SystemClinical Development

GCP Inspection Readiness

GCP inspection readiness where every storyboard sentence is backed by the record

See one case, screen by screen ↓
Watch with transcript →

Built forClinical QA leadsStudy leadsMedical monitorsTrial master file managers

The Problem Today

Clinical QA builds storyboards from slides and memory, so claims that sound right are not in the record.

7 of 15
UK-inspected sponsors with a critical finding, 2016–17 published

Stitched together by hand

  • Trial file
  • Quality log
  • Deviations
  • Training
  • Late filings unexplainedDocuments filed after the notice sit without a note-to-file
  • Front room unpreparedExperts guess under an inspector's questions

The Solution

  1. The record read in placeTrial file, quality, training and data systems indexed, nothing moved
  2. Storyboards drafted, citedEight frames per likely topic, a citation on each sentence
  3. Unbacked claims become gapsEach unsupported sentence struck, with an owner and a due date
  4. Rehearsed, then signedMock inspector questions answered from the record; QA signs each story

Built-in controls

  • Agents never edit or file a document
  • No coaching notes reach the inspector
  • Every step on the audit trail

What You Get

Front-room answers are rehearsed against the record, and QA signs each storyboard knowing what the record backs.

  • Weak areas seen firstA readiness score for each of nine inspection areas
  • Late filings explainedA note-to-file drafted for each document filed late
  • Requests answered with the right versionEffective versions found; a person releases each document
In short

What is GCP Inspection Readiness?

GCP inspection readiness software gets a sponsor ready for an FDA or MHRA GCP inspection: the topics an inspector will probe, a factual storyboard for each, the gaps in the record, and rehearsed answers for the front room. GCP Inspection Readiness adds six agents that read the trial record in place, draft storyboards with a citation on each sentence, check each sentence against its source and play the inspector. The QA lead signs each storyboard.

How to choose AI solutions for life sciences →

Updated

The problem

GCP inspection preparation still runs on slide decks and memory

When FDA or MHRA announces a GCP inspection, clinical QA has weeks to make each topic an inspector may probe (out-of-window visits, consent on a superseded form, data changes after soft lock, oversight of the CRO) into one factual story, and to prepare the people who will answer in the front room. Today each storyboard is assembled by hand from the eTMF, the CTMS, the EDC and the quality system, in slides and spreadsheets.

The risk sits in the sentences that sound right but are not in the record: “the new coordinator was trained before she booked her first visit”, “every change was approved before hard lock”. Inspectors test exactly those claims against the TMF. Documents filed after the notice show in the eTMF audit trail, and a back room that takes half an hour to find a visit report reads as a disorganized TMF.

typical7 of 15sponsorsinspected by the MHRA in 2016–17 had at least one critical GCP finding
Where a storyboard's working days goestimated
By hand7.5 days
With the solution2 days
  • Finding the documents across eTMF, CTMS, EDC and quality2 → 0.3 d
  • Drafting the eight frames and the timeline1.5 → 0.3 d
  • Checking each sentence against its source1.5 → 0.3 d
  • Chasing the gaps and the notes-to-file1 → 0.5 d
  • Rehearsing the front-room answers1 → 0.5 d
  • SME review and QA sign-off0.5 → 0.3 d

Estimated split for one storyboard on a sponsor inspection, by hand and with the solution.

How it works

Inspection storyboards: drafted, checked and signed

What comes in
Records inEvery system, in place · trial master file, quality, safety, training
Agents at work
Evidence Indexerevery document labeled
Then
Topic Finderwhat an inspector will probe
Then
Storyboard Writer8 frames, all cited
Then
Claim Checkerbacked or a gap
Then
Inspector Simulatorasks and coaches
Then
Back-room Retrieverdocuments in seconds
A person decides
QA leadapproves, signs inspection-ready
What comes out
Signed storyboards
Gaps with owners
Readiness by area
One case, step by step

GCP inspection readiness, nineteen days before an FDA sponsor inspection

One sponsor, one drug in plaque psoriasis, license application under review, and 36,412 documents in the eTMF. The FDA notice arrived two days ago for a four-day sponsor inspection. Here is one morning, screen by screen, in the working solution.

A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.

  1. 01The morning, 19 days out

    The war room, 19 days out

    Clinical QA lead

    The QA lead opens on the countdown: 19 days to the opening meeting, readiness 84/100 and +8 this week, 4 of 12 storyboards inspection-ready, 274 of 291 sentences backed, 14 open gaps. The readiness radar scores nine inspection areas; Protocol compliance at 72 and Data handling at 76 sit below 80. The storyboard wall shows each frame of each story, colored by whether the record supports it.

    The inspector is likely to ask: “Three Week 16 visits at Site 114 were out of window. How do you know your corrective action worked?” The medical monitor answers, and it is not rehearsed.

  2. 02One click on the radar

    Protocol compliance opens at the frame that fails

    Claim Checker

    Clicking Protocol compliance opens the storyboard on Week 16 visits out of window at Site 114, at frame 6: What we did. The CAPA retrained the whole Site 114 team; that sentence is cited. The next one, that the new coordinator was trained on the visit schedule before she booked her first visit, is underlined red. Overnight the Claim Checker re-read all 31 claims: 30 supported, 1 not in the record.

    “The record cannot support this yet.” Actions in the CAPA: “Train new coordinator before booking visits. No record.”

  3. 03The source

    The training log shows why

    Clinical QA lead

    The citation opens the Site 114 staff training log, filed in TMF 05.02.08 and read in place, nothing copied. The new coordinator has Protocol v4.0 and EDC user training in her first days; her first visit-schedule training is the later whole-team retraining. She booked the Week 16 visit for one subject before that. A gap opens for the TMF manager, with a due date: find an earlier training record, or reword the claim.

    “No visit-schedule training is recorded for the coordinator before the retraining.”

  4. 04Back in the war room

    Six statements an inspector would find

    Clinical QA lead

    The week plan lays out 12 sessions over four days with 6 people in the front room; Wednesday’s 09:00 protocol compliance session, with the medical monitor and this storyboard, is flagged. Beside it, what the record cannot back: six statements struck through with the reason. 38 of the 214 changes after soft lock have no approval entry in the change log; the reopening memo is a draft, v0.3, not signed; the CRO’s oversight minutes for two months are not in the TMF.

  5. 05The likely question

    The answer, cited line by line

    Inspector Simulator

    One click shows the answer from the record: the whole Site 114 team retrained under the CAPA; since then all 9 Week 16 visits at the site were inside the window, a median of 1 day from the target date; the CAPA closed as effective; Week 16 windows are checked at each on-site visit. Each sentence carries its citation, and the coaching for the medical monitor is underneath.

    Coaching: “Do not say the new coordinator was trained before booking the visit. Say she was retrained with the whole team.”

  6. 06Mock inspection

    The record checks each spoken answer

    Medical monitor

    The medical monitor answers as in the front room. The check reads the four sentences against the record: two backed; the claim that the new coordinator was trained before she booked any visit is not in the record; “our monitors check visit windows at every visit” is only partly backed, because monitoring plan v3 checks it at on-site visits and leaves out remote ones. In the back room, four document requests from the latest mock went out at a median of 0:41.

    Front-room habits: “If you do not know, say you will check. Never guess.”

  7. 07Gaps

    Fix the record, or change the story

    Clinical QA lead

    Fourteen gaps are open across 8 storyboards, 4 of them high severity and 5 due within the week, each with what is needed, the frame it blocks and an owner. The late-filing watch counts 37 documents filed since the notice, 29 of them dated months earlier, and only 11 with a note-to-file.

  8. 08One click

    26 notes-to-file drafted, none filed

    Clinical QA lead

    The QA lead clicks Draft the missing notes. The solution reads the 26 late filings without a note (document date, filed date, who filed, why it was late) and drafts one note per document with a factual reason from the filing history. The notes go to the TMF manager for signature.

  9. 09QA approval

    The QA lead signs a storyboard inspection-ready

    Clinical QA lead

    On the storyboard for emergency unblinding at Site 209, 21 sentences are supported, 1 partly and none outside the record. The QA lead chooses the meaning of the signature, “Approved as factual and complete” or “Approved with the noted gaps”, and signs with a password. The partly supported sentence stays an open gap after signing. Approving with a statement not in the record is off in Settings; the dialog would ask to reword the frame or close the gap first.

    “Signed as Clinical QA lead · recorded with name, date, time and meaning.”

  10. 10Where it stands

    84 today, 90 the target before the opening meeting

    Head of clinical operations

    The dashboard shows readiness rising week by week over the last 30 days to 84, against a target of 90 before the opening meeting; 94% of claims backed by the record; open gaps by inspection area; and back-room retrieval falling from 26:00 by hand in an early rehearsal to 3:12 in a later mock and 0:41 in the latest.

Who it’s for

The front room and back room of an FDA or MHRA inspection

What the preparation asks of the five roles that carry it, by hand and with the solution.

Clinical QA lead
Signs storyboards inspection-ready
Before
Owns readiness for the FDA sponsor inspection, and needs to know which story falls apart before the inspector does.
Now
Opens the war room on the weakest area and the exact frame the record cannot back, and signs each storyboard with the meaning of the signature.
Medical monitor
Front-room expert for protocol compliance
Before
Answers the protocol compliance questions in the front room and wants the one number that answers each, and where it lives.
Now
Rehearses the likely question against the record, sentence by sentence, and leads with the number the record backs.
TMF manager
Coordinates the back room
Before
Gets asked for four visit reports during the inspection and has twenty minutes instead of two hours, while late filings sit without a note.
Now
Gets requested documents found and version-checked, releases each one personally, and signs drafted notes-to-file.
Study lead
Owns deviations, data handling and consent
Before
Might tell an inspector that each change was approved, unless someone stepped in.
Now
Sees each storyboard with each frame’s support, and the gaps to close, such as changes without approval and the delegation log the PI has not signed.
Head of clinical operations
Executive sponsor of the preparation
Before
Wants to hear that readiness will reach the target by the opening meeting, or what is stopping it.
Now
Reads the readiness trend, claims backed, gaps by area and back-room times on one dashboard.
The agents

Agents that index the TMF, draft storyboards and play the inspector

The agents index the record in place, find what an inspector will probe, draft and check each storyboard, rehearse the room and fetch documents; the QA lead approves every storyboard.

Evidence Indexer

Reads the eTMF, CTMS, EDC, quality system, training and IRT records in place and labels each document by TMF zone, site, document date and filed date, flagging any filed after the inspection notice.

  • Read only; never moves, edits or files a document
  • Stays inside the inspection scope
Topic Finder

Finds the topics an inspector is likely to probe (important deviations, out-of-window visits, consent errors, excursions, system changes), ranks them and maps each to one of the nine inspection areas.

  • Proposes topics; a person decides which become storyboards
Storyboard Writer

Drafts each storyboard in eight frames (the issue, how we found it, timeline, impact, root cause, what we did, proof it worked, where it stands) in short factual sentences, with dates and numbers exactly as the record gives them.

  • No sentence without a citation, and no speculation
  • No internal comments in inspector-facing text
Claim Checker

Re-reads each storyboard sentence and rehearsed answer against its sources, as supported, partly supported or not in the record, and opens a gap with an owner for each one that falls short.

  • Never marks a sentence supported without a passage
  • Cannot approve a storyboard
Inspector Simulator

Plays the inspector: asks FDA- or MHRA-style questions one at a time, checks the answer sentence by sentence and gives at most four coaching points.

  • Coaching never suggests saying something the record does not support
Back-room Retriever

Finds the documents an inspector asks for, checks each is the effective version and complete, lists what is sent and keeps the request clock.

  • A person releases each document to the inspector
QA lead

Approves, signs inspection-ready.

Ask in plain words

Storyboards, gaps and likely inspector questions, answered from the record

Ask about any storyboard, gap or likely inspector question, or say what to change. Each answer points to its source.

Where are we weakest for the FDA inspection?

Two areas are below 80 on the readiness radar. Protocol compliance is at 72: in the Site 114 storyboard the coordinator’s training is not in the record. Data handling is at 76: 38 changes have no approval and the reopening memo is unsigned. Records & TMF is next at 80. Readiness is 84; closing the open high-severity gaps would lift it to about 88.

What will the inspector ask about visit windows?

Expect: how do you know the Site 114 corrective action worked; was any primary endpoint score lost; and how do you find out-of-window visits at other sites. The first is still not rehearsed, and the medical monitor is the person who answers it.

Add a rule: flag documents filed after the inspection notice

Done. The new rule marks any cited document filed after the notice date and asks for a note-to-file. It already applies to 37 documents; 11 have notes. Saved to the audit trail.

Draft a storyboard for the IB v7 acknowledgement at Site 029

Started that storyboard in Records & TMF. Six documents were found, including the site’s TMF completeness at 81%. The eight frames are being drafted; it is on the Storyboards list as Drafted, owned by the TMF manager.

The screens

The war room, the storyboard frames and the mock inspection

From the working solution, on its sample data. Pick one to see it large.

The war roomThe countdown to the opening meeting, the likely inspector question, the readiness radar across nine areas and the storyboard wall.
Inspection week and unbacked statementsThe four-day plan, session by session with who answers and which storyboard, beside the statements the record cannot back.
A frame the record cannot supportThe eight frames of a storyboard, the cited frame with its verdict, the actions in the CAPA and the source passage beside it.
The source, highlightedThe cited document opened in place, with its TMF zone, dated and filed dates, and the passage that decides the verdict.
The cited answerThe answer to the likely inspector question, each sentence numbered to its source, with coaching for the person who gives it.
Mock inspectionThe question bank by area, the person’s answer checked sentence by sentence, and the back-room request log with its clock.
StoryboardsAll twelve storyboards with their area, frames supported, claims, stage, owner and when they were last rebuilt.
Approve and signSupported, partly supported and not-in-the-record counts, and the meaning of the signature, recorded with name, date and time.
GapsOpen gaps by severity and due date, the late-filing watch, and each gap with what is needed, its storyboard frame and its owner.
Notes-to-file for late filingsNotes drafted for each document filed after the notice, sent to the TMF manager for signature.
The readiness dashboardReadiness trend against the target, claims backed by the record, open gaps by area and back-room retrieval time per mock session.
Inspection settingsThe authority and inspection type, dates, scope, the eight storyboard frames, approvers and the approve-with-an-open-gap switch.
Governance

Citations, gaps and QA signatures behind each inspection storyboard

Each sentence cites the recordEach storyboard sentence cites a document and the passage that proves it. A sentence without a source cannot be saved, and the rule is locked on.
Unbacked statements become gapsA sentence the record cannot support is marked not in the record, with what is missing, and opens a gap with an owner, a due date and the frame it blocks.
A named QA approver signsAgents draft and check; only a named QA approver marks a storyboard inspection-ready, and medical storyboards also need the medical monitor’s review. Signatures record name, date, time and meaning.
The TMF is read in placeAgents do not move, edit or file a document. Documents filed after the inspection notice are flagged, and drafted notes-to-file are filed only after the TMF manager signs.
Nothing internal reaches the inspectorInspector-facing exports carry no coaching notes or internal comments, and coaching does not suggest saying something the record does not support.
Each step on the audit trailEach agent step and person’s action (a rebuild, a gap opened, a request answered, a signature) is recorded with who, what and when.
Configuration

The authority, the approvers and the citation rule for each inspection

The inspection, who signs and the rules each rebuild is checked against are settings, set once per inspection.

SettingDefaultChoose from
Authority and typeFDA — sponsor inspection (BIMO)FDA — sponsor inspection (BIMO) · MHRA — GCP systems inspection · EMA — product-related GCP inspection
Storyboard approvalClinical QA leadClinical QA lead · Head of clinical operations
Medical storyboards also need review byMedical monitorMedical monitor · Clinical QA lead
Approve with an open gapOffOn · Off
Every sentence needs a citationOnLocked on — cannot be turned off
Partly supported when the source is a draftOnOn · Off
Flag numbers that differ from the clinical study reportOnOn · Off
Warn when a cited document is supersededOnOn · Off
Connections

The eTMF, CTMS, EDC and quality records an inspector reads

eTMFdocuments read in place
Clinical trial management systemsites, visits, deviations
Quality systemdeviations and CAPAs
EDCvisit and data listings
Training systemsponsor and CRO staff training records
IRTkits, unblinding, excursions
What it changes

What GCP inspection readiness changes for clinical QA

Each figure carries its label: a target the solution is built to, an estimate, a typical published result, or a proven one.

target
41s
median to answer a document request in a mock inspection
By hand26 min
With agents41 s
target
94%
of storyboard sentences backed by the record; every other one opens a gap
274 of 291 sentences
target
+21points
readiness score gained in the 30 days before the inspection
Readiness 84
target 90 before the inspection

“demo” = seen in the working solution, on its sample study data · “target” = the design goal, measured in the live solution · “estimated” = our estimate · “typical” = published figures (MHRA GCP inspection metrics 2016–17: at least one critical finding at 7 of 15 commercial sponsors inspected). Inspection areas follow FDA Compliance Program 7348.810. Names on the screens are sample data.

Questions

What clinical QA asks about GCP inspection readiness

What is GCP inspection readiness software?

GCP inspection readiness software gets a sponsor ready for an FDA or MHRA GCP inspection: the topics an inspector will probe, a factual storyboard for each, the gaps in the record, and rehearsed answers for the front room. GCP Inspection Readiness adds six agents that read the trial record in place, draft storyboards with a citation on each sentence, check each sentence against its source and play the inspector. The QA lead signs each storyboard.

How does it build an inspection storyboard?

Each storyboard is told in eight frames: the issue, how we found it, timeline, impact, root cause, what we did, proof it worked and where it stands. The Storyboard Writer drafts each sentence with a citation to a document and passage, and the Claim Checker marks each one supported, partly supported or not in the record.

What happens when a storyboard says something the TMF does not back?

The sentence is marked not in the record, with what the record says instead, and a gap opens with an owner and a due date. The owner finds the missing document or rewords the frame to what the record supports; the solution can propose a sentence the record fully supports.

Does it run mock inspections?

Yes. The Inspector Simulator asks FDA- or MHRA-style questions from a question bank by inspection area. The person answers as in the front room, each sentence is checked against the record, and the cited model answer and up to four coaching points follow.

How does it help the back room during an inspection?

When the inspector asks for documents, the Back-room Retriever finds them, checks each is the effective version and complete, lists what is sent and keeps the request clock. A person releases each document. In the sample study’s latest mock the median was 0:41 per request.

Does it change or file documents in our eTMF?

No. The agents read the eTMF and the other systems in place and do not move, edit or file a document. Documents filed after the inspection notice are flagged, and notes-to-file it drafts are filed only after the TMF manager signs them.

Who decides what the inspector sees and what QA signs?

People do. Agents propose topics, draft and check; a person decides which topics become storyboards, the QA approver signs each storyboard with the meaning of the signature, medical storyboards also need the medical monitor, and a person releases each document to the inspector.

Which study documents does it need to start?

The Agentic Solution Engine builds and deploys it from your requirements and documents: your inspection notice, your TMF plan and a sample of your study records. It goes live once each quality gate has passed, and we will walk you through it on one of your own studies first.

Test one study's storyboards
against its own trial master file.

We'll run GCP Inspection Readiness on one of your own studies and its trial master file.