carries its metadata.
BundleEach document is a bundle.
CompositionSits inside the bundle and holds the content under its template headings.
BinaryImages are encoded in binary resources.
What the guidance requires once you start
  • Word and PDF still go in the eCTD, the electronic dossier format. ePI "does not negate" that.25
  • During the voluntary phase, English is enough and other languages are optional.25
  • "Once a product's PI is available in electronic format, it will remain electronic in all subsequent variations."22
  • You must keep it aligned with the latest approved version.25
  • ePIs with no procedure number are not published.25
What may still change
  • The QRD template, EMA's required headings and wording for product information: version 10.4 is current, and draft version 11 proposes shorter leaflets, reordered warnings and an optional section 7.19
  • Languages: submission in all languages "is expected to become mandatory in future".25
  • The date it becomes mandatory: EMA's slide says "TBC".5
  • How patients reach it: EMA's draft reflection paper proposes scanning a two-dimensional code on the package.4

What the 2023 to 2024 pilot measured

EMA's pilot took 25 regulatory procedures, and 23 produced an ePI. Of those, 22 ended favorably and all 22 were published.29

Industry participants took 5.2 hours on average to create one, with a range from about 1 hour to 16, against a target of 8. EMA is careful about that number: the ePIs in the pilot "were not notably long or complex".29 The one target only partly met was the editor itself, for adding sections, formatting content pasted from Word, and inserting images and tables.29 EMA's conclusion: no blocking issues, and the network should move toward implementation.29,30

An ePI took about five hours in EMA's pilot, and one took sixteen

Hours to create one ePI at EMA's portal, industry participants, 2023 to 2024

Longest16 hours
Average5.2 hours
Shortest (about)1 hour

Source 29 · EMA's target was 8 hours. The pilot's products were short and simple; yours may take longer.

Show the numbers
MeasureHours
Longest16 hours
Average5.2 hours
Shortest (about)1 hour
07 · Why documents disagree

Why approved documents disagree, and the IDMP data errors that follow

In shortEach document is right for its own history. A variation changes the dossier first, a leaflet lags the summary, an address gets abbreviated, and old products were never written to line up. The errors that reach the record are mostly quiet ones: a value copied from the wrong version, a near-match term, a site written two ways.

Nobody signs a document they know to be wrong. The differences build up because a product lives for decades under many hands. A shelf-life extension goes through as a variation, the change procedure EU rules define, and the dossier section changes. The patient documents follow at the next convenient update. A company merges and its addresses are rewritten in one place. The EU's variation guidelines were reissued in September 2025, which will not undo the history already in your files.31

In one fictional portfolio, the largest group of conflicts traces back to a variation that reached one document first

41 conflicts between approved documents across Veltara's 412 products this quarter

A variation changed Module 3, the SmPC not yet17
Leaflet or label behind the SmPC11
An address written two ways8
Pack sizes registered differently5

Fictional example from this guide · No regulator publishes these shares. Count your own over ten products.

Show the numbers
WhyConflicts
A variation changed Module 3, the SmPC not yet17
Leaflet or label behind the SmPC11
An address written two ways8
Pack sizes registered differently5

Eight errors that reach an IDMP record, and how each one happens

ErrorHow it happensWhat catches it
The wrong versionSomeone copies from a draft or a superseded leaflet in a shared folderRead approved versions only, and record the version on the field
A pack nobody registeredSmPC 6.5 lists a pack that Module 3 does not supportCompare SmPC 6.5, 3.2.P.7 and leaflet 6 per product
Near-match termA steward picks the closest RMS term by eye; a blister loses its polyamide layerRead the materials from 3.2.P.7, and have a second person check
The wrong location codeOMS holds several locations for one company. EMA asks for an individual ticket when an organization or location ID is wrong3Match the operation and address together, using the GMP certificate
A missing operationA site is listed, but quality control or packaging is left off. EMA lists this among the cases that need a ticket3Compare the operations in the eAF with the record
Pack size in the wrong unitA liquid's size is entered in ml, where EMA counts pack size per unit of presentation, such as a vial6A rule per dose form
Duplicate packagesIn countries with more than one official language, one pack appears as several records3Use the same description in the same language in every record for one pack3
A fix in one country onlyThe same wrong wording sits in many products; a steward fixes the one in front of themGroup by identical wording across the portfolio

Chapter 2 asks for discrepancies between the documents to be minimized.6 The record is where you find them. Fixing the document itself happens at its next variation.

08 · What is at risk

What bad product data puts at risk: blocked applications, inspector attention and blind spots in a shortage

In shortEMA's FAQ names the consequences of out-of-date data: the web-based application form stops working for the product, submitted forms can be rejected, and discrepancies go to national inspectors. The bigger stake is what the data is for. In a shortage, EMA needs to know who makes what, and where.

289,520

valid products were in PMS on June 1, 2026. This is the record EMA monitors for quality.5,3

EMA PMS Info-Day, June 2026
15

national authorities had finished mapping their product databases to PMS by June 2026, which shows the regulators are getting ready to use this data.5

EMA PMS Info-Day, June 2026
2029

is when EMA's roadmap slide shows applicants submitting product data through PMS, subject to change. Primary use under the European Health Data Space starts that March.5

EMA roadmap slide, June 2026
Nearly three in four critical-list products had no manufacturer data four weeks out
73 in 100

critical-list products with no manufacturer data in PMS on June 1, 2026 (EMA reports 72.7%)

Source 5 · EMA's slide labels the remaining 27.3% as products with more than one manufacturer, and names no group with exactly one, so read this as a rough picture. We found no later EMA figure.

Show the numbers
MeasureValue
critical-list products with no manufacturer data in PMS on June 1, 2026 (EMA reports 72.7%)73 of 100

What EMA says follows when product data falls behind

ConsequenceWhat EMA saysWho feels it
The eAF stops workingIf a product is not submitted or kept up to date in XEVMPD, "the eAF cannot be used".3The team filing the next variation
Rejected submissionsIf the data is incorrect, "the submitted eAF may be rejected by NCAs".3Regulatory operations, and the launch or change waiting on it
InspectorsEMA monitors quality, and discrepancies "are reported to NCAs' inspectors who will contact the relevant MAH".3The quality leads and qualified people (who certify each batch) who answer
Slow fixesEMA resolves tickets in batches by priority, and "non-priority tickets may be placed on hold for extended periods".5The steward with one wrong field
A weaker view of supplyThe shortages platform uses manufacturers and operations in a crisis or a preparedness exercise.3Supply teams, regulators and, in the end, patients

In EMA's wording, NCAs are national competent authorities, the national medicines regulators, and an MAH is a marketing authorization holder.

What nobody publishes. We found no EMA figure for the share of records rejected, the number of inspection contacts over product data, or any fine tied to these deadlines. EMA's FAQ says a holder that misses its data duties is deemed to fail its responsibilities, and names the consequences above.3 Beyond that, the public record is thin. Plan as if the data will be read, because the systems depending on it are being built now.
09 · The industry's readiness

How ready pharma's IDMP programs are, and what the benchmark found

In shortThe best public benchmark covers 18 organizations in 2024. They named manual data collection and silos as their biggest problems and standardization as the main hurdle to integration. Most see value beyond compliance. Nobody publishes a reliable market size or a cost per product.

In the third quarter of 2024, the Pistoia Alliance, with ACCURIDS and MAIN5, interviewed 81 people at 18 organizations.32,33 The sample is small and leans toward large companies that already care about the subject, so read it as a rough guide.

"The biggest challenges identified are manual data collection, data silos, and the resulting lack of integration across systems."32 89% of companies said IDMP is worth more to them than compliance alone, though the report also says compliance drives the short-term work.32 About 40% said they had a compatible data model.32

Three in four companies use IDMP as a guide, and one in five follows it fully

Is IDMP the master data model for your product information? 18 organizations, 2024

Yes, fullyPartlyNo, not applicable or unknown
Survey answers20%55%25%

Source 32 · The last part is the remainder of the survey's two published figures.

Show the numbers
Yes, fullyPartlyNo, not applicable or unknown
Survey answers20%55%25%
Data standardization is the main hurdle to integrating product data

Biggest hurdles to data integration, more than one answer counted, 18 organizations, 2024

Lack of standardization56%
Lack of resources44%
Ownership41%
Data quality33%

Source 32,33

Show the numbers
HurdleShare of companies
Lack of standardization56%
Lack of resources44%
Ownership41%
Data quality33%

Who answers for IDMP data inside a drug company

The people who answer for it are heads of regulatory operations and regulatory information management at authorization holders, usually sharing the work with master data and labeling. A service provider's update in October 2026 says plainly that "there are issues with product data at many companies", and advises a clear data governance process with ownership of the data.13 That matches the benchmark. It is also a seller's view, so weigh it accordingly.

No public figure. We found no dependable published market size for IDMP services, no public average for hours per product record, and no published rate of first-time acceptance by PMS. A forecast from before these deadlines existed tells you little. Section 16 shows how to find your own numbers in a week.
10 · What AI changes

IDMP data extraction from the SmPC: what AI does well, where it falters, and what regulators expect

Status as of November 2026

In shortPublished research shows language models pull flat facts from an SmPC well and nested packaging data badly. The authors say human validation is mandatory. No regulator has written a rule for AI in product data entry, so general AI, data integrity and computer system expectations apply, and the signature stays with a person.

A 2025 study tested two large language models on 81 EMA SmPCs, against 5,224 reference elements. It reports a score of up to 0.98 on one similarity measure for the medicinal product section, and concludes that the method allows accurate and scalable extraction.34

On a stricter word-by-word similarity measure, scores fell sharply as data got more structured, and packaged product, the part next June's deadline depends on, came last. The deepest nested data averaged around 15%.34 The authors kept to SmPCs with one product and one dose form, built their reference set from model output corrected by experts, and state that "human validation is mandatory".34

AI reads a stated indication far better than a nested packaging record

Token similarity by IDMP section, better of two retrieval methods where the paper gives both; 81 SmPCs

Therapeutic indications0.8
Medicinal product0.76
Ingredients and composition0.6
Marketing authorization information0.53
Pharmaceutical product0.51
Packaged medicinal product0.48

Source 34 · One study, on SmPCs with a single product and dose form. Measure on your own documents.

Show the numbers
SectionToken similarity (0 to 1)
Therapeutic indications0.8
Medicinal product0.76
Ingredients and composition0.6
Marketing authorization information0.53
Pharmaceutical product0.51
Packaged medicinal product0.48

What each authority expects of AI in regulated product data

DocumentWhat it saysHow it applies here
EMA reflection paper on AIAdopted by EMA's committees in September 2024, with separate guiding principles on large language models, regularly updated.35Read it as EMA's general view. It sets no rule for product data
EMA and FDA principles of good AI practiceTen principles for AI in medicine development, published January 14, 2026.35A useful checklist
FDA draft guidance, January 2025A risk-based credibility framework for AI producing data to support decisions on safety, effectiveness or quality. Draft, "not for implementation".36Written for FDA submissions. Its idea of a stated context of use transfers well
EU AI ActMostly applicable from August 2, 2026. After the AI Omnibus, in force July 27, 2026, Annex III high-risk duties start December 2, 2027, and Annex I product duties August 2, 2028.37A tool that reads approved documents under a person's signature is not among the Commission's Annex III examples. Confirm with counsel
EU GMP Annex 11, and draft Annex 22Annex 11 on computerized systems is listed at its January 2011 revision. Draft Annex 22 on AI, in consultation from July 7 to October 7, 2025, says generative AI and large language models "should not be used in critical GMP applications", and that qualified people answer for their outputs in non-critical uses.38 It remains a draft: the final annexes listed in November 2026 do not include it.39GMP texts, for manufacturing. Product data entry is regulatory work, but check any flow back into a GMP decision
ISPE GAMP AI guideA July 2025 industry guide to AI-enabled computerized systems in GxP areas (regulated good-practice work such as manufacturing), used with GAMP 5.40A sensible frame for validating the tool. It is guidance from an industry body
FDA Computer Software AssuranceFinal, February 2026. Covers software used in medical device production or the device quality system under 21 CFR Part 820.41Outside its stated scope. Do not cite it for a drug product data tool

Four limits of any AI that reads approved documents

It can read what is writtenA sentence the document does not contain cannot be traced, so a good tool leaves that field empty.
It cannot decide who is rightWhen SmPC and Module 3 differ, the answer is a regulatory judgment with a follow-up.
Its near-matches look fineA term one material short reads well. Scores and evidence need a person who knows the dossier.
It inherits your filesScanned PDFs and old versions lower quality. EMA itself says scanned documents should be avoided.6
11 · How teams do it today

How regulatory data teams build a product record today: who does what, and where three weeks go

In shortA data steward gathers documents from four teams, copies values into a spreadsheet and then into PMS, looks up each term, chases the owners of any conflict, and signs. Nobody has published how long this takes. Our estimate is about three weeks of elapsed time per record, most of it spent copying, looking up and settling.

Data steward to labeling manager: four people who answer for one record

DS

Regulatory data steward

Owns the record. Finds approved versions, keys values, matches terms, settles conflicts and signs.

Cares about: re-keying what is already approved.
RO

Regulatory operations lead

Answers for the deadline, sends submissions and follows up returns.

Cares about: which products will miss December, and why.
LM

Labeling manager

Owns the SmPC, leaflet and label in each country, and will own the ePI.

Cares about: not rebuilding an approved leaflet as data.
MD

Master data manager

Keeps organizations and sites right in OMS, often from supply chain.

Cares about: one address written two ways.
An approved document reaches a submitted IDMP record in five steps, three of them the steward's
  1. 1Find the versions

    Approved SmPC, leaflet, carton and Module 3 sequence, from four systems or shared folders.

    Data steward2 days
  2. 2Copy the values

    Field by field, into a spreadsheet, then the PMS interface.

    Data steward5 days
  3. 3Look up the terms

    RMS, OMS and SMS by hand, one value at a time. Raise requests where nothing fits.

    Steward and master data3 days
  4. 4Settle conflicts

    Chase document owners when the SmPC, leaflet and Module 3 differ.

    Labeling and CMC3 days
  5. 5Review and submit

    Second check, signature, submission to PMS, new pack sizes through XEVMPD.

    Operations lead2 days

Illustrative · replace with your own numbers · Our sketch of a typical manual process. Time your own.

Show the numbers
StepWhat happensWhoTime
Find the versionsApproved SmPC, leaflet, carton and Module 3 sequence, from four systems or shared folders.Data steward2 days
Copy the valuesField by field, into a spreadsheet, then the PMS interface.Data steward5 days
Look up the termsRMS, OMS and SMS by hand, one value at a time. Raise requests where nothing fits.Steward and master data3 days
Settle conflictsChase document owners when the SmPC, leaflet and Module 3 differ.Labeling and CMC3 days
Review and submitSecond check, signature, submission to PMS, new pack sizes through XEVMPD.Operations lead2 days
Copying, looking up and settling take 11 of the 15 working days

Estimated working days for one product record by hand

Finding versionsCopying valuesLooking up termsSettling conflictsReview and submission
One record, 15 working days2 days5 days3 days3 days2 days

Illustrative · replace with your own numbers · Our estimate. No published study measures this.

Show the numbers
Finding versionsCopying valuesLooking up termsSettling conflictsReview and submission
One record, 15 working days2 days5 days3 days3 days2 days

Spreadsheet, RIM module, service provider or document extraction: four ways to do it

Spreadsheet and the PMS screens

Your stewards key values by hand through the Product User Interface.

Suits
A small portfolio
Watch
Evidence for each field, and repeat work across countries

A regulatory information system

The IDMP module of your regulatory information management (RIM) system holds the record, connected through the PMS API.

Suits
Companies with clean data in the system
Watch
Where the values come from, since the system often needs them typed in

A service provider

A team outside your company does the enrichment for a fee per product.

Suits
A one-time rush near a deadline
Watch
What you keep afterward, and who maintains the record

Document extraction with human review

Software reads approved documents and proposes values; your people decide and sign.

Suits
Large portfolios with repeated wording
Watch
Measured accuracy on packaging, and a link from each field to its source
Part B · See it working

Botminds IDMP and ePI Product Data Readiness on Narvexa, one of Veltara's 412 products

Part A described the work without naming a product. This part shows how Botminds does it, at a fictional drug company in the Netherlands with 412 nationally authorized products. Every company, person, number and document on the screens is sample data, and the record shown is a 64-field sample of the full EU model.

12 · One product, start to finish

Narvexa 50 mg: four approved documents become a signed IDMP record with 79 days to spare

In shortThis is the example from the top of the page, inside the product. Five agents read Narvexa's approved documents and fill 61 of 64 fields in 7.3 seconds, each tied to its sentence. Ines Kovač, the regulatory data steward, makes the three decisions they leave her: a container term, a site and a pack size. Then she signs.

1

Four approved documents, one press of a button

It is October 13, 2026. Ines opens VLT-118, Narvexa 50 mg film-coated tablets, authorized through decentralized procedure XX/H/0000/001/DC in 9 countries. The record shows 0 of 64 fields. Beside it are the documents that hold the answers: SmPC and leaflet version 4, both approved on March 14, the 28-tablet carton, and Module 3 sequence 0007.

The record is the home screen, with the source document on the left and the IDMP tree on the right. She presses "Read approved documents".

Before the agents read. The approved SmPC, the empty record, and a note listing the four approved documents waiting.
2

Sixty-one fields, each with a line to its sentence

The field extractor reads all 23 pages and fills the four parts of the record: substance, pharmaceutical product, packaged product and manufacturer. A thin line runs from each field to the sentence behind it. SmPC section 3 says "Film-coated tablet.", and the SPOR term matcher locks it to the RMS term of that name, a step the screens call a snap. In all, 38 values snap to EMA terms.

Sections 4.3 to 5.3 of the SmPC are clinical text and stay out of the record. The readiness scorer reports 61 of 64, ready after three decisions by the steward.

A field and its sentence. Hovering over the authorized dose form lights its line to section 3 of the SmPC. Blue lines mark values matched to an EMA term.
3

"Aluminium/aluminium blisters" matches no term

The container material glows amber. Below it are the three nearest terms with the evidence for each. Cold-form scores 91%, because Module 3.2.P.7 describes cold-formed polyamide (OPA) 25 µm, aluminium (Al) 45 µm and PVC 60 µm. Aluminium and PVC alone scores 62%, because it misses the polyamide layer. Strip scores 40%, because the dossier says blister.

Ines picks the first. It takes one click where a request or a long search used to. The agents never pick a value below the 0.95 threshold she has set, and they never invent a term.

Three nearest EMA terms. The source sentence, the scores and the evidence. The combined terms and their codes are the product's sample data. In EMA's lists, container and material are separate values: EMA's examples show Blister 100000073496, Aluminium 200000003200 and PVC 200000003222.8
4

One address written two ways, and a pack only the SmPC lists

The leaflet gives the batch release site as "Voorbeeldweg 41, 2399 SS Leiden". EMA's organization list holds Veltara Pharma B.V. at "Voorbeeldweg 41-43", the address Module 3.2.P.3.1 uses. The matcher offers that location at 89%, and Ines chooses it. The screen adds that 8 other products name the site the same way.

Then the cross-document checker shows the 98-tablet pack. Ines excludes it from the record, and follow-up FU-0218 goes to Sofie Vandermeer, the labeling manager, to align SmPC section 6.5 at the next variation. The agent shows both passages and leaves the decision to her.

A site matched to its location. The leaflet's wording, the chosen location and its code, a prompt to apply it to the other 8 products, and the manufacturer section with its sites and operations.
5

Ines signs, and the record becomes version 5

All 64 fields are filled. She signs with her password and a stated meaning: "Approved for submission to EMA's Product Management Service". The record becomes version 5, and the 9 Narvexa products join batch PMS-0427.

The agents do not send anything to EMA. Martin Aldred, the regulatory operations lead, sends the batch.

Approve and sign. The signer, the meaning, the batch the record goes to, and who sends it.

The solution's design target is 2 days per product record, against our estimate of about 3 weeks by hand, and 96% of fields filled from approved documents. They are targets, to be measured on your own products.

13 · Every screen

From the portfolio board to the phone preview: nine more screens of IDMP and ePI work

In shortOne product is the story. These screens show the rest of the work: the board of 412 products, fields filling as the documents are read, the pack size decision, the signed record, repeated wordings across the portfolio, conflicts, submissions, your settings, and the leaflet as ePI.

Portfolio readiness. EMA's three lanes, 412 products by status, and a plain reason for every product that is not ready. Telvoqa's shelf life is 2 years in the SmPC and 36 months in Module 3, and its amber glass bottle has no single term.
Fields filling. Part-way through the run, at 50 of 64, with each agent's step on the right.
A pack size decided. The SmPC, Module 3 and leaflet wording side by side, and the follow-up to labeling.
The signed record. 64 of 64 fields, every line still in place, and the record's place in its batch.
Same wording, many products. 196 values grouped into 8 wordings, so one decision covers all 29 products with the same text. Each keeps its own source sentence, and the steward approves the list first. The term codes are sample data.
Where approved documents disagree. Both passages, the likely cause, the steward's choice, and a count of why the 41 conflicts this quarter happened.
Submissions and record history. A batch is how the solution groups signed records for the person who sends them; EMA's channels are the Product User Interface and the API. Returned records carry the reason, and every version names who changed what.
Your rules. Source priority, threshold, approvers and deadlines. The priority shown is a sample setting that puts Module 3 first for ingredients. EMA's guide makes the SmPC the main reference, so set this with your own regulatory lead.6
The leaflet as ePI. Leaflet version 4, 6 pages and 4,812 words, structured under 6 of 6 QRD headings and 31 subsections, with 2 images and links to the packs of 28 and 56. The check against the approved text shows 0 words changed. Sofie approves it.

Narvexa is a nationally authorized product, and EMA's draft roadmap reaches those after centrally authorized medicines, with national implementation in 2027/2028.23 On these screens its ePI is prepared and approved ahead of that rollout, in English, Danish and German.

After Narvexa is signed, three in four Veltara products are ready

412 nationally authorized products on the sample's October 13, 2026 board

Ready: 318Needs review: 71Gaps: 23
412products
  • Ready318
  • Needs review71
  • Gaps23

Fictional example from this guide

Show the numbers
PartValue
Ready318
Needs review71
Gaps23
Veltara has sent 190 products in four batches, with 46 more waiting

Products in each batch on the sample's Submissions screen

31PMS-0361 (Jun 24)
61PMS-0398 (Sep 18)
52PMS-0412 (Oct 2)
46PMS-0419 (Oct 9)
46PMS-0427 (draft)

Fictional example from this guide

Show the numbers
PeriodValue
PMS-0361 (Jun 24)31
PMS-0398 (Sep 18)61
PMS-0412 (Oct 2)52
PMS-0419 (Oct 9)46
PMS-0427 (draft)46
14 · Agents, and who signs

Reading and matching by agent, with every record, ePI and batch signed by a named person

In shortFive agents each do one job within firm limits. None of them chooses between documents, rewords approved text or sends anything to EMA. A steward signs each record, a labeling manager each ePI and an operations lead each batch. These are controls that support your compliance with electronic-records rules; the responsibility for compliance stays with you.

Field extractor to readiness scorer: five agents for one product record

Field extractor

Reads every approved SmPC, leaflet, label and Module 3 section and fills each field with the document, version, section and sentence it came from, starting from the source your priority settings name first.

Never fills a field without a sentence, or reads a draft.

SPOR term matcher

Snaps each value to its RMS, OMS or SMS term, and ranks the nearest three with their evidence when it cannot.

Never snaps below your threshold, or invents a term.

Cross-document checker

Compares the SmPC, leaflet, label and Module 3 for every product, and shows both passages wherever they differ.

Never chooses which document is right.

ePI structurer

Turns the approved leaflet and SmPC into ePI to the EU ePI Common Standard: sections under their QRD headings, images, and links to the record.

Never rewords approved text. The labeling manager approves.

Readiness scorer

Scores every product against EMA's deadline lanes, says why a product is not ready, and prepares submission batches.

Never submits to EMA. Only signed records join a batch.

Steward signs the record, labeling the ePI, operations the batch

Signs each recordRegulatory data stewardPicks uncertain terms, settles conflicts and signs with name, time and meaning.
Approves each ePILabeling managerReceives the approved leaflet structured, with the word-change check, and approves it.
Sends each batchRegulatory operations leadSends signed batches, follows returns, and approves changes to source priorities the steward proposes.
Approves site dataMaster data managerApproves organization and site data, and reviews each new-term request before it goes to EMA.

Sentence-linked, approved versions only, every change a version

1

Every field cites its sentence

Document, version, section and exact sentence. A field without a source stays empty.

2

Uncertain terms come to a person

Below the threshold, the steward sees three terms with their evidence. A term applied to many products is approved as a list first.

3

Nothing is overwritten

Every choice, edit and signature is a new version, with who and when. An edited value keeps its source and is marked as changed by a person.

Botminds is SOC 2 Type II audited and manages information security to ISO 27001. A product cannot be certified for GxP, 21 CFR Part 11 or EU Annex 11, so we describe controls: role-based access, maker and checker separation, electronic signatures with meaning, and an audit trail you can export.

15 · What goes in and out

Approved SmPCs, Module 3 and SPOR lists in; signed IDMP records and ePI out

In shortThe solution works from documents you already hold and the lists EMA already publishes. Your regulatory system, PMS and the portal stay where they are. Decisions, signatures and evidence sit with the record, ready for export.

From your files

  • Approved SmPCs, leaflets and labels, in Word, PDF or eCTD
  • Module 3 sections 3.2.P.1, 3.2.P.3.1, 3.2.P.7, 3.2.P.8 and 3.2.S.2.1
  • Variation history, for the reason behind a disagreement
  • Your electronic application forms: EMA names them for manufacturing operations, so add them to the documents your setup reads3,6

From EMA and from you

  • RMS terms, OMS organizations and locations, SMS substances, refreshed nightly
  • Your source priority for each field family
  • Your snap threshold and approvers
  • EMA's deadline lanes and your reminders
Agents read, match, check and structure Every approved document, into the IDMP model and the EU ePI standard
A person decides and signs
Every field linked to its sentence

Outputs

  • IDMP records for substance, product, packaging and manufacturer
  • Batches of signed records for your operations lead
  • ePI in the EU ePI Common Standard, exported as a FHIR bundle
  • A readiness score per product against EMA's deadlines
  • Follow-ups to document owners, so the next version matches

What changes for the team

  • Three decisions on a product, in place of 64 fields to key
  • One decision for every product with the same wording
  • A deadline date you can defend, with a reason per product

Your regulatory information (RIM) system, PMS access and EMA's ePI portal stay in place

Regulatory information system

It stays the system of record for documents and procedures. Approved versions are read from it, and signed data goes back in your normal way.

EMA's Product Management Service

Signed records go through the PMS interface and API. New pack sizes still start in XEVMPD, as EMA requires for now, so plan both routes.3

EMA's PLM Portal for ePI

EMA's guidance describes importing ePI content through FHIR.25 Your ePI is exported as a bundle for that step, once your product's phase opens.

Master data and supply systems

Sites, operations and pack data can feed master data, and the shortages reporting that depends on them.

Document managementApproved SmPCs, leaflets, labels
eCTD publishingModule 3 sequences
Regulatory informationProducts, procedures, variations
ArtworkApproved carton and label versions
Identity and accessSingle sign-on, roles
Part C · Are you ready to automate?

Automating IDMP data enrichment: what it costs, what it returns and how to test it

You keep product data, or manage the people who do, or answer for the deadline. This part is written for you: what errors and delays cost today, what automating could return, whether your team is ready, and what to ask any vendor of IDMP software or services, including us.

16 · What errors and delays cost

What a hand-keyed IDMP record costs you in steward weeks, returned data and a second round for ePI

In shortStart from your own costs, because no regulator or study publishes them. Three published figures frame them: how far from done the first lane was four weeks out, what an ePI took in EMA's pilot, and what companies call their main hurdle.

72.7%

of critical-list products had no manufacturer data on June 1, 2026. If your December lane looks like that, your rate of work is the question to answer now.5

EMA PMS Info-Day, June 2026
5.2 hours

was the average time to create one ePI in EMA's pilot, on short and simple products. Multiply by your leaflets and your languages.29

EMA ePI pilot report, December 2024
56%

of companies in a small 2024 benchmark named lack of data standardization as the biggest hurdle to integrating product data.32

Pistoia Alliance, 18 organizations
Copying and looking up shrink most; settling conflicts still takes people

Working days per product record, our estimate by hand against the solution's split of its design target

By hand (our estimate)With automation (design target)
Finding the approved versions2 days0.1 days
Copying values5 days0.2 days
Looking up EMA terms3 days0.3 days
Settling disagreements3 days0.8 days
Review, signature and submission2 days0.6 days

Illustrative · replace with your own numbers · Neither column is a measurement. Time five of your own records; measure the target in a pilot.

Show the numbers
By hand (our estimate)With automation (design target)
Finding the approved versions2 days0.1 days
Copying values5 days0.2 days
Looking up EMA terms3 days0.3 days
Settling disagreements3 days0.8 days
Review, signature and submission2 days0.6 days
What nobody publishes. There is no public figure for hours per product record, the share of records EMA's checks send back, the share of products whose documents conflict, or the cost per product. Vendor figures for these rarely come with a dataset. Measure your own.

Timing five product records to find your IDMP baseline

CostWhere it hidesHow to find your number in a week
Steward timeFinding versions, copying and looking up, spread across weeksTime five records, simple and complex, with a stopwatch per step
Other teams' timeLabeling, CMC and supply answering questionsAsk each team to log minutes on one record
Backlog against the dateProducts not started or stuck on a termProducts left ÷ products finished a week. Compare with weeks left to December 31
ConflictsDifferences found late, or neverCompare SmPC, leaflet, label and Module 3 by hand on ten products
Returned or rejected dataFixes and tickets outside the project planCount your open EMA tickets and your rejected electronic forms from the last year
UpkeepEvery variation that touches a field after the push endsVariations last year × the share that change an IDMP field
ePIThe leaflet structured a second timeBuild one ePI on a real leaflet and time it against EMA's 5.2 hours

Launches held up, audits and a repeat project for ePI

The variation that waitsA blocked or rejected application form can hold up a change that matters more than the data.
The inspector's questionDiscrepancies go to national inspectors. Time spent answering is rarely in the plan.
The shortage you could not reportSite and operation data is what EMA's shortages platform relies on.
Knowledge that walks outWhen a steward leaves, the reason behind each term choice goes too.
A project done twiceData built by a one-time service still has to be kept current, and the ePI work may start again from Word.
17 · Your return

What faster product records return: backlog hours in year one, upkeep and ePI after that

In shortPut in your own numbers. Most of the value in an enrichment push arrives in year one, when the backlog clears. Later years rest on upkeep, ePI and reuse of the data. Only the ePI hours today come from a published source; every default marked illustrative is an assumption to replace.

Keying, term lookups and repeated wordings: where IDMP automation saves

Backlog

Fields arrive filled, ready to check

Each value comes with its sentence; the steward works through what is left.

products × hours saved per record × loaded hourly cost
Term lookups

One decision, many products

The same wording across a portfolio is settled once, then approved as a list.

products with repeated wording × lookup minutes saved ÷ 60 × hourly cost
Conflicts

Found before submission

Each product's documents are compared every time, including late in a push.

conflicts found early × hours saved on each fix × hourly cost
Upkeep

Variations update the record

A changed document reopens the fields it touches, with the new sentence.

records touched a year × hours saved on each × hourly cost
ePI

The leaflet is structured once

Approved text becomes FHIR with a check that no word changed.

ePIs a year × hours saved on each × hourly cost
Evidence

The answer is in the record

Source sentence, decision and signature sit on the field when an inspector or auditor asks.

hours spent assembling support for each question

Products in your December lane, hours per record and your hourly cost

Only the ePI hours today come from a published figure, the average in EMA's pilot.29 Every input marked illustrative is an assumption.

The backlog
Upkeep and ePI, each year
Your cost
Illustrative value
The backlog today, valued$0
Backlog hours released, valued$0
Upkeep and ePI hours released, valued, each year$0
Year one, after your cost$0
Each later year, after your cost$0
Staff hours released in year one0

Formulas:
Backlog today = products × hours today × hourly cost
Backlog released = products × (hours today − hours with automation) × hourly cost
Upkeep and ePI = (products × share touched × hours saved per update + ePIs × hours saved per ePI) × hourly cost
Year one = backlog released + upkeep and ePI − yearly cost
Later years = upkeep and ePI − yearly cost

Not counted: other teams' time, rejected forms avoided, shortages reporting, and inspection questions. Released hours are value only when you decide what they are for. A later year near or below zero is a real answer: it says a small portfolio should buy for the backlog, or plan other uses for the data.

The hours saved per record decide how few products pay for a year

Products to cover $100,000 of yearly cost from the backlog alone, at $90 an hour

Saves 32 hours a record35 products
Saves 16 hours a record70 products
Saves 8 hours a record139 products

Illustrative · replace with your own numbers

Show the numbers
Hours savedProducts
Saves 32 hours a record35 products
Saves 16 hours a record70 products
Saves 8 hours a record139 products

A company with hundreds of national products, sold in many countries with repeated wording, clears this easily. A company with ten centrally authorized products owes no enrichment push at all, and should say so before buying anything.

Start here18 · Readiness check

How ready your IDMP program is: portfolio, documents, term decisions, sites and sign-off

In shortPick the answer closest to your team today. Eight questions score 0 to 2; the last is for reflection. The meter adds up your score as you go, and each question says why it matters and what a strong answer sounds like.

1
Your December lane

Do you know how many nationally authorized products owe manufacturer data by December 2026, and how many are done?

Why it mattersYour rate of work against the weeks left decides everything else.
A strong answer"381 in the lane, 287 ready, 14 a week, done by November 29."
2
Approved versions

Can you find the current approved SmPC, leaflet, label and Module 3 sequence for a product in under an hour?

Why it mattersSoftware reads whatever you point it at. Old versions produce wrong data, with confidence.
A strong answer"All in one system, versioned, with the approval date on each."
3
Your baseline

Do you know hours per record, conflicts per product and how often data comes back?

Why it mattersNo public benchmark exists, so your own baseline is the only way to prove an improvement.
A strong answer"About 40 hours a record, one conflict in three products, two returns last quarter."
4
Which document leads

Have you written down which document leads for each field family, in line with EMA's guide?

Why it mattersEMA makes the SmPC the main reference, with Module 3 harmonizing existing data. Each steward deciding alone makes the record inconsistent.
A strong answer"One page, owned by regulatory operations, reviewed against Chapter 2 version 2.5."
5
Sites in EMA's organization list

Is every manufacturing and testing site matched to a location code in OMS, with someone who owns the list?

Why it mattersManufacturer data is reported by location code. A wrong address means a change request first, and lead time.
A strong answer"A master list with location codes, owned by master data, checked last quarter."
6
Who decides a term or conflict

Is one named role allowed to pick a term and settle a conflict, with a follow-up to the document owner?

Why it mattersAgents and software leave these decisions to people. Without an owner, they queue.
A strong answer"The steward decides, labeling gets the follow-up, operations approves any change to priorities."
7
Upkeep after the deadline

Does a variation that changes a field also change the record, by process?

Why it mattersEMA expects product data kept up to date. A one-time push decays with every approved change.
A strong answer"Our variation checklist names the IDMP fields affected, and the steward signs the update."
8
Your ePI plan

Do you know which products reach ePI when, who will approve it, and whether you will build FHIR yourself?

Why it mattersOnce a product's ePI exists it stays electronic in every later variation. It is a lasting commitment.
A strong answer"Labeling owns it, we start when our oncology products' phase opens, and we import FHIR."
9
The record in five years

If every product's facts were clean, coded and signed in one record, what would you do with that data that you cannot do today: supply planning, faster variations, one source for labeling? For reflection; it carries no score.

What a score of 0 to 16 means for your IDMP program

0–6

Explore

Count your lane, write down which document leads, and match your sites to OMS. Those three steps help whichever way you go, and they are the fastest gains before December.

7–11

Ready to pilot

Pick 30 to 50 products with a mix of wordings. Run a measured pilot with your stewards signing every record.

12–16

Ready to implement

Plan the portfolio by deadline lane. Set priorities, approvers and integrations, then add ePI by phase.

19 · Questions for any vendor

What to ask IDMP software or an enrichment service about sources, SPOR terms, conflicts and ePI

In shortAsk every vendor the same questions, us included. The answers show how the record is built: what it reads, how it picks terms, what happens when documents disagree, what evidence you keep, and how you would measure it on your own products.

AskA good answerA warning sign
What it reads
Which documents does it read: SmPC, leaflet, label, Module 3, eAF, in which formats?All of them, with version and approval date on each value"The SmPC is enough"
How does it know a version is approved?Reads status from your system; drafts stay outYou upload whatever you have
Which order of sources does it follow, and can you set it per field family?Yours, versioned, with EMA's Chapter 2 rule explainedA fixed order, or "Module 3 always wins"
SPOR terms
How does it use RMS, OMS and SMS, and how fresh are the lists?Current lists, refreshed on a schedule you can seeA copy from a project last year
What happens when nothing matches?Ranked options with evidence; a person picks or requests a termIt picks the closest and moves on
Does it treat container and materials as separate values, the way EMA's lists do?Yes, read from 3.2.P.7, shown on real RMS codesFree text in the material field
Can one decision cover every product with the same wording?Yes, after each product is checked against its own dossier and the list is approvedA blind find-and-replace
Conflicts and manufacturers
What does it do when SmPC and Module 3 differ?Shows both passages, records a person's decision and opens a follow-upSilently chooses one
How does it handle manufacturers: location codes, operations, sites named only in the dossier or eAF?Matches by location code and operation, and shows the sourceCopies the name and address from the leaflet
How does it treat new pack sizes while they still go through XEVMPD?A clear path through both routes"Everything goes through the PMS API"
ePI
How do you prove no word of approved text changed?A word-level comparison on every ePI, kept as evidence"Our model is very accurate"
Which versions of the FHIR guide and the QRD template do you build to, and how do you follow changes?Named versions, with a plan for QRD version 11"We support FHIR"
Evidence and control
Where is each field's sentence, decision and signature kept, and can you export it?On the field, with a full version history, exportableA log only the vendor can read
Who can send data to EMA?A named person, after a signature; the software never doesAutomatic submission
What can you claim about GxP, Part 11 and Annex 11?Controls that support your compliance, and validation support"We are Part 11 certified": no such certificate exists for a product
Proof
What accuracy do you report, on which fields, and on what documents?By field family, on your documents, with packaging shown separatelyOne percentage across all fields
What happens after the deadline, and who keeps the record current?Variations reopen the affected fields, and you own the data and the evidenceData delivered once in a spreadsheet
20 · How to start

Test IDMP extraction on 40 of your own products with planted errors, then decide on three numbers

In shortMeasure first, test on your own documents with errors you planted, then decide with three numbers. With manufacturer data due at the end of December, run the quick steps at once and keep the pilot on real work, so nothing it produces is thrown away.

  1. Time five records, one simple and four with several countries, by step. That is your baseline.
  2. Count your lanes: products owing manufacturer data, pack sizes and ePI, with your rate of work against each date.
  3. Gather 40 products with approved documents, your source order and an approval path to share them. Copy ten and plant known errors in them.
  4. Run on live products, with your stewards signing every record that goes to EMA.
  5. Decide with three numbers: catch rate by error type, wrong values by field family, and staff minutes to a signed record.
An eight-week pilot ends with a decision and signed records you can send
Your teamVendor
Time five records; count your lanes
Choose 40 products; plant errors in 10 copies
Load your source order, approvers and lists
Read the test set blind
Stewards decide and sign on live products
Score catches, wrong values, minutes
Decide
Week 02468

Illustrative · replace with your own numbers

Show the numbers
ActivityFromTo
Time five records; count your lanes01
Choose 40 products; plant errors in 10 copies0.52
Load your source order, approvers and lists13
Read the test set blind23.5
Stewards decide and sign on live products37
Score catches, wrong values, minutes6.57.5
Decide7.58
Start where deadlines and repeated work overlap: manufacturers first, then pack sizes
Deadline pressure →
Do by hand now
Automate first
Leave for later
Automate next
ManufacturersSite requestsPack sizesePI leafletsContainer termsSubstances
Volume of repeated work →

Illustrative · replace with your own numbers

Show the numbers
ItemVolume of repeated work (0–1)Deadline pressure (0–1)
Manufacturers0.760.70
Site requests0.100.64
Pack sizes0.780.30
ePI leaflets0.780.12
Container terms0.100.32
Substances0.100.12

Catch rate, wrong values and minutes per signed IDMP record

MeasureHowWhy
Catch rate by error typePlanted errors caught ÷ planted, per type, with the number plantedOne percentage hides the pack sizes and sites
Wrong values by field family300 random values checked against their sentences, packaging counted separatelyIf none of 300 are wrong, you can say with 95% confidence that the true rate is below about 1%. Published research shows packaging is the hard part34
False alarmsConflicts flagged on clean copies, in steward minutesA tool that flags everything catches every planted error
Staff minutesStopwatch from opening a product to signingThe cost case rests on it
Returned dataRecords EMA's checks return, with the reason, against your baselineThe operations lead's number
The full working-session questions: 15 questions in five groups

Bring regulatory operations, labeling, CMC, master data, supply, quality and IT into one room. Each question says why it matters, what a strong answer looks like, and the warning sign.

A

Your deadline lanes and product count

A1

How many products are in each lane, by procedure type and country?

Why it mattersThe scope sets the rate you need.
Strong answer · warning sign
A list from PMS's product report.
A number from memory.
A2

Were critical-list products finished by June 2026?

Why it mattersA late first lane shows what the second will need.
Strong answer · warning sign
Done, with lessons written down.
"We assume so."
A3

Which products would we leave out of any automation, and why?

Why it mattersSome products gain little: say so early.
Strong answer · warning sign
A clear exclusion list.
"Everything, day one."
B

Approved documents and Module 3 access

B1

Where do the current approved versions live?

Why it mattersSoftware reads what you point it at.
Strong answer · warning sign
One system, with status.
Shared drives by country.
B2

Who may read Module 3, and is it confidential under partner or supplier agreements?

Why it mattersEMA's rule asks you to keep data confidential when using Module 3.
Strong answer · warning sign
Access rules, written down.
"IT will sort it out."
B3

How many documents are scanned images?

Why it mattersEMA says scanned PDFs should be avoided, and they read worse.
Strong answer · warning sign
A count by product age.
Nobody knows.
C

Source order, terms and term requests

C1

Which document leads for each field family?

Why it mattersIt becomes a setting everyone relies on.
Strong answer · warning sign
Written, in line with Chapter 2.
Each steward's habit.
C2

Who raises a term or location request at EMA?

Why it mattersIt takes a SPOR role and supporting documents.
Strong answer · warning sign
Named people with active roles.
"We have never done one."
C3

What score counts as safe to apply without a person?

Why it mattersA threshold is a risk decision.
Strong answer · warning sign
Set after a test, reviewed often.
The vendor's default, unexamined.
D

Signatures, sites and upkeep

D1

Who signs a record, an ePI and a submission?

Why it mattersSigning roles become settings, and maker and checker should differ.
Strong answer · warning sign
Written, by role.
"Whoever's free."
D2

Who owns the list of sites, and how does it stay matched to OMS?

Why it mattersEMA says some PMS records show incorrect names or addresses, and plans a synchronization with OMS.3
Strong answer · warning sign
Master data, quarterly check.
No owner.
D3

How does an approved variation reach the record?

Why it mattersWithout a step in the process, the record decays.
Strong answer · warning sign
A checklist line with an owner.
Fixed at the next deadline.
E

ePI phases and validation

E1

Which of our products fall in which ePI phase?

Why it mattersVaccines and oncology start first; national products later.
Strong answer · warning sign
A list by ATC code and procedure.
"Not until it's mandatory."
E2

What validation does our quality group expect for a tool like this?

Why it mattersFinding out in week seven stops the project.
Strong answer · warning sign
A risk assessment agreed early.
Quality hears about it at the end.
E3

Where else would this data help?

Why it matters89% of benchmark companies see value beyond compliance, and later years' return depends on it.32
Strong answer · warning sign
Named uses, with owners.
"Compliance only."
21 · Questions people search

IDMP compliance, PMS enrichment, SPOR and ePI: the questions regulatory teams ask most

In shortEach answer stands on its own, with status as of November 2026.

What is IDMP compliance?

IDMP compliance means describing your medicines in the structured data model of the ISO Identification of Medicinal Products standards, using the coded terms regulators publish. In the EU it means keeping your products correct in the Product Management Service (PMS) of the European Medicines Agency (EMA), with terms from its RMS, OMS and SMS services. The practical test is whether each value in the record is complete, coded and backed by an approved document.

What is the EMA PMS data enrichment deadline?

Enrichment means filling the gaps in EMA's Product Management Service (PMS). For products not centrally authorized, EMA's dates are June 2026 for manufacturer data and pack sizes on the Union list of critical medicines, December 2026 for manufacturer data on all others, and June 2027 for pack sizes on all others. EMA extended two of these dates in September 2025. Centrally authorized products came across from EMA's own system, and their holders review them.

What is the difference between SPOR, RMS, OMS, SMS and PMS?

SPOR is EMA's name for its four master data domains. RMS holds lists of controlled terms such as dose forms and routes, OMS holds organizations and their locations, SMS holds substances, and PMS holds the products themselves. A product record in PMS points to terms, locations and substances in the other three.

How do I submit pack sizes to PMS?

New pack sizes go through XEVMPD, EMA's older product database, and load into its Product Management Service (PMS) from there; the structured pack details are then added through the PMS Product User Interface or API. EMA's FAQ of September 2026 states that XEVMPD is currently the only way to submit product data to PMS. Pack size means total units per unit of presentation, such as 8 tablets.

How do I report manufacturer data to PMS?

Each manufacturer is reported in EMA's Product Management Service (PMS) using its location identifier from OMS, EMA's validated list of organizations and locations, with the operations the site performs. If the location is missing or wrong, you request a change through the EMA Service Desk first. EMA's guide points to section 2.5 of the electronic application form and Module 3.2.P.3.1 and 3.2.S.2.1 for the operations.

Should IDMP data come from the SmPC or Module 3?

Chapter 2 of the EU IDMP Implementation Guide makes the SmPC, the approved summary of product characteristics, the main referring document for data entry. For products already in EMA's Product Management Service, where the documents differ, Module 3 can be used to harmonize the values, provided confidentiality is kept and no complexity is added. Either way, the difference itself should go to the document owner to align at a later variation.

Does the UK need to do PMS enrichment?

EMA's FAQ says products authorized in the UK are out of scope of the enrichment, and that enrichment is not required for Northern Ireland, since EMA's shortages platform does not monitor those products. Check this against your own authorizations and the current FAQ.

What is ePI in the EU?

Electronic product information is the authorized SmPC, Annex II, label and leaflet in the EU ePI Common Standard, which is based on FHIR. It is published alongside the usual documents, and Word and PDF remain required in the eCTD. EMA expects it to improve access to current information through search, multiple languages and scanning the pack.

When will ePI be mandatory?

No date has been set. Submission is voluntary for centrally authorized medicines until the new pharmaceutical directive fully applies, and EMA says ePI will then be mandatory for all newly authorized medicines. The Council adopted its first-reading position on the EU pharma package on September 28, 2026. Parliament's second reading was still pending on November 3, 2026, with an indicative plenary date of November 23, and the new rules generally apply 24 months after they enter into force.

When does ePI start for nationally authorized products?

EMA's draft roadmap starts with centrally authorized medicines from the fourth quarter of 2026. National products follow a readiness assessment of national authorities, with national implementation shown for 2027/2028. EMA's ePI page had announced no go-live as of November 3, 2026. Denmark, the Netherlands, Spain and Sweden took part in the 2023 to 2024 pilot, which included national procedures.

Can AI extract IDMP data from an SmPC?

Yes, with limits you should measure. A 2025 study of 81 EMA SmPCs reported strong results on flat, plainly stated facts and much weaker ones on nested packaging data, on single-product documents only, and its authors state that human validation is mandatory. Ask for every value to carry its sentence, test on your own documents with planted errors, and keep a person signing the record.

Can IDMP software be certified for 21 CFR Part 11 or EU Annex 11?

No product can be certified for these. Part 11 and Annex 11 apply to how a regulated company uses a system. A vendor can offer controls that support your compliance, such as electronic signatures with meaning, role separation and an audit trail, along with validation support. Treat any claim of certification as a warning sign.

How long does it take to build one IDMP product record?

No regulator or study publishes a figure. Our estimate is about three weeks of elapsed time by hand across four teams, and the time depends on how many countries, sites and conflicts the product has. Time five of your own records to get a baseline you can defend.

22 · One-page summary

IDMP and ePI on one page: the method, EMA's November 2026 dates, readiness and terms

Print this page

In shortThe whole guide on one screen: the method, the dates as of November 2026, the readiness bands and the terms.

The method
  1. Count your lanes: critical list, December manufacturer data, June 2027 pack sizes, ePI phases.
  2. Read approved versions only. Record the version on every value.
  3. Write down which document leads. EMA's main reference is the SmPC; Module 3 harmonizes existing data.
  4. Match each value to RMS, OMS or SMS. Near-matches go to a person, with evidence.
  5. Compare SmPC, leaflet, label and Module 3. A person decides; the document owner gets a follow-up.
  6. Sign, send, follow what comes back, and let each variation reopen the fields it changes.

Readiness: score 0–2 on eight questions: 0–6 explore · 7–11 pilot · 12–16 implement.

As of November 2026: manufacturer data for other non-centrally authorized products due end of December 2026 · pack sizes end of June 2027 · ePI voluntary, draft roadmap from Q4 2026 for vaccines · EU pharma package: Council first-reading position September 28, 2026, Parliament's second reading pending · EU Implementation Guide Chapter 2 version 2.5, August 2026.

14 terms
IDMP
Five ISO standards describing a medicine in data.
PMS
EMA's Product Management Service, the EU's shared product record.
SPOR
EMA's substance, product, organization and referential data.
RMS
Controlled lists of terms, such as dose forms and routes.
OMS
Validated organizations and locations, each with a code.
SMS
Substance names and codes.
Enrichment
Adding the data older loads left empty, such as manufacturers and structured packs.
XEVMPD
EMA's older product database, still the entry point for new pack sizes.
SmPC
Summary of product characteristics: the approved text for prescribers.
Module 3
The quality part of the dossier: composition, sites, container, stability.
eAF
Electronic application form, including manufacturers.
ePI
Authorized product information as structured FHIR data.
QRD template
EMA's required headings and wording for product information.
Variation
An approved change to a marketing authorization.
23 · Sources

Sources

Accessed November 2026. Regulatory status statements are as of November 2026.

  1. EMA, "Sharing data across systems: Master data on human medicines". www.ema.europa.eu
  2. EMA, "Data on medicines (ISO IDMP standards): Overview". www.ema.europa.eu
  3. EMA, "Product Management Service (PMS): Frequently Asked Questions", September 29, 2026 (the product team's expert view; sections 3, 6.1 to 6.8, 7.1). www.ema.europa.eu
  4. EMA, "Electronic product information (ePI)", page history to September 16, 2026. www.ema.europa.eu
  5. EMA and Heads of Medicines Agencies, "PMS Info-Day 2026: Medicinal product data for Europe's public health", presentation, June 9, 2026 (slides 44, 47, 53, 54, 56, 57). www.ema.europa.eu
  6. EMA, EU IDMP Implementation Guide, "Chapter 2: Data elements for the electronic submission of information on medicinal products for human use", Version 2.5, August 7, 2026. www.ema.europa.eu
  7. EMA, "Organisation Management Service (OMS)", page history to March 9, 2026. www.ema.europa.eu
  8. EMA, EU IDMP Implementation Guide, "Chapter 8: Practical examples", Version 2.1.1, July 8, 2022 (section 1.3.1 on SmPC and Module 3; RMS codes in the worked examples). www.ema.europa.eu
  9. European Medicines Agency, "Substance and product data management services" (enrichment deadlines; public PMS API beta), page history to June 12, 2026. www.ema.europa.eu
  10. EMA, SPOR Referentials Management Service web portal, notice on change requests from October 1, 2025. spor.ema.europa.eu
  11. Freyr Solutions, "IDMP compliance: what companies need to know", July 28, 2015 (a consultancy's estimate, dated). www.freyrsolutions.com
  12. EMA, PLM Portal notice KA-01134, extended PMS deadlines for non-centrally authorized products, September 10, 2025. plm-portal.ema.europa.eu
  13. Cencora, "The critical role of industry in the PMS and master data", updated October 21, 2026. www.cencora.com
  14. EMA, "European Shortages Monitoring Platform (ESMP)". www.ema.europa.eu
  15. EMA, PLM Portal, "PMS guidance documents and training materials", KA-01032. plm-portal.ema.europa.eu
  16. EMA, "Union list of critical medicines", version 2.1 (revision 1), EMA/361872/2025, updated January 19, 2026. www.ema.europa.eu
  17. FDA, "Identification of Medicinal Products (IDMP)", content current as of May 5, 2022. www.fda.gov
  18. EMA, "Overview of OMS change request process", EMA/440168/2018 version 2, June 27, 2018 (dated; the submission route has since moved to the EMA Service Desk). www.ema.europa.eu
  19. EMA, "Product-information templates: human medicines" (QRD template version 10.4, February 29, 2024; draft version 11, consultation closed August 31, 2025). www.ema.europa.eu
  20. ICH, M4Q(R1), "The Common Technical Document for the Registration of Pharmaceuticals for Human Use: Quality", 2002 (Module 3 headings). database.ich.org
  21. ICH, "M4Q(R2) EWG Work Plan", February 18, 2026. database.ich.org
  22. EMA, "ePI update: roadmap and go live for CAP vaccines", 17th Industry Standing Group, presented by A. Revuelta, 2026 (draft roadmap slide). www.ema.europa.eu
  23. EMA and Heads of Medicines Agencies, "ePI implementation roadmap [DRAFT]", published March 20, 2026. www.ema.europa.eu
  24. EMA, "Management Board: highlights of March 2026 meeting", March 13, 2026. www.ema.europa.eu
  25. EMA, "Electronic product information (ePI) submission during centralised procedures: Guidance for applicants", EMA/199350/2026, September 1, 2026 (for application after ePI go-live). www.ema.europa.eu
  26. CMS, "EU Pharmaceutical Package: what the Council's revised texts mean for companies", October 2, 2026. cms.law
  27. European Parliament, Legislative Observatory, procedure 2023/0132(COD), stage "Awaiting Parliament 2nd reading", read November 3, 2026. oeil.europarl.europa.eu
  28. European Medicines Regulatory Network, "Electronic Product Information (ePI) Implementation Guide", release 1.0.0, September 17, 2026. epi.ema.europa.eu
  29. EMA, "ePI pilot report: Experience gained from creation of ePI during regulatory procedures for EU human medicines", December 16, 2024. www.ema.europa.eu
  30. EMA, "Successful pilot paves the way for implementation of ePI", news, December 16, 2024. www.ema.europa.eu
  31. European Commission, EudraLex Volume 2 (SmPC guideline, September 2009; Variations Guidelines, OJ C/2025/5045, September 22, 2025). health.ec.europa.eu
  32. Pistoia Alliance with ACCURIDS and MAIN5, "Accelerating Digital Transformation in Pharma with IDMP: an industry benchmark report", 2024 (81 people at 18 organizations). marketing.pistoiaalliance.org
  33. M. Stam, "Survey Findings: How Are IDMP Readiness Efforts Progressing?", Pharmaceutical Online, December 13, 2024. www.pharmaceuticalonline.com
  34. Kadi, Abdellatif, Kemajou Njamen and Pereme, "Automatic extraction of SmPC document for IDMP data model construction using foundation LLM and RAG: a preliminary experiment for pharmaceutical regulatory affairs", Frontiers in Medicine 12:1598979, August 13, 2025. pmc.ncbi.nlm.nih.gov
  35. EMA, "Artificial intelligence" (reflection paper adopted September 2024; large language model guiding principles; EMA and FDA guiding principles of good AI practice, January 14, 2026). www.ema.europa.eu
  36. FDA, "Considerations for the Use of Artificial Intelligence to Support Regulatory Decision-Making for Drug and Biological Products", draft guidance, January 2025, Docket FDA-2024-D-4689. www.fda.gov
  37. European Commission, "AI Act", regulatory framework page, application timeline after the AI Omnibus (in force July 27, 2026). digital-strategy.ec.europa.eu
  38. European Commission and PIC/S, "Annex 22: Artificial Intelligence", draft for consultation, July 7 to October 7, 2025 (section 1, Scope). picscheme.org
  39. European Commission, EudraLex Volume 4 (Annex 11, January 2011; final annexes as listed in November 2026). health.ec.europa.eu
  40. ISPE, "GAMP Guide: Artificial Intelligence", July 2025. ispe.org
  41. FDA, "Computer Software Assurance for Production and Quality Management System Software", final guidance, February 2026. www.fda.gov
Next step

See it on your own SmPCs, leaflets and Module 3.

Explore the solution, or bring a sample of your own approved documents and your source priorities, and we will build product records with you, every field linked to its sentence.

botminds.ai The complete guide to IDMP and ePI product data readiness · November 2026. Veltara Therapeutics, Narvexa, selvoranib, every other company, product and person, and every figure in the example and the screens are fictional. Regulatory status is as of November 2026; check the sources before relying on it.