ABL field exams, explained.

When a lender advances money against a company's unpaid invoices and its stock, it cannot take the company's monthly report on trust. So, a few times a year, it sends an examiner to go through the books, trace invoices to shipments and cash, ask customers what they owe, and count the shelves. That visit is the field exam, and its report tells the lender how much it can safely keep lending.

This guide is for anyone who runs, reviews, signs or pays for field exams: field examiners and field exam managers, portfolio managers and credit officers in asset-based lending, collateral and loan review teams, controllers of borrowers who host exams, and the leaders deciding whether to automate the work. No background needed.

See one case, screen by screen →
Watch with transcript →
A quick example · fictional

Imagine you are a senior field examiner at a business credit lender in Ohio, due at a borrower's warehouse on Tuesday, October 13, 2026 at 9:00 a.m. Tamsin Industrial Supply, a Toledo distributor of bearings and fasteners, borrows $16,950,000 on a $35,000,000 revolving line. Its controller sent the quarter's data download on Friday at 4:48 p.m.: 14 files, from 15 months of general ledger to the September aging. You open them on Monday. The borrower's own certificate says it has $2,743,554 of room above its loan.

The September aging behind the certificate shows customer Holloway Packaging owing $342,600, all of it counted as eligible. On the credit memo register you find that on September 28, Tamsin credited 14 Holloway invoices first dated June 15 to July 1 and rebilled them the same day for the same $186,240. New dates made old invoices look current. Under the common rule, once more than half of a customer's balance is over 90 days old, none of it counts.

Aging as reported · Sep 30
Customer
Holloway Packaging
14 invoices dated
Sep 28
Age
2 days
Counted as eligible
$342,600
Re-aged to first invoice dates
Same 14 invoices
Jun 15 – Jul 1
Age
91–107 days
Share past 90 days
54% of the balance
Eligible under the 50% rule
$0
$2,743,554 of room as certified$1,926,428 after the exambelow the $2,500,000 level that triggers a covenant test.

Holloway is one of five findings. Two invoices to another customer were billed on September 29 and 30 but left the dock on October 2. A third customer disputes $38,600 in its reply to the lender. Nine returns worth $214,800 were authorized but not yet credited. And slow stock is $452,300 higher than the certificate admits. Together they cut availability by $817,126.

A good field exam finds the old invoice wearing a new date, and the stock nobody has sold in a year, before the lender advances against them for another quarter.

Field exams for asset-based lending guide
Part A · Understand it

What an asset-based lending field exam is, and what it is meant to find

Scope and frequency, the rules behind them, the data download and the workpapers, the tests worked through with numbers, what court records show exams catching and missing, the market, and how teams run exams today. Nothing in this part sells anything. If you are new to asset-based lending, start here.

01 · In plain words

A lender's quarterly visit to check the collateral behind a revolving loan

A distributor sells parts on 30-day terms, so at any moment it has millions of dollars of unpaid invoices, called receivables, and a warehouse of stock. Both can secure a loan. An asset-based lender agrees to advance, say, 85 cents for every eligible dollar of receivables and 50 cents for every eligible dollar of inventory at cost. As customers pay, the loan comes down; as new invoices go out, the business can borrow again. The cap on what it may borrow on any day is the borrowing base.

The borrower reports that base itself, on a signed borrowing base certificate, monthly or more often. The lender cannot check every number every week, so it trusts the certificate in between and then checks it properly at intervals. That check is the field exam, also called a field audit or collateral audit. The Federal Reserve's examination manual says the lender "should audit the borrower's books" several times a year at the borrower's place of business, and that for satisfactory borrowers "the audit is usually performed quarterly".1

The examiner asks for a data download before the visit: the general ledger, sales and cash journals, the credit memo register, the receivable and payable agings, the perpetual inventory, the shipping and returns logs, every certificate since the last exam. From those files the examiner builds workpapers, one per test. Then come two or three days on site: invoices traced to bills of lading, receipts traced to bank statements, a count of selected shelves, questions for the controller.

The exam ends with a report to credit. It says whether the certificates told the truth, recomputes availability as the examiner sees it, and recommends changes: an account to exclude, a reserve to add, an advance rate to lower, a test to repeat sooner. Then the cycle starts again.

Where the field exam sits in an asset-based loan, in five steps

  1. The line is set upA first exam and an inventory appraisal before closing; the loan agreement defines eligible receivables and inventory, advance rates and reserves.
  2. The borrower certifiesWeekly or monthly certificates with agings and inventory reports; the lender advances against them.
  3. The lender monitorsCash through a lockbox, availability tracked between exams, trends watched.
  4. A field exam tests it allUsually quarterly for weaker credits and once or twice a year for strong ones. Roll-forward, ineligibles, dilution, samples, counts, a report to credit.
  5. Credit acts on the findingsEligibility and reserves change, the borrower is told, and the next exam is scheduled by risk.

Step 4 is the subject of this guide. The day-to-day checking of each certificate and the monitoring between exams have their own guides.

Four facts about field exams that surprise newcomers

The borrower usually pays for the exam

The lender orders it and receives the report, yet loan agreements charge the borrower a daily rate per examiner plus travel. Public credit agreements show $1,000 to $1,100 per examiner-day, for a set number of exams a year.2,3

A tidy aging can be the warning sign

Crediting an old invoice and rebilling it with today's date makes a 100-day receivable look 2 days old. The FDIC's examiners call these "Restarts" and list them among ineligible receivables.4

The rulebooks are old and still current

The Federal Reserve's asset-based lending section is dated May 1996 and still sits in its February 2026 manual. The OCC's booklet dates from 2014. Neither sets a fixed number of exams a year.1,5

Most of the time goes before and after the visit

A veteran examiner recommends 30% preparation, 50% workpapers and 20% reporting, and says reviewing a finished exam "can take two weeks or more".6 The site days are the short part.

Four terms every exam report uses

Ineligible

A receivable or item of stock the loan agreement excludes from the base: too old, disputed, owed by an affiliate, not yet shipped.

Roll-forward

Last exam's receivables, plus sales, minus cash, credits and write-offs, which should equal today's aging to the dollar.

Dilution

Credits other than cash that shrink receivables: returns, allowances, pricing adjustments, as a share of sales.

Excess availability

How much more the borrower could borrow today: the borrowing base less the loan. Many covenants spring to life when it falls below a set level.

Fourteen terms are defined in the one-page summary.

02 · What an exam covers

What a field exam tests, from the certificate to the payroll taxes

In shortAn exam tests the whole working capital cycle: sales become receivables, receivables become cash, cash buys inventory, and payables and taxes compete for the same cash. Supervisors list the same core tests: the certificate reconciled to the books, concentrations, trends, control of cash, taxes paid, verification with customers, credit memos and inventory. Each test answers one question about whether the collateral is real and collectible.

The Federal Reserve's manual gives the scope of an audit as one list. It starts with "verification that the information on the borrowing-base certificate reconciles to the borrower's books", then "review of concentrations of accounts", "review of trends in accounts receivable, accounts payable, inventory, sales, and costs of goods sold" and "review of the control of cash proceeds".

The list goes on with a check of the general ledger, "verification that all taxes, especially sales and payroll, are paid timely" and "review of compliance with the loan agreement".1 The same section asks for a program of "direct confirmation" of receivables, "before the initial lending arrangement and periodically thereafter", on a positive basis.1

The FDIC's examination module, revised in October 2025, tells its examiners to determine whether "periodic on-site audits of borrowers are performed" and, if so, how often, and to check that they look at shipping documents, inventory invoices, turnover, "Direct verification of AR and AP", concentrations, "Sales dilution", the borrower's collection procedures, affiliate receivables and over-advances.4 Practitioners describe the same scope as "the full working capital cycle—cash, accounts receivable (AR), inventory, and accounts payable (AP)", plus payroll tax testing.7

Two supervisors and the practitioners name the same core tests

Which text names each part of a field exam: the Fed's manual, the FDIC's module and a 2025 practitioners' article

Not namedNamed
Fed manual §2160FDIC module (10/25)Practitioners (2025)Certificate reconciled to the booksNamedNot namedNot namedReceivables verified with customersNamedNamedNot namedDilution and credit memosNamedNamedNamedInvoices traced to shipping documentsNot namedNamedNamedControl of cashNamedNamedNamedTaxes paid, especially payrollNamedNamedNamedInventory make-up, counts and ageNamedNamedNamedExam frequency judgedNamedNamedNot named

Our reading of the sources 1,4,7 · Our reading of the three texts. The FDIC module lists turnover, over-advances and borrowing base monitoring rather than a certificate reconciliation; the practitioners' article describes scope, not frequency.

Show the numbers
Fed manual §2160FDIC module (10/25)Practitioners (2025)
Certificate reconciled to the booksNamedNot namedNot named
Receivables verified with customersNamedNamedNot named
Dilution and credit memosNamedNamedNamed
Invoices traced to shipping documentsNot namedNamedNamed
Control of cashNamedNamedNamed
Taxes paid, especially payrollNamedNamedNamed
Inventory make-up, counts and ageNamedNamedNamed
Exam frequency judgedNamedNamedNot named

Four questions every exam answers

Existence

Is it real?

Invoices traced to bills of lading and proof of delivery; customers asked to confirm what they owe; shelves counted. This is where invented sales and phantom stock surface.

Eligibility

Does the agreement count it?

Every ineligible recomputed from invoice detail: past due, cross-aged, contra, affiliate, foreign, bill-and-hold, progress billings, slow or obsolete stock.1

Collectibility

Will it turn into cash?

Dilution, credit memos, disputes, returns not yet credited, turnover and the trend against earlier exams.

And the fourth question: is the cash coming to the lender? The Fed manual says sound management "requires that all payments on accounts receivable be remitted to the bank", and its audit scope checks, on accounts the customer is not told about, that payments reach the bank and positive written confirmations "are issued timely (for example, semiannually)".1 A field exam traces receipts from the bank statement through the cash journal to the aging, so cash that went somewhere else shows up.
03 · The rules and their dates

Which supervisory texts expect field exams, and which of them 2026 left untouched

Status as of October 2026

In shortNo federal rule fixes how a lender runs a field exam. Bank supervisors expect an exam program in the lender's own policy and judge it against their manuals: the Federal Reserve's section 2160 (May 1996), the OCC's Asset-Based Lending booklet (2014) and the FDIC's examination module (October 2025). In 2026 the model risk guidance and the OCC's general lending booklet were replaced; the asset-based lending texts were not.

The asset-based lending texts are old; the guidance around them changed in 2025 and 2026
  1. May 1996Fed manual section 2160

    Audits several times a year, usually quarterly; positive confirmations; the 50 percent rule.

  2. Mar 27, 2014OCC Asset-Based Lending booklet

    Bulletin 2014-11; Version 1.1 dated January 27, 2017; still current.

  3. Jun 15, 2025Auditors' confirmation standard

    PCAOB AS 2310 takes effect for fiscal years ending on or after this date.

  4. Oct 2025FDIC examination module revised

    Commercial and industrial lending, with its asset-based loan procedures.

  5. Apr 17, 2026SR 26-2 replaces SR 11-7

    Spreadsheet arithmetic and fixed rules fall outside the model definition; generative AI and AI that acts on its own outside its scope.

  6. Jun 25, 2026OCC lending booklet

    Lending and Loan Portfolio Risk Management, Version 1.0; the Asset-Based Lending booklet is not on its rescission list.

Source 1,5,4,8,9,10,11

Show the numbers
WhenWhat
May 1996Fed manual section 2160
Mar 27, 2014OCC Asset-Based Lending booklet
Jun 15, 2025Auditors' confirmation standard
Oct 2025FDIC examination module revised
Apr 17, 2026SR 26-2 replaces SR 11-7
Jun 25, 2026OCC lending booklet
Nov 16, 2026Third-party guidance comments due
TextWhat it asks of a field examStatus
Fed Commercial Bank Examination Manual, §2160Audits "several times a year"; "usually performed quarterly" for satisfactory borrowers; auditors "independent of the credit function"; positive confirmations; the 50 percent rule; delinquency measured from the invoice date.1Dated May 1996; in the February 2026 manual
FDIC examination module, C&I lendingWhether periodic on-site audits happen, how often, and what they cover; loan policy must set "Monitoring requirements for bank management and third-party vendors".4Revised October 2025
OCC Comptroller's Handbook, Asset-Based LendingA field audit before a new account is booked, then often quarterly and more often if the risk calls for it, weekly or daily in a workout (section on field audits); examiners watch for units that delay audits or stretch cycles for lack of staff.52014 booklet, Version 1.1 (January 27, 2017)
OCC Lending and Loan Portfolio Risk ManagementGeneral lending risk management; replaced the 1998 Loan Portfolio Management booklet.10Version 1.0, July 2026
SR 26-2 / OCC 2026-13 / FDIC FIL-15-2026A model "excludes simple arithmetic calculations, such as those found within spreadsheets, as well as deterministic rule-based processes and software where there are no statistical, economic, or financial theories underpinning their design or use".9,12April 17, 2026
Third-party guidance, 88 FR 37920Applies to outside exam firms and software providers; the bank keeps the responsibility.13June 9, 2023, in force; replacement proposed September 15, 2026 (91 FR 58536)11
PCAOB AS 2310For public company auditors: confirm receivables, control the requests and replies, never rely on negative confirmations alone.8Fiscal years ending on or after June 15, 2025

The auditors' standard does not bind a lender. It is the clearest recent statement of how to verify a receivable: the person verifying "should select the items to be confirmed, send confirmation requests, and receive confirmation responses", and negative requests, the kind that ask a customer to reply only if something is wrong, give evidence "only when combined with other substantive procedures".8 A field examiner who lets the borrower mail the verifications, or forward the replies, has given up the point of the test.

04 · Frequency and fees

How often a borrower is examined, and who pays for each visit

In shortSupervisors say quarterly for most borrowers and more often when risk rises. Loan agreements turn that into a count the borrower pays for: often one exam a year while availability is comfortable, two when it falls below a threshold, and as many as the lender wants after a default. The borrower pays a daily rate per examiner plus expenses.

The OCC's booklet, in its section on field audits, says a field audit should come before a new account is booked and regularly after that, often quarterly but more often if the risk calls for it, with weekly or even daily audits for a workout borrower.5 The Fed's manual says audits are "usually performed quarterly" for satisfactory borrowers.1 The FDIC asks its examiners only to "determine the frequency" and judge it.4

Contracts filed with the SEC show how lenders write it down. A 2024 amendment to one manufacturer's revolving credit agreement lets the lender bill "one field examination per calendar year", one more if excess availability has been at or below 25% of the maximum revolver amount, and "each other field examination ordered during the existence of an Event of Default".14 A 2023 bank agreement with another manufacturer allows one exam in any 12 months while excess availability stays at or above 15% of the maximum credit, and two if it ever falls below.3

Exams the borrower pays for double when availability runs low

Field exams a year billable to the borrower under two credit agreements filed with the SEC

Availability comfortableAvailability below the threshold
Agreement amended 2024 (threshold 25% of the line)1 a year2 a year
Agreement of 2023 (threshold 15% of the line)1 a year2 a year

Source 14,3 · In both, exams during an event of default are billable without a limit. The lender may examine more often at its own cost.

Show the numbers
Availability comfortableAvailability below the threshold
Agreement amended 2024 (threshold 25% of the line)1 a year2 a year
Agreement of 2023 (threshold 15% of the line)1 a year2 a year

What an examiner-day costs

$1,100/day

per examiner plus out-of-pocket expenses, up to 20 days a year at the borrower's cost, in a non-bank lender's loan agreement modified October 9, 2025.2

SEC filing
$1,000/day

per person, the bank's standard rate "as of the Closing Date" in a 2023 credit agreement; another 2023 amendment struck a fixed $1,000 for the bank's "then standard rate".3,15

SEC filings
2 → 1

Borrowers who keep availability high are examined less: one billable exam a year instead of two in both agreements above.14,3

SEC filings

Why does the borrower pay? The OCC's booklet notes that smaller banks may use independent staff lenders or outsource the work, and that either way the borrower generally bears the cost (section on field audits).5 An exam that runs four examiner-days on site and six off site costs about $10,000 to $11,000 at those rates, before travel. That figure is our arithmetic on the published rates. Nobody publishes a survey of exam fees or exam lengths.

No public figure for exam length. We found no survey of how many days an exam takes, how long reports take to issue, or how often exams change availability. A practitioner's 2020 article is the best public description: templates of "50 to 75 worksheets/papers" and review that "can take two weeks or more".6 Section 13 shows the split of effort it recommends. Your own exam log is the baseline that counts.
05 · The data download and workpapers

The files an examiner asks for, and the workpapers built from them

In shortBefore the visit the borrower sends a data download: about a dozen files that cover the period since the last exam. The examiner turns them into workpapers, one per test, each tying a figure to a source. A good set of workpapers lets someone who was not there follow every number in the report back to the borrower's own records.

File in the downloadWhat the examiner uses it for
General ledger, 12 to 15 monthsControl accounts for receivables, inventory and payables; sales and cash by month; unusual entries.
Sales journalEvery invoice, to roll receivables forward and to draw the sales sample.
Cash receipts journalEvery receipt, to roll forward, test cash application and trace to bank statements.
Credit memo registerEvery non-cash credit, by reason and customer: dilution, rebills, disputes.
Receivable agings at both datesInvoice detail at the last exam and at this cut-off; ineligibles recomputed from it.
Payables agingStretched suppliers, contra accounts with customers who are also suppliers.
Perpetual inventoryEvery SKU at cost with its last sale; ties to the general ledger; picks test counts.
Shipping log and returns (RMA) logProof that billed goods left the dock before cut-off; returns authorized but not yet credited.
Certificates since the last exam, and the last reportWhat the borrower claimed, and what the last exam asked to watch.
Each workpaper feeds the next, and all of them feed availability
  1. 1Roll-forward and ties

    Last aging plus sales less cash, credits and write-offs; agrees to this aging, the general ledger and the certificate.

    Off siteDay 1
  2. 2Ineligibles recomputed

    Past due from the invoice date, cross-aging, contras, affiliates, foreign, disputes.

    Off siteDay 1–2
  3. 3Dilution and credit memos

    Credits by month and reason; rebills found and re-aged; returns not yet credited.

    Off siteDay 2
  4. 4Samples drawn and pre-tested

    Sales to shipping, cash to bank and aging, customer verifications.

    Off site, finished on siteDay 3
  5. 5Inventory

    Perpetual to general ledger, age by last sale, test counts, cost test.

    Count on siteDay 3–5
  6. 6Availability and report

    Base as certified and as examined; findings each tied to a workpaper.

    Examiner, then managerAfter the visit

Our reading of the sources 1,4,7,6 · Our ordering from the supervisory lists and practitioners' descriptions. Days are illustrative.

Show the numbers
StepWhat happensWhoTime
Roll-forward and tiesLast aging plus sales less cash, credits and write-offs; agrees to this aging, the general ledger and the certificate.Off siteDay 1
Ineligibles recomputedPast due from the invoice date, cross-aging, contras, affiliates, foreign, disputes.Off siteDay 1–2
Dilution and credit memosCredits by month and reason; rebills found and re-aged; returns not yet credited.Off siteDay 2
Samples drawn and pre-testedSales to shipping, cash to bank and aging, customer verifications.Off site, finished on siteDay 3
InventoryPerpetual to general ledger, age by last sale, test counts, cost test.Count on siteDay 3–5
Availability and reportBase as certified and as examined; findings each tied to a workpaper.Examiner, then managerAfter the visit

The examiner's discipline is the same one an auditor follows: every figure on a workpaper names the file and row it came from, and a difference that cannot be explained stays on the workpaper as a difference. Practitioners point out that the data rarely arrives clean: examiners "clean and standardize data" from PDFs, inconsistent file layouts and complex corporate structures before any test can run.7

The example's download was 14 files, received Friday, October 9, 2026 at 4:48 p.m., for fieldwork on Tuesday, October 13 to Thursday, October 15.

06 · Roll-forward and ties

Rolling receivables forward to the dollar, and what the general ledger difference means

In shortStart from the aging the last exam tested, add the sales since, subtract the cash, credits and write-offs, and you should land exactly on today's aging. Then tie that aging to the general ledger control account and to line 1 of the certificate. A roll-forward that ties proves the aging is complete. Whether each invoice is real is a question for the samples that follow.

In the example, the June 30 aging was $18,412,560. Over the quarter Tamsin billed $31,846,200, collected $30,118,940, issued $1,431,880 of credit memos and wrote off $62,300. The result is $18,645,640, which equals the September 30 aging and line 1 of the September certificate.

A quarter's activity rolls the June aging to September's to the dollar

Tamsin Industrial Supply, June 30 to September 30, 2026

Aging at June 30, as last tested$18.4M
Plus sales billed$31.8M
Less cash collected$30.1M
Less credit memos$1.4M
Less write-offs$62.3K
Rolled forward to September 30$18.6M

Fictional example from this guide · The rolled-forward figure equals the September 30 aging and line 1 of the certificate.

Show the numbers
StepAmount
Aging at June 30, as last tested$18.4M
Plus sales billed$31.8M
Less cash collected$30.1M
Less credit memos$1.4M
Less write-offs$62.3K
Rolled forward to September 30$18.6M

The general ledger control account read $18,589,140, $56,500 lower. The examiner does not force it. The difference turns out to be cash received on September 30, posted to the general ledger that day and applied to invoices on October 1: unapplied cash, which the certificate had already deducted. That explanation goes on the workpaper with the receipt.

What a tie proves

The aging is complete and arithmetically sound against the books, and the certificate starts from it. A gap between aging and general ledger usually has a dull cause, such as unapplied cash, a cut-off difference or a manual journal, and each one is named.

What it cannot prove

A fictitious invoice entered in the sales journal flows through the general ledger and the aging alike, so everything ties. A rebill also ties: the credit and the new invoice cancel. Existence and age need the tests in the next three sections.

The same roll-forward, month by month, gives the examiner the monthly sales, cash and credit figures that dilution and turnover are built on. In the example, September's credits were $757,400 on $10,552,300 of sales, 7.2% as reported, more than double July's 2.9%. That jump is the thread the next sections pull.

07 · Ineligibles and cross-aging

How one rebilled customer becomes wholly ineligible under the 50 percent rule

In shortLoan agreements exclude receivables that are too old, disputed, owed by affiliates or foreign customers, or billed before shipment. The examiner recomputes each class from invoice detail. Two rules do most of the work: age is measured from the original invoice date, and once enough of a customer's balance is past due, all of it is excluded. A credit-and-rebill is designed to beat both.

The Fed's manual explains why delinquency is measured from the invoice date: an agreement that says "90 days from the invoice date when payment is required in 30 days" stops a borrower from keeping late accounts eligible "by giving dated terms (extending payment days)". Under the "50 percent rule", if a customer owes ten invoices and six are delinquent, "all ten would be considered ineligible", including the four that are not yet late.1

The same section lists contra accounts, affiliate accounts, concentrations ("no more than 20 percent of the receivables assigned should be from one customer" as "A common benchmark"), bill-and-hold sales and progress billings.1

Ineligible classWhy it is excludedWhere the examiner looks
Past dueOld invoices collect lessAging by original invoice date
Cross-agedA customer mostly past due may not pay the restShare past due, by customer
Restarts (credit and rebill)New dates on old debtsCredit memos matched to new invoices4
Pre-billed, bill-and-holdNo delivery, so no debt yetShipping log and bills of lading1
Contra and affiliateOffset, or invoices between friendsPayables aging, ownership records1
DisputedThe customer says it will not payVerification replies, correspondence

The Holloway rebill, worked through

On September 28, Tamsin credited 14 Holloway Packaging invoices first dated June 15 to July 1 and reissued them the same day for the same $186,240. As reported, those invoices were two days old. Measured from their first dates they were 91 to 107 days old at September 30, past the agreement's 90 days from invoice. That put $186,240 of Holloway's $342,600 balance, 54%, past due: above the 50% cross-aging limit, so all $342,600 is ineligible. At an 85% advance rate that is $291,210 less availability.

Re-aging 14 rebilled invoices moves $186,240 from current to past 90 days

Tamsin's receivables at September 30, 2026, as reported and with rebills given their first invoice dates

As reportedRe-aged to first invoice dates
0–30 days$9.8M$9.7M
91–120 days$702.3K$888.5K
Over 90 days in all$1.1M$1.3M

Fictional example from this guide · Over 90 days rises from 5.9% to 6.9% of $18,645,640. The 31–60, 61–90 and over-120 buckets do not change.

Show the numbers
As reportedRe-aged to first invoice dates
0–30 days$9.8M$9.7M
91–120 days$702.3K$888.5K
Over 90 days in all$1.1M$1.3M

Across the book, recomputing every class from invoice detail raised receivable ineligibles from the certified $1,912,400 to $2,354,960: Holloway's $342,600, $61,360 billed before shipment, and $38,600 a customer disputed in its reply. Receivables availability fell from $14,223,254 to $13,847,078.

When a rebill is legitimate. Customers do ask for invoices to be reissued when a purchase order changes. The test is what the customer's terms say. In the example the controller confirmed on site that the June invoices were reissued at Holloway's request and that Holloway's terms still ran from June, which is why they keep their first dates. The examiner records the reason; credit decides.
08 · Dilution and credit memos

Measuring dilution once the rebills are taken out

In shortDilution is the share of sales that never turns into cash because of returns, allowances, pricing credits and the like. It decides how much cushion the advance rate needs. Measured carelessly it is wrong both ways: rebills inflate it, and returns that are authorized but not yet credited hide the next month's credits. The examiner reads the credit memos one reason at a time.

The Fed's manual says the advance rate must leave "a sufficient margin for the continual costs of collection and absorption of dilution", and that "A lender must know how dilution is occurring in each receivable portfolio to measure it continually". Returns, bad debts, product liability and warranty claims are the negative causes; discounts and allowances can be benign.1 The OCC's booklet adds that dilution is usually expected to be 5 percent or less, and that a rise can signal falling product or service quality.5

In the example, Tamsin's credit memos for the quarter were $1,431,880 on $31,846,200 of sales: 4.5%. But $186,240 of those credits were the Holloway rebill, which cancels an invoice and reissues it. Taken out of both credits and sales, true dilution is 3.9% for the quarter. September alone is 5.5%, against 2.8% to 3.6% in each of the eleven months before it and a 5% trigger in the loan agreement.

September's true dilution broke the 5% trigger after a year near 3%

Tamsin's monthly dilution, rebills removed, October 2025 to September 2026

True dilutionLoan agreement trigger
0%2%4%6%5.5%5%
Oct 25DecFebAprJunAug

Fictional example from this guide · As reported, September was 7.2%. The $186,240 rebill alone equals 1.8% of September's sales, and none of it was dilution.

Show the numbers
True dilutionLoan agreement trigger
Oct 252.8%5%
Nov3%5%
Dec3.6%5%
Jan 262.9%5%
Feb3.1%5%
Mar3.3%5%
Apr3%5%
May3.2%5%
Jun3.1%5%
Jul2.9%5%
Aug3.4%5%
Sep 265.5%5%

Credits by reason tell you what to fix

Returns of defective goods are the largest credit; the rebill is the one to remove

Tamsin's credit memos for July to September 2026, by reason

Returns, defective goods (412 memos)$498.3K
Pricing adjustments (318)$322.1K
Volume rebates (96)$214.6K
Other (125)$112.2K
Credit and rebill, one customer (14)$186.2K
Freight and shortages (241)$98.4K

Fictional example from this guide · 1,206 memos, $1,431,880 in all. $268,900 of the returns were one customer's.

Show the numbers
ReasonCredits
Returns, defective goods (412 memos)$498.3K
Pricing adjustments (318)$322.1K
Volume rebates (96)$214.6K
Other (125)$112.2K
Credit and rebill, one customer (14)$186.2K
Freight and shortages (241)$98.4K

The returns log matters as much as the credit memo register. Nine returns from one customer, worth $214,800, were authorized in September but not yet credited at cut-off. Those receivables are on the aging at full value and will shrink within weeks. The examiner recommends a reserve for the full amount, so availability already reflects credits the borrower has promised but not yet issued.

09 · Sales, cash and verification

Sampling invoices, receipts and customer replies, and what a clean sample proves

In shortThree tests check that receivables exist. The sales test traces sampled invoices to bills of lading and proof of delivery. The cash test traces receipts from the bank statement to the aging. Verification asks customers directly what they owe. Each sample should record how it was drawn, so a reviewer can tell whether a clean result means anything.

Sales to shipping: catching pre-billing

The Second Circuit's Carboni case shows the test working. Cableco, a Connecticut distributor of wire and cable products, pre-billed invoices for goods not yet shipped from September 1993 to January 1994 and listed them as eligible on its certificates. The bank found the scheme at a February 1994 audit: its examiner found about $547,000 of advances not supported by eligible collateral and testified that some accounts were pre-billed "by as much as fifty-eight days". The bank's net loss was about $674,230.16

In the example, the sample was every September invoice over $100,000 (six of them) plus 34 drawn at random from the rest with a recorded seed: 40 invoices, $2,936,400, 27.8% of September's sales. Thirty-seven matched the shipping log. Two invoices to one customer, dated September 29 and 30 for $61,360, left the dock on October 2, so they were not receivables at cut-off. The third, a $55,060 order drop-shipped by Tamsin's supplier, had no record in Tamsin's own log; on site the carrier's proof of delivery dated September 28 cleared it.

From 41,862 invoices to two that were billed before they shipped

Tamsin's sales-to-shipping test for September 2026

Sales lines in the quarter41,862
Invoices sampled from September40
No shipment on the log at billing3
Still unsupported after the site visit2

Fictional example from this guide · The two unsupported invoices total $61,360; at 85% they cut availability by $52,156.

Show the numbers
StageInvoices
Sales lines in the quarter41,862
Invoices sampled from September40
No shipment on the log at billing3
Still unsupported after the site visit2

What a clean sample can and cannot tell you

A sample with no exceptions does not prove there are none. With zero exceptions in n items, the 95% upper bound on the exception rate is roughly 3 ÷ n, a result statisticians call the rule of three.17 Forty clean invoices still allow an exception rate of up to about 7%. That is why examiners also stratify, taking every large item. Where the data allows it, a test of every invoice against the shipping log says more than any sample.

A clean sample of 40 still allows up to 7% of invoices to be wrong

95% upper bound on the exception rate when a random sample finds no exceptions

0%10%20%30%3%
102030406080100

Our reading of the sources 17 · Exact binomial bound 1 − 0.05^(1/n); the rule of three, 3 ÷ n, gives nearly the same.

Show the numbers
Sample sizeUpper bound, exact
1025.9%
2013.9%
309.5%
407.2%
604.9%
803.7%
1003%

Cash: following the money, and who paid it

The cash test samples receipts and traces them from the bank statement through the cash receipts journal to the invoices they paid. It catches misapplied cash, cash that never reached the lender's account, and, if the examiner looks at who paid, cash that came from the wrong place.

In the Allou case, the indictment says the company booked hundreds of millions of dollars of fictitious sales, then recorded transfers from family-affiliated companies "as payments for the fictitious sales", while "The Lenders' auditors conducted audits of Allou on a quarterly basis".18 The SEC's complaint put the falsified sales at about $220 million in the fifteen months to March 2003.19 A receipt that matches an invoice proves little if the payer is not the customer.

Verification: asking the customer

The Fed's manual asks for "a program of direct confirmation", on "a positive basis".1 In the example, the lender sent verifications to the twelve largest customers and eight at random, $9,701,800 or 52.0% of receivables, with replies addressed to the lender. Sixteen confirmed, three were cleared by cash received after cut-off, and one customer disputed $38,600 for defective couplings. The disputed amount became ineligible.

Of 20 customers asked, 16 confirmed their balances and one disputed $38,600

Tamsin's customer verifications, September 30, 2026: the twelve largest customers and eight at random

Confirmed by the customerCleared by cash after cut-offDisputed
Customers asked163

Fictional example from this guide · $9,701,800, 52.0% of receivables, with every reply addressed to the lender. The disputed $38,600 became ineligible.

Show the numbers
VerificationsConfirmed by the customerCleared by cash after cut-offDisputed
Customers asked1631
10 · Inventory

Counting the shelves: test counts, cost tests and slow stock

In shortThe inventory work ties the perpetual records to the general ledger, ages every item by its last sale, counts a sample of shelves and checks costs against supplier invoices. The count tests whether the records match the floor; the aging tests whether the certificate excludes what the loan agreement calls slow or obsolete. Most inventory findings are about age; missing stock is rarer.

Record errors are common even without fraud. In a study of nearly 370,000 inventory records at 37 stores of one retailer, 65% did not match what was on the shelf, and the researchers found that auditing practices reduced the errors.20 A distributor's warehouse differs from a store, and the lesson still carries over: a perpetual record is a claim to be tested, and a count of well-chosen items is the test.

65 in 100 inventory records did not match the shelf in a large retail study
65 in 100

of nearly 370,000 inventory records at 37 stores of one retailer were inaccurate.

Source 20

Show the numbers
MeasureValue
of nearly 370,000 inventory records at 37 stores of one retailer were inaccurate.65 of 100

The count

Examiners count in both directions: from the sheet to the floor, which tests that recorded items exist, and from the floor to the sheet, which tests that the records are complete. Counts are weighted to value. In the example, the count covered 60 SKUs, 40 chosen from the 500 most valuable and 20 at random, $612,480 at book value. Fifty-seven agreed; three differed by a net $9,840, 1.6% of counted value, inside the 2% tolerance in the loan agreement. A cost test of 25 SKUs against supplier invoices found every one within 5%.

Video counts became common during the pandemic. One firm described counting from the floor to the records with warehouse staff opening boxes on camera, and still said "we would make visits if inventory was involved".21

Slow stock the certificate left in

Tamsin's perpetual held 18,412 SKUs, $14,280,600 at cost, tying to the general ledger. Aged by last sale, $1,064,300 had not sold in 12 months. The certificate excluded only $612,000, because the borrower counted only SKUs with no sale in 18 months, while the loan agreement says 12. The difference, $452,300, is ineligible; at a 50% advance rate, availability falls by $226,150.

$1.06 million of stock has not sold in a year; the certificate excluded $612,000

Tamsin's inventory at cost, September 30, 2026, by time since last sale

Sold in the last 3 months$8.9M
3–6 months$2.4M
6–12 months$1.9M
12–24 months$712.6K
Over 24 months$351.7K

Fictional example from this guide · The last two rows are ineligible under the loan agreement: $1,064,300.

Show the numbers
Since last saleAt cost
Sold in the last 3 months$8.9M
3–6 months$2.4M
6–12 months$1.9M
12–24 months$712.6K
Over 24 months$351.7K
11 · What exams catch, and miss

What court and agency records show field exams catching, and being fooled by

In shortThe public record shows both. A 1994 bank audit caught pre-billing within months. Quarterly audits at a health and beauty distributor were defeated for years by fabricated documents and cash routed through affiliates. The 2025 and 2026 losses tied to an auto parts maker, a subprime auto lender and a materials distributor turned on receivables or collateral that prosecutors or the lender say were fake, misrepresented or pledged twice. The lesson for an exam is in the mechanics each scheme relied on.

The same schemes recur: pre-billing, fake sales, collateral pledged twice
  1. Feb 1994A bank audit finds pre-billing

    About $547,000 of unsupported advances; invoices up to 58 days early (United States v. Carboni, 2d Cir. 2000).

  2. 2003Quarterly audits obstructed

    Indictment: fictitious sales, sham inventory purchases, documents fabricated to obstruct the lenders' periodic audits (Allou).

  3. Oct 2010Certificates overstate receivables

    FinCEN case: a contractor's monthly receivables reports and certificates were false; found through a review of Bank Secrecy Act filings.

  4. Sep 2025$170–200 million impairment

    A bank discloses alleged external fraud at an asset-backed finance borrower, later tied in press reports to Tricolor.

  5. Dec 17, 2025Double-pledging charged

    Tricolor executives indicted; the fraud began to unravel in August, after lenders learned an audit begun in February was unfinished.

  6. Jan 29, 2026Fake invoices charged

    First Brands' founder indicted: invoices for transactions 'that had never occurred', collateral double- and triple-pledged.

  7. Jul 9, 2026$22 million charge-off

    A bank reports a $23.6 million asset-based loan to a materials distributor that misrepresented its receivables and collateral.

Source 16,18,19,22,23,24,25,26,27 · Indictments are allegations; the defendants are presumed innocent. None of these records describes how a field exam was performed.

Show the numbers
WhenWhat
Feb 1994A bank audit finds pre-billing
2003Quarterly audits obstructed
Oct 2010Certificates overstate receivables
Sep 2025$170–200 million impairment
Dec 17, 2025Double-pledging charged
Jan 29, 2026Fake invoices charged
Jul 9, 2026$22 million charge-off
RecordWhat it saysWhat it means for an exam
United States v. Carboni (2d Cir. 2000)Pre-billed invoices listed as eligible; found at a February 1994 audit.16Sales-to-shipping at cut-off works when it is run.
U.S. v. Jacobowitz (E.D.N.Y. 2003); SEC Lit. Rel. 18751Quarterly lender audits; fabricated documents; affiliate cash booked as customer payments.18,19Trace who paid as well as how much; treat affiliate traffic as a test of its own.
First Brands indictment (S.D.N.Y. 2026)"In some instances, invoices were generated for transactions that had never occurred"; factors sold "billions of dollars of purported customer receivables that did not exist"; collateral double- and triple-pledged.26Verification and lien searches test existence and ownership; a third party's purchase of the same invoices is a red flag.
Tricolor indictment (S.D.N.Y. 2025)Collateral double-pledged; the scheme began to unravel in August, after lenders learned that an audit begun in February had not been completed, and several lenders "expressed concerns".25An audit or exam that stalls is a finding in itself.
FirstSun Form 8-K (July 9, 2026)"an asset-based loan to a materials distributor", about $23.6 million; the bank believes the borrower "made fraudulent misrepresentations about its accounts receivable, collateral and historical financial results".27A mid-sized distributor is the kind of borrower a quarterly exam covers.
Each scheme has a test that can catch it, if the test is run on the right data

Which field exam test bears on each scheme

LittleSomeDirect
Roll-forwardSales to shippingCash to payerVerificationCountLien searchPre-billingLittleDirectLittleSomeLittleLittleCredit and rebillSomeLittleLittleSomeLittleLittleInvented customers and invoicesLittleDirectSomeDirectLittleLittleCash routed through affiliatesLittleLittleDirectSomeLittleLittlePhantom or slow stockLittleLittleLittleLittleDirectLittleCollateral pledged twiceLittleLittleLittleSomeLittleDirect

Our reading of the sources 1,4,6,26,18,16 · Our reading. A roll-forward catches a rebill only when credits are matched to new invoices; verification catches invented customers only when the examiner controls the addresses.

Show the numbers
Roll-forwardSales to shippingCash to payerVerificationCountLien search
Pre-billingLittleDirectLittleSomeLittleLittle
Credit and rebillSomeLittleLittleSomeLittleLittle
Invented customers and invoicesLittleDirectSomeDirectLittleLittle
Cash routed through affiliatesLittleLittleDirectSomeLittleLittle
Phantom or slow stockLittleLittleLittleLittleDirectLittle
Collateral pledged twiceLittleLittleLittleSomeLittleDirect

Practitioners list the same patterns: "pre-billing receivables before shipment", "refreshing the A/R aging by credits and rebills to current receivables", and collusion with "phony vendors, phony customers", dishonest truckers or warehouse staff.6 Supervisory texts add bill-and-hold, progress billings and affiliate accounts.1,4 The 2025 and 2026 cases show why the cost of a missed scheme is measured in the loan itself: a bank expected a non-cash impairment of $170 million to $200 million on a loan of about $200 million, and another expected to charge off $22.0 million of $23.6 million.23,27

12 · The market

More asset-based deals and leaner teams: the numbers behind exam workloads in 2026

In shortThe lenders that answer the Secured Finance Network's quarterly survey in every quarter held about $320 billion of committed asset-based lines at the end of 2024. That figure covers a fixed panel of respondents, which is part of the market. New deals rebounded in 2026, non-bank lenders grew faster than banks, and the lenders' own head counts fell in 2023 and 2024. More borrowers per examiner is the direction of travel.

Committed asset-based credit lines held near $320 billion through 2024

Total committed credit lines, lenders reporting to SFNet in every quarter shown, billions of dollars

285Q1 22
293.8Q2
301.3Q3
309.1Q4
307Q1 23
312.2Q2
322.9Q3
320.1Q4
320.4Q1 24
322.3Q2
321.1Q3
319.9Q4 24

Source 28 · A same-respondent panel that covers part of the industry. Line usage was 36.1% at Q4 2024.

Show the numbers
QuarterBillions of dollars
Q1 22285
Q2293.8
Q3301.3
Q4309.1
Q1 23307
Q2312.2
Q3322.9
Q4320.1
Q1 24320.4
Q2322.3
Q3321.1
Q4 24319.9

The 2026 surveys show activity picking up. In the fourth quarter of 2025, non-bank lenders' outstandings rose 12.6% in the quarter and their commitments 5.5%, while banks' commitments rose 0.5% and their outstandings fell 5.1% on seasonal paydowns.29 In the second quarter of 2026, 36 lenders reported new commitments to new clients up 58.7% at banks and 60.9% at non-banks on the quarter.30

New client commitments rose by about 60% in the second quarter of 2026

Quarter-on-quarter change, asset-based lenders reporting to SFNet, Q2 2026

New commitments to new clients, non-banks60.9%
New commitments to new clients, banks58.7%
Total commitments, non-banks3.9%
Outstandings, banks2%
Total commitments, banks1.3%

Source 30 · Non-bank outstandings fell 1.2%. Bank non-accruals were 0.78% of outstandings, against a 30-year average of 0.92%.

Show the numbers
MeasureChange
New commitments to new clients, non-banks60.9%
New commitments to new clients, banks58.7%
Total commitments, non-banks3.9%
Outstandings, banks2%
Total commitments, banks1.3%

Credit quality at banks was good by long-run standards: criticized and classified loans were 10% of outstandings, non-accruals 0.78% against a 30-year average of 0.92%, and gross write-offs 0.09% against 0.41%; at non-banks, criticized loans and non-accruals rose.30 Meanwhile total employees at the reporting lenders fell 2.5% from 2022 to 2023 and 4.2% from 2023 to 2024.28 No public survey counts field examiners; the employee figure is the closest public proxy, and it points one way.

13 · How teams do it today

Who examines, who signs, and where the weeks between fieldwork and report go

In shortA field examiner, often one of a small team covering dozens of borrowers, builds the workpapers, visits and drafts the report. A field exam manager schedules, reviews and signs. A credit officer approves changes to eligibility and reserves; the portfolio manager tells the borrower. The examiner's days go mostly to preparing and writing up, and the report waits for review.

Field examiner, exam manager, credit officer and the borrower's controller

FE

Field examiner

Requests the download, builds the workpapers, draws the samples, spends two or three days on site, drafts the report. Often covers a region and a dozen or more borrowers a year.

Cares about: arriving on site knowing what to look at.
FM

Field exam manager

Schedules exams by risk, staffs them, reviews every workpaper and signs every report.

Cares about: no exam slipping past its due date.
CO

Credit officer

Approves eligibility and reserve changes, advance rates and any waiver.

Cares about: the workpaper behind every dollar taken out of the base.
PM

Portfolio manager

Owns the relationship, watches availability weekly, tells the borrower what changes.

Cares about: hearing first, before the borrower does.
BC

The borrower's controller

Sends the data download, answers questions, sits in the opening and exit meetings.

Cares about: an exam that ends with no surprises and a fee that matches the work.

The Fed's manual asks that the people who perform audits "be independent of the credit function".1

Four people between the exam request and credit's action

A quarterly exam passes through four people before credit acts on it
  1. 1Scheduled and requested

    Exam set by risk rating; data download requested for a cut-off date.

    Field exam managerWeeks ahead
  2. 2Prepared off site

    Download read; roll-forward, ineligibles, dilution, samples, inventory aging.

    Field examinerAbout a week
  3. 3Fieldwork

    Opening meeting, documents, test counts, walk-through, exit meeting.

    Field examiner2 to 3 days
  4. 4Report drafted

    Findings, recommended changes, availability as examined.

    Field examinerAbout a week
  5. 5Reviewed and signed

    Every workpaper reviewed; questions back to the examiner.

    Field exam managerTwo weeks or more
  6. 6Acted on

    Eligibility and reserve changes approved; borrower told.

    Credit officer, portfolio managerDays

Illustrative · replace with your own numbers · Times are illustrative except the review, which one practitioner puts at two weeks or more (ABF Journal, 2020).

Show the numbers
StepWhat happensWhoTime
Scheduled and requestedExam set by risk rating; data download requested for a cut-off date.Field exam managerWeeks ahead
Prepared off siteDownload read; roll-forward, ineligibles, dilution, samples, inventory aging.Field examinerAbout a week
FieldworkOpening meeting, documents, test counts, walk-through, exit meeting.Field examiner2 to 3 days
Report draftedFindings, recommended changes, availability as examined.Field examinerAbout a week
Reviewed and signedEvery workpaper reviewed; questions back to the examiner.Field exam managerTwo weeks or more
Acted onEligibility and reserve changes approved; borrower told.Credit officer, portfolio managerDays

Where an examiner's hours go

Half of an exam should be workpapers, by one veteran examiner's recommended split

Recommended share of a field exam's effort

PreparationCompleting the workpapersReporting
Recommended split30%50%20%

Source 6 · A practitioner's recommendation; no measured split is published. The same article says templates hold 50 to 75 worksheets and that fewer can do.

Show the numbers
PreparationCompleting the workpapersReporting
Recommended split30%50%20%

The same practitioner argues that the worksheets have crowded out the judgment, and that "you do not need 50 or 75 to achieve an adequate report".6 A 2022 round table listed what a good report shows: key findings, test results and exceptions, and proposed eligible and ineligible collateral with the calculations behind them; it also warned that "An overly aggressive timeline may be unrealistic".31 Practitioners also stress data security: examiners handle "highly sensitive, non-public information" that "must be protected from cyber threats and unauthorized access".7

Three ways lenders run exams

In house

A field exam department

Staff examiners on a bank template of worksheets, a manager who signs, travel by region. Close to credit, independent of the lending officer.1

Outsourced

An exam firm

Common at smaller lenders; the OCC notes the cost is generally passed on to the borrower.5 The lender stays responsible under third-party guidance.13

Software

Templates, analytics and drafting tools

Spreadsheet templates, tools that ingest agings and compute ineligibles, report writers, and newer tools that read every file and draft findings. They differ on what they read, what they test in full, and whether each figure keeps its source.

Remote work stayed after 2020. One firm had done desktop exams "for more than five years as a necessity to save costs" by 2021; another examiner expected exams to become "partially remote and partially at the borrower", and saw few billable hours saved.32,21 The analysis can travel; the count, the warehouse walk and the controller's answers mostly cannot.

Part B · See it working

Botminds Field Exam Automation at work on a quarterly exam of an Ohio distributor

Part A described the work without naming a product. This part shows how Botminds does it, at a fictional business credit lender with 38 asset-based borrowers and seven field examiners. Every company, person, number and file in the screens is sample data.

14 · One exam, start to finish

The Tamsin exam: 14 files on Friday, three days on site, a report signed the next morning

In shortThis is the example from the top of the page, inside the product. The exam program runs the moment the borrower's 14 files arrive: 32 steps finished before the visit, one stop where a person must look, and seven steps left for the site days. Owen Castellano, the senior field examiner, confirms five findings on site; Denise Haugland, the field exam manager, signs the next morning; the credit officer approves the changes to the borrowing base.

1

The exam schedule, with Tamsin ready to prepare

Monday, October 12. Owen's exam list shows 31 of 38 borrowers due this quarter, one overdue, and a median of 3 days from fieldwork to report against 19 days in 2025. Tamsin Industrial Supply is at the top: quarterly, cut-off September 30, fieldwork Tuesday to Thursday, report due Thursday, October 22, five business days after fieldwork.

Gail Prentiss, Tamsin's controller, uploaded the 14 files on Friday at 4:48 p.m.

The exam schedule. Every exam in the book by risk, with cut-off, fieldwork dates, stage, findings and the report due date.
2

The program runs, and stops on the sales test

Owen runs the exam program: 39 steps in eight areas, from receivables to the borrowing base. Twelve steps in, it stops. Of September 40 invoices sampled, 37 agree with the shipping log and three have no shipment at billing. Two Pembury Conveyor invoices, billed September 29 and 30, left the dock on October 2. A $55,060 Galloran Truck Bodies order was drop-shipped by the supplier, so only the carrier's proof of delivery can clear it.

The held card shows the sample's method beside the three invoices: every invoice over $100,000 plus 34 at random, seed 2610-05.

Stopped where a person must look. The sales test held with its three invoices, the sample's method and seed, and why the drop shipment needs the site visit.
3

Thirty-two steps done before the visit

Owen holds the three invoices for the shipping office on Tuesday at 10:30 a.m. and the program finishes in 1 minute 23 seconds of agent time. Every step that needs no eyes is done: receivables tied to the dollar, the Holloway rebill found, true dilution measured, inventory aged, availability recomputed.

The seven steps that need a person become his site days: the opening meeting, the bills of lading, the approvals on credit memos over $10,000, the floor count, the slow bays, the bank statements and the exit meeting.

The program, finished. Each test area as a checklist with its workpaper and result; the held sales test waits for Tuesday.
4

Eleven workpapers from fourteen files

The exam overview shows what each agent did and how long it took: 41,862 sales lines, 9,114 receipts, 1,206 credit memos and 18,412 SKUs read; four samples drawn; five findings raised. Availability as certified is $19,693,554. After the findings it is $817,126 lower, and excess availability of $1,926,428 sits below the $2,500,000 springing level.

The exam overview. Availability as certified and after the exam, each agent's run, and the test plan with each workpaper's result.
5

Every finding confirmed on site

Thursday afternoon, Owen confirms each finding against what he saw. Gail Prentiss confirmed the June invoices were reissued at Holloway's request with terms still running from June. Both Pembury bills of lading are signed by the carrier on October 2. Seven of the nine Ardent Robotics returns are in the receiving bay. The Galloran drop shipment was cleared by the carrier's proof of delivery dated September 28.

Unticking a finding drops it, but it stays on the workpaper with his reason, and the manager sees it.

Confirm the findings. Five findings, each with what the examiner saw on site; a dropped finding keeps its reason on the workpaper.
6

Signed off, then to credit

Owen submits the report on Thursday, October 15 at 5:20 p.m. Denise Haugland signs it off on Friday, October 16 at 8:42 a.m., one day after fieldwork. Owen then sends the five changes to the borrowing base to Ruth Okafor, the senior credit officer, with the workpaper behind each one. Marcus Tellwood, the portfolio manager, tells the borrower after she approves.

Sign-off. Examiner, manager and credit officer, each with a time; agents never issue a report or change a borrowing base.

The solution's design target is a signed report one to two days after fieldwork, with every finding tied to its workpaper. It is a target, to be measured on your own exams. The example's dates follow the sample data; October 12, 2026 is Columbus Day, and nothing in the example depends on a bank or the Federal Reserve being open that day.

15 · Every workpaper on screen

The workpapers behind the report, screen by screen: ties, ineligibles, dilution, samples, stock and trends

In shortOne exam is the story. These screens show the workpapers behind it: the roll-forward and the re-aged aging, every ineligible recomputed, dilution with the rebill taken out, the three tests of existence, the inventory, the report's borrowing base impact, the site plan, the borrower against its history and the book, and the rules the exam is judged by.

Roll-forward and ties. June's aging rolled to September's to the dollar, by month, with the $56,500 general ledger difference explained as unapplied cash.
Re-aged to first dates. The 14 rebilled invoices move from current back to 91–120 days.
Ineligibles recomputed. Each category as certified and as recomputed from invoice detail under the loan agreement's definitions.
Dilution and credit memos. Twelve months of true dilution with September's rebill shown apart, and the quarter's credits by reason.
The rebilled invoices. Each credited invoice beside its rebill and its first date, and the returns authorized but not yet credited.
Sales to shipping. The sample's three exceptions, each with its bill of lading and result.
Verifications. Replies come back to the lender, never to the borrower; one dispute, three cleared by later cash.
Inventory. Every SKU aged by last sale against the certificate's exclusion, and each category tied to the general ledger.
Test counts. Sixty SKUs weighted to value, filtered to the three variances; the net difference is inside the 2% tolerance.
Borrowing base impact. Five adjustments, each with its workpaper, from $19,693,554 to $18,876,428.
Findings in the report. Each finding with its recommendation, its effect on availability and the workpapers it cites.
The site days. Built from the steps the program could not finish, each with a time and a place.
Trends. The borrower against its own history and the book's distributors; a pattern found at one borrower is checked at the others.
Your exam rules. Past due, cross-aging, the dilution trigger, rebills, samples and slow stock as plain choices, versioned on the audit trail.

Select any screen to open it larger. The lender, borrowers, customers, people and figures are fictional sample data.

16 · Agents, and who signs

What each agent prepares for the field examiner, and who confirms, signs and approves

In shortEach agent has one job and limits it does not cross. None of them edits the borrower's data, calls a pattern fraud, issues a report, changes a borrowing base or contacts the borrower. The field examiner owns every conclusion and confirms it on site, the field exam manager signs every report, and a credit officer approves each change to eligibility or reserves.

Six agents read the download and draft the workpapers and report

General ledger and aging reader

Reads the download, general ledger, journals, agings, perpetual, shipping and returns logs and certificates, and maps every file to the exam.

Never edits the borrower's data; flags a file that does not add up and asks about it.

Roll-forward and tie-out builder

Rolls receivables forward from the last exam, ties the aging to the general ledger and the certificate, and recomputes every ineligible from invoice detail, with cross-aging.

Never forces a tie; a difference stays open on the workpaper until explained.

Dilution and credit memo analyst

Measures dilution by month and reason, matches credits to rebills and ages them from the first date, and reads the returns log for returns not yet credited.

Never calls a pattern fraud; it raises it for the examiner.

Sample selector

Draws each sample with its method, seed and coverage, and pre-tests it against the shipping log and the verification replies.

Never drops a selected item without a recorded reason.

Inventory analyst

Ties the perpetual to the general ledger, ages every SKU by last sale, plans the test counts and runs the cost test.

Never values inventory; it measures quantity, cost and age.

Report drafter

Drafts the report with every finding citing its workpaper, computes the borrowing base impact and tests the springing covenant.

Never issues a report or changes a borrowing base.

Examiner confirms, manager signs, credit officer acts

Confirms on siteField examinerOwns every conclusion, confirms each finding against what he saw, and drops one only with a reason that stays on the workpaper.
Signs every reportField exam managerReviews the workpapers and signs before anything reaches credit or the borrower.
Approves the baseCredit officerApproves each change to eligibility or reserves; the portfolio manager tells the borrower.

Every agent step and every human decision is recorded with who, what and when. Edits to a report make a new version, and changes to the exam rules are versioned too.

Owen Castellano's exam team and Tamsin's controller

Fictional, from the sample data
OC

Owen Castellano · senior field examiner

Runs 14 exams a year across Ohio and Pennsylvania, three days on site each.

"I spend the first week building workpapers and the last two writing them up."
DH

Denise Haugland · field exam manager

Schedules seven examiners over 38 borrowers; reviews and signs every report.

"If an exam slips a quarter, that's the finding the regulator writes."
RO

Ruth Okafor · senior credit officer

Approves eligibility and reserve changes.

"Show me the workpaper behind every dollar you take out of the base."
MT

Marcus Tellwood · portfolio manager

Watches Tamsin's availability weekly and owns the relationship.

"Tell me what changes in availability before the borrower hears it."
GP

Gail Prentiss · controller, Tamsin Industrial Supply

Sends the data download and sits in the exit meeting.

"Our credit memos are all approved. Ask me anything."
17 · What goes in and out

From the borrower's data download to cited workpapers and a signed field exam report

In shortThe solution reads the files borrowers already send, runs your exam program under your loan agreements' definitions, and leaves behind workpapers with every figure tied to its file and row, samples with their method on record, a draft report that cites every test, and the signatures it needs. Your loan and collateral systems stay where they are.

From the borrower

  • General ledger and sales journals
  • Receivable and payable agings at both dates
  • Credit memos and cash receipts
  • Perpetual inventory with last sale dates
  • Shipping and returns logs
  • Certificates since the last exam

From the lender

  • Your exam program and report format
  • Each borrower's eligibility terms, advance rates and reserves
  • Sample rules, tolerances and the dilution trigger
  • The last exam report and its findings
Agents run the exam program Every file read, every tie run, every SKU aged, before the examiner arrives
The examiner confirms on site
Every finding cites its workpaper

Outputs

  • Roll-forward and ties to the general ledger and certificate
  • Ineligibles recomputed from invoice detail
  • Dilution with rebills removed and returns reserved
  • Samples with method, seed, coverage and results
  • Inventory aged, counted and costed
  • A draft report with cited findings and the borrowing base impact
  • Recommended eligibility and reserve changes for credit

What changes for the team

  • Site days planned from the program's stops
  • Review by opening a finding's source
  • The borrower read against its history and the book

Borrower portal, collateral system and lien searches to connect

Borrower portal or secure uploadData downloads in, requests out
Loan and collateral systemCertificates, balances, reserves
Document managementAgreements, past reports, workpapers
Credit approval workflowBorrowing base changes
Lien search service (Uniform Commercial Code filings)Who else claims the collateral
Outside exam firmsShared programs and workpapers
Identity and accessRoles, sign-off, separation of duties
EmailVerification requests and replies

For each, check whether it has an API, a file feed, or only screens, and who owns it.

Your exam program and loan agreements set the checklist

Your exam program

Becomes the checklist the program runs, step by step, with your workpaper numbering and your report format.

Your loan agreements

Their eligibility definitions, advance rates and reserves become each borrower's rules, versioned when an amendment changes them.

Your collateral system

Stays the system of record for certificates and availability; approved changes go into it through your normal process.

Your outside exam firms

Can work in the same program, with the same workpapers and the same evidence.

Your loan review and auditors

Get exams they can test finding by finding, with every figure's file and row and every dropped finding's reason.

Your borrowers

Send the same download they send today, and see fewer examiner-days on the bill when the groundwork shrinks.

Three rules every exam follows

1

Every finding carries its workpaper

File and row, one click away, for the examiner, the manager and your regulator's examiner.

2

Never forced, never dropped silently

A tie that does not tie stays open; a finding the examiner drops keeps its reason.

3

Agents prepare; people decide

Agents read, test and draft. A named examiner confirms, a manager signs, a credit officer approves.

Part C · Are you ready to automate?

Deciding on field exam software: today's exam costs, the return, readiness and vendor checks

You run field exams, manage the people who do, or answer for the collateral they test. This part is written for you: what slow and thin exams cost today, what automating the groundwork could return, whether your team is ready, and what to ask any vendor of field exam software, including us.

18 · What slow exams cost

What weeks of workpapers and a late report cost a lender

In shortStart from your own numbers. Nobody publishes how long exams take or how often they change availability, so your exam log is the evidence. Three published figures frame it: what an examiner-day is billed at, how long review can take, and what a missed receivables fraud costs when it surfaces.

$1,100/day

per examiner plus expenses in a non-bank lender's loan agreement as modified in 2025; a bank's standard rate was $1,000 per person per day in 2023.2,3

SEC filings
2+ weeks

to review a completed field exam, in a practitioner's account, after the workpapers and the report are written.6

ABF Journal, 2020
$22.0M

expected charge-off on a $23.6 million asset-based loan to a materials distributor that, the bank believes, misrepresented its receivables and collateral.27

Form 8-K, July 9, 2026
The days that move are preparation, writing and review; the site days stay

Working days for one quarterly exam of a distributor, by hand and with the groundwork automated

By hand (estimate)Groundwork automated (design target)
Reading the download and tying out2 days0.5 days
Credits, dilution and ineligibles2 days0.5 days
Choosing and pre-testing samples1 day0.5 days
On site: counts, documents, meetings3 days3 days
Writing the report5 days0.5 days
Manager review and sign-off3 days0.5 days

Illustrative · replace with your own numbers · Neither column is a measurement. Time three of your own exams by phase; measure the target in a pilot.

Show the numbers
By hand (estimate)Groundwork automated (design target)
Reading the download and tying out2 days0.5 days
Credits, dilution and ineligibles2 days0.5 days
Choosing and pre-testing samples1 day0.5 days
On site: counts, documents, meetings3 days3 days
Writing the report5 days0.5 days
Manager review and sign-off3 days0.5 days
What nobody publishes. We found no public figure for examiner days per exam, days from fieldwork to report, the share of exams that change availability, the average availability change, or examiner turnover. Vendor figures come without a dataset. Your exam log, your report dates and your credit approvals hold all of them.

Log your examiners' hours by exam phase

CostWhere it hidesHow to find your number in a week
Examiner days off siteReading downloads, tying out, rebuilding the same workpapers each quarterAsk three examiners to log hours by phase on their next exam
Days from fieldwork to signed reportDrafting, then the manager's review queueFieldwork end date and sign-off date for last year's exams, from your schedule
Overdue examsBorrowers examined late because the team is fullExams past their risk-based due date, by quarter
Availability you advanced against too longFindings that existed weeks before the reportFor exams with adjustments, the adjustment times the days from cut-off to report
Tests you did not run in fullSamples where the whole file could be testedWhich tests used a sample last year, and how big
Supervisory and audit findingsLate exams, thin workpapers, findings not followed upYour last two examination reports and internal audit reports on the ABL unit

Advances on a rebill, fee-weary borrowers and departing examiners

The quarter you advanced on a rebillAvailability overstated from cut-off until the report, then again until the next exam.
The borrower who left over the feeA controller who sees ten billed examiner-days for a clean exam starts taking calls from other lenders.
The examiner who leftExams that are mostly keying and formatting are hard to staff, and the know-how goes with each departure.
The finding nobody comparedA pattern at one borrower that also sits at two others in the book, unseen because each report stands alone.
The covenant test that sprang lateExcess availability below the trigger weeks before anyone knew it was.
19 · Your return

Your return on field exam automation, priced in examiner days and review days

In shortPut in your own numbers. The calculator starts from a published wage for auditors and asks for the rest: exams a year, examiner and manager days per exam now and after, and what the tool and your testing cost a year. Every default marked illustrative is an assumption to replace.

Workpapers built before the visit, reports days after fieldwork

Examiner time

Workpapers built before the visit

The download read, ties run, ineligibles recomputed and samples drawn when the files arrive.

exams × examiner days saved × cost of an examiner day
Review time

Every finding tied to its workpaper

The manager opens a finding's source instead of asking for it, so review takes days instead of weeks.

exams × manager days saved × cost of a manager day
Coverage

Every item tested where the data allows

Every invoice against the shipping log, every credit memo against new invoices, every SKU aged.

share of tests run on 100% of items, before and after
Speed to credit

A report days after fieldwork

Availability corrected sooner after the cut-off date.

adjustment × days saved from cut-off to report
Capacity

No overdue exams

The same team covers more borrowers on schedule, or more often for the risky ones.

exams a year per examiner, before and after
The book

Findings compared across borrowers

Dilution, aging and patterns read against the borrower's history and its peers.

patterns found at more than one borrower a year

Run the numbers on your own exam schedule

The examiner-day default is built from the median wage for accountants and auditors, $83,680 a year, divided by 2,080 hours and by 0.70 for benefits (an assumption), times 8 hours.33 Every input marked illustrative is an assumption.

Your volume
Days per exam
Your cost
Illustrative yearly value
Examiner days released a year0
Manager days released a year0
Time released, valued$0
After your yearly cost$0
Exams a year to cover your cost0

Formulas, per year:
Examiner days released = exams × (days today − days with automation)
Time released, valued = exams × (examiner days saved × examiner day cost + manager days saved × manager day cost)
After your cost = time released, valued − yearly cost
Break-even exams = yearly cost ÷ value saved per exam; a very large number means the days saved never cover the cost

Site days are left out on purpose: counts, documents and meetings take the same time either way. Not counted: availability corrected sooner, whole-file testing, overdue exams cleared, findings compared across the book. Released days are value only when you decide what they are for: more borrowers per examiner, more frequent exams of risky borrowers, or a lower fee.

How many days an exam saves decides how many exams pay for the tool

Exams a year to cover $150,000 of yearly cost, at $460 an examiner day and $600 a manager day

Saves 8 examiner days and 2.5 manager days29 exams
Saves 4 examiner days and 1.5 manager days55 exams
Saves 2 examiner days and 0.5 manager days123 exams

Illustrative · replace with your own numbers · Break-even = $150,000 ÷ (examiner days × $460 + manager days × $600), rounded up.

Show the numbers
Days saved per examExams a year
Saves 8 examiner days and 2.5 manager days29 exams
Saves 4 examiner days and 1.5 manager days55 exams
Saves 2 examiner days and 0.5 manager days123 exams

A team of seven examiners doing 14 exams each a year runs about 100 exams and clears the first two lines comfortably. A lender with ten large, clean borrowers examined once a year does not, and should say so before buying anything.

Start here20 · Readiness check

A field exam readiness score: your baseline, exam program, data downloads and governance

In shortPick the answer closest to your team today. Eight questions score 0 to 2; the last is for reflection. The meter adds up your score as you go, and each question says why it matters and what a strong answer sounds like.

1
Volume

How many field exams does your team run in a year, including initial exams before closing?

Why it mattersDays saved per exam turn into examiner capacity only at volume.
A strong answer"About 110: 38 borrowers, most quarterly, plus six new deals."
2
Your baseline

Do you know examiner days per exam, days from fieldwork to signed report, and how many exams are overdue?

Why it mattersNo public benchmark exists, so your own baseline is the only proof of improvement.
A strong answer"Eleven examiner days, a median of 19 days to report, two overdue last quarter."
3
The exam program

Is your exam program written down: the tests, the samples, the workpapers and the report format?

Why it mattersSoftware runs a program. One that lives in each examiner's habits has to be written first.
A strong answer"One program with 39 steps in eight areas, sample rules and a report template, owned by the field exam manager."
4
Loan agreement terms

Are eligibility definitions, reserves and advance rates captured per borrower in a form software can read?

Why it mattersIneligibles are recomputed by the agreement's definitions; a borrower whose agreement says 12 months for slow stock must be tested at 12.
A strong answer"A term sheet per borrower in our loan system: past due, cross-aging, concentrations, slow stock, reserves."
5
Data downloads

Do borrowers send their downloads electronically, in usable formats, to one place?

Why it mattersPDF agings work but take longer to set up than exports from the borrower's accounting system.
A strong answer"Through a secure portal, mostly CSV exports, with a standard request list."
6
Findings

Have supervisors, internal audit or loan review commented on late exams, thin workpapers or unfollowed findings in the last two years?

Why it mattersFindings bring deadlines and budget. The OCC tells examiners to watch for units that delay audits or extend cycles for lack of staff.5
A strong answer"Internal audit found three exams past due and two findings not carried to the next exam."
7
Owner and budget

Is there a named owner of field exams with a budget to change how they are done?

Why it mattersExams cross the field exam team, credit, portfolio management, outside exam firms and IT. Without one owner the change stalls.
A strong answer"The head of ABL sponsors it, and outside exam fees can move to it."
8
Governance

Do you have a path to approve AI in credit work: vendor due diligence, a view on SR 26-2, human sign-off and an audit trail?

Why it mattersThe 2026 model guidance leaves generative and agentic AI to your own framework, and third-party guidance keeps the responsibility with you.9,13
A strong answer"Vendor management and model risk have a path for AI tools, and every report needs a named examiner and manager."
9
Vision · for reflection

If every exam's groundwork were done the day the download arrived, what would your examiners do with the site days, and what would your credit officers do with a report in two days?

Why it mattersYour answer says where the value lands: deeper site work, more frequent exams of risky borrowers, or faster changes to availability.
A strong answerA specific list, for example: "walk every slow bay, interview the credit manager, examine the three watch-list borrowers monthly."

From three timed exams to a new standard of preparation

0–6

Explore

Build the baseline first: time three exams by phase, write down one exam program and one report format, and name an owner. Start with one test, such as the roll-forward and ineligibles, on every exam.

7–11

Ready to pilot

Run a measured pilot on 15 to 25 past data downloads whose findings you know, some with planted problems. Compare findings caught, false alarms and examiner days with your current process, with your examiners and manager signing every report.

12–16

Ready to implement

Plan the full program: your tests and sample rules as settings, the agreement terms per borrower, sign-offs, the download portal, links to your loan and collateral systems, and the evidence an examiner from your regulator will ask for.

21 · Questions for any vendor

Seventeen questions on rebills, samples, workpapers and proof for field exam software or an exam firm

In shortAsk every vendor the same questions, us included. The answers show what the tool reads, which tests it runs on every item, how it treats rebills and returns, what evidence you keep, whose rules apply, and how you would measure it on your own exams.

AskA good answerA warning sign
What it reads
Which files does it read: general ledger, journals, credit memos, agings, perpetual, shipping and returns logs, certificates, the last report?All of them, in the formats your borrowers send, with each file mapped to the exam"Upload the aging and we compute ineligibles"
What does it do with a file that does not foot or a column it cannot place?Flags it and asks; never edits the borrower's dataSilent clean-up
The tests
Does the roll-forward tie to the aging, the general ledger and the certificate, and what happens to a difference?All three ties; a difference stays open on the workpaper until explainedA plug line called "other"
How does it find credit-and-rebill, and how does it age a rebilled invoice?Matches credits to new invoices by customer, items and amount; ages from the first date if your agreement says soRebills counted as dilution, or not looked for
Which tests run on every item, and which on samples?A list: every invoice against the shipping log, every SKU aged, samples only where a document must be seen"Statistical sampling throughout"
How are samples drawn, and can an item be swapped?Method, seed and coverage recorded; a swap needs a written reasonSamples that change when you re-run
Does it read the returns log for returns authorized but not yet credited?Yes, with a reserve recommendation per customerDilution from the credit memo register only
Evidence and sign-off
Can every finding in the report be opened at its workpaper, and every workpaper figure at its file and row?Yes, for the examiner, the manager and your regulator's examinerA confidence score in place of a source
Who confirms findings, who signs the report, who approves availability changes?Your examiner, your manager, your credit officer; the tool never issues a report or changes a baseReports sent to credit automatically
What happens when the examiner drops a finding?It stays on the workpaper with the reason, visible to the managerFindings deleted without a trace
Your rules
Are past due, cross-aging, dilution triggers, slow stock and sample sizes our settings, per borrower where the agreement differs?Yes, versioned, with who changed whatOne rule set for every borrower
Does it write our report format and our workpaper numbering?Yours, section for sectionIts own report, to be reformatted
Your data and AI
Which AI models do you use, where do they run, and does borrower data train them?Named models, a region you choose, no training on your data, in writing"Proprietary AI", no more detail
How should we classify each part under SR 26-2 and our third-party program?A component-by-component answer for your model risk team"It's all a model" or "none of it is"
How is borrower data secured, and who at your firm can see it?Encryption, access by role, logs you can readDownloads in shared folders
Proof
Can we test it on past downloads whose findings we know, with problems we plant?Yes, blind, with clean copies to count false alarmsDemo data only
What will you report from the test?Findings caught by type with the number planted, false alarms, examiner daysOne accuracy percentage

We found no published independent test of any field exam tool's accuracy, as of October 2026. A test on your own past exams, with planted problems, is the fairest comparison, and the same test measures your current process.

22 · How to start

A ten-week field exam pilot on past downloads whose findings you already know

In shortMeasure first, then test on past downloads with known findings and some planted ones, then run live exams in parallel, then decide with three numbers. None of these steps commits you to a vendor.

  1. Time three exams by phase, and pull last year's fieldwork and sign-off dates. That is your baseline.
  2. Write down the program: tests, sample rules, report format, and the agreement terms of the borrowers in the pilot.
  3. Gather 20 past downloads with their final reports. Copy five and plant problems: a rebill, a pre-billed invoice, an unrecorded return, a slow SKU left in.
  4. Run four live exams in parallel with your examiners doing their usual work and signing the reports.
  5. Decide with three numbers: findings caught by type, false alarms on clean copies, and examiner and manager days.
A ten-week pilot ends with a decision on three numbers
Your teamVendor
Time three exams; pull report dates
Write the program and agreement terms
Choose 20 downloads; plant problems in 5 copies
Load your program, rules and report format
Run the test set blind
Parallel run on four live exams
Score findings, false alarms, days
Decide
Week 0246810

Illustrative · replace with your own numbers

Show the numbers
ActivityFromTo
Time three exams; pull report dates02
Write the program and agreement terms03
Choose 20 downloads; plant problems in 5 copies13
Load your program, rules and report format24
Run the test set blind35
Parallel run on four live exams59
Score findings, false alarms, days810
Decide9.510

Findings caught by type, false alarms and days to a signed report

MeasureHowWhy
Findings caught by typeKnown and planted findings caught ÷ present, per type, with the number presentOne percentage hides the missed rebill
False alarmsFindings raised on clean copies, in reviewer minutesA tool that flags everything catches every plant
Figure accuracy200 random workpaper figures checked against their file and rowNone wrong in 200 bounds the error rate near 1.5%17
Examiner and manager daysLogged by phase, against your baselineThe cost case rests on it
Days from fieldwork to signed reportFrom the last site day to sign-offCredit's number, and the borrower's
The full working-session questions: 18 questions in six groups

Bring the field exam team, credit, portfolio management, loan review, model risk, vendor management and IT into one room. Each question says why it matters, what a strong answer looks like, and the warning sign.

A

Exams a year by frequency and borrower size

A1

How many exams do we run a year, by frequency and by borrower size?

Why it mattersQuarterly exams of mid-sized borrowers are where the days repeat.
Strong answer · warning sign
Counts by frequency and size.
One number, nobody sure of the mix.
A2

Which exams do outside firms run, and what do we pay them?

Why it mattersOutside fees are a budget that can move.
Strong answer · warning sign
Fees by borrower and firm.
Billed to borrowers, never tracked.
A3

Which borrowers would we keep on the current process, and why?

Why it mattersComplex, paper-heavy borrowers may gain least at first; say so early.
Strong answer · warning sign
A short exclusion list.
"Everything, day one."
B

Program and rules

B1

Is there one exam program, and who owns it?

Why it mattersSoftware runs one written program; habits must be written down first.
Strong answer · warning sign
One owner, versioned.
Each examiner's own template.
B2

Where do the agreement's eligibility terms live for each borrower?

Why it mattersIneligibles are only as right as the definitions behind them.
Strong answer · warning sign
Structured, per borrower.
"In the credit agreement PDF."
B3

How do we treat rebills, returns not yet credited and drop shipments?

Why it mattersThese are the judgment calls that become settings.
Strong answer · warning sign
Written rules with examples.
Depends on the examiner.
C

Findings and history

C1

What did supervisors or internal audit say about our exams in the last two years?

Why it mattersFindings show where the program breaks.
Strong answer · warning sign
A list by type.
Nobody tracks them.
C2

Re-run three past exams carefully: would any availability figure change?

Why it mattersIt is the cheapest way to size what is being missed.
Strong answer · warning sign
Done, with differences explained.
"Our exams are fine."
C3

Do findings carry from one exam to the next, and across borrowers?

Why it mattersA pattern at one borrower is a question for the others.
Strong answer · warning sign
A findings log by pattern.
Each report on its own.
D

Data and systems

D1

How do downloads reach us, and how complete are they on arrival?

Why it mattersA missing returns log waits on the borrower whatever tool you buy.
Strong answer · warning sign
A portal with a request list.
Email threads.
D2

Where do certificates, loan balances and reserves live, and can software read them?

Why it mattersAvailability as examined needs both.
Strong answer · warning sign
Named systems with exports or APIs.
Re-keyed from PDFs.
D3

Where does the signed report go, and in what form?

Why it mattersSets the integration work.
Strong answer · warning sign
The credit file and the collateral system, named.
Unknown.
E

Model risk and vendor rules for exam software

E1

Has our model risk policy moved from SR 11-7 to SR 26-2?

Why it mattersThe old letter was replaced on April 17, 2026.9
Strong answer · warning sign
Updated, with a view on AI tools.
Still cites SR 11-7.
E2

What does vendor management need before a pilot sees borrower data?

Why it mattersThe due diligence is the lender's.13
Strong answer · warning sign
A known path and timeline.
First time anyone has asked.
E3

Are examiners independent of the lending officers for the borrowers they examine?

Why it mattersThe Fed's manual asks for independence from the credit function.1
Strong answer · warning sign
Separate reporting lines.
The account officer runs the exam.
F

Workpapers ready the day the download arrives

F1

What if every exam's workpapers were ready the day the download arrived?

Why it mattersTests the appetite for a new standard of preparation.
Strong answer · warning sign
"Our examiners would spend the site days on the floor."
"The review queue is the bottleneck anyway."
F2

What if risky borrowers were examined monthly at today's cost?

Why it mattersLinks capacity to risk.
Strong answer · warning sign
A named watch list.
No one has thought about it.
F3

Which steps would we never let software do without a person?

Why it mattersTells you where the signatures belong.
Strong answer · warning sign
Confirming findings, signing, changing the base, talking to the borrower.
"All of it": then start with the roll-forward.
23 · Frequently asked questions

Field exam frequency, fees, roll-forwards, rebills and remote exams: common questions

In shortThe questions lenders, examiners and borrowers search for most, each answered on its own.

What is a field exam in asset-based lending?

A field exam is a lender's periodic review of an asset-based borrower's books and collateral, on site or partly remote. The examiner rolls receivables forward, ties the aging to the general ledger and the borrowing base certificate, recomputes ineligibles, measures dilution, traces invoices to shipments and receipts to bank statements, verifies balances with customers and test-counts inventory. The report tells credit how much the borrower can safely borrow.

How often are field exams done?

No rule fixes a number. The Federal Reserve's examination manual says audits usually happen quarterly for satisfactory borrowers and more often if needed, and the OCC's booklet expects one before a loan is booked and more frequent audits when risk rises. Loan agreements often let the lender bill one or two exams a year, more when availability is low, and any number after a default.

What is the difference between a field exam and a collateral audit?

They are two names for the same work. "Field exam", "field examination", "field audit" and "collateral audit" all describe the lender's review of a borrower's receivables, inventory and controls. It is separate from the borrower's annual financial statement audit by its accountants, and from an inventory appraisal, which estimates what the stock would fetch in a sale.

Who pays for an ABL field exam?

Usually the borrower. Credit agreements charge a daily rate per examiner plus travel; public agreements show $1,000 to $1,100 per examiner-day for a set number of exams a year. The OCC notes that whether banks use their own staff or outside firms, the cost is generally passed on to the borrower.

What is an accounts receivable roll-forward?

It starts from the receivables balance tested at the last exam, adds sales since, and subtracts cash collected, credit memos and write-offs. The result should equal the current aging to the dollar, and the aging should tie to the general ledger and the borrowing base certificate. For example, $18,412,560 + $31,846,200 − $30,118,940 − $1,431,880 − $62,300 = $18,645,640.

What is credit and rebill, and why does it matter?

Credit and rebill means crediting an existing invoice and issuing a new one for the same goods, usually with a new date. It can be legitimate, but it also makes old receivables look current and can keep a customer eligible. Examiners match credits to new invoices and, where the agreement says so, age the new invoice from the original date; the FDIC calls these restarts.

What is cross-aging in a borrowing base?

Cross-aging excludes all of a customer's receivables once a set share of them is past due. The Federal Reserve's manual describes the common 50 percent rule: if six of a customer's ten invoices are delinquent, all ten are ineligible. Lenders may set a lower share for riskier books.

How is dilution calculated in a field exam?

Dilution is non-cash credits, such as returns, allowances and pricing adjustments, divided by gross sales for the same period. Examiners take out credits that are not true dilution, such as rebills, and add returns authorized but not yet credited as a reserve. For example, $1,431,880 of credits on $31,846,200 of sales is 4.5%; without a $186,240 rebill it is 3.9%.

How do field examiners verify receivables?

They send verification requests to selected customers, usually the largest plus a random group, asking them to confirm what they owe, with replies sent to the lender. Customers who do not reply can be cleared by cash received after the cut-off. Disputed amounts become ineligible, and the examiner, never the borrower, should control the requests and replies.

What does a field exam report include?

A summary, collateral and availability as certified and as examined, each finding with its workpaper and recommendation, and the test results: roll-forward, ineligibles, dilution, samples, verifications, inventory counts and cost. It recommends changes to eligibility, reserves or advance rates and notes covenant effects. A field exam manager signs it before credit acts on it.

Can field exams be done remotely?

Much of the analysis can: reading the download, the roll-forward, ineligibles, dilution and sample selection. Video counts became common during the pandemic, but practitioners still visit when inventory is involved, and the opening and exit meetings are usually held on site. Many lenders now run hybrid exams.

Is field exam software a model under SR 26-2?

Mostly not. SR 26-2, issued April 17, 2026, excludes spreadsheet arithmetic and deterministic rules from its definition of a model, which covers roll-forwards and ineligibles, and puts generative and agentic AI outside its scope. A lender's own governance and the third-party guidance then apply, and statistical scoring built on exam data can still be a model.

24 · One-page summary

The field exam on one page: download, roll-forward, ineligibles, dilution, samples and report

Print this page

In shortThe whole guide on one screen: the exam, the rules as of October 2026, the readiness bands and the terms.

The exam
  1. Request the download for a cut-off date: general ledger, journals, credit memos, agings, perpetual, shipping and returns logs, certificates.
  2. Roll receivables forward; tie the aging to the general ledger and the certificate; never force a tie.
  3. Recompute ineligibles from invoice detail: age from the first invoice date, cross-age, contras, affiliates, disputes.
  4. Measure dilution with rebills removed and returns not yet credited reserved.
  5. Sample sales to shipping, cash to bank and payer, and verify with customers; record method and seed.
  6. Tie, age and count inventory; test cost.
  7. Report availability as certified and as examined; manager signs; credit approves changes.

Readiness: score 0–2 on eight questions: 0–6 explore · 7–11 pilot · 12–16 implement.

As of October 2026: Fed manual §2160 (May 1996) and the OCC's 2014 booklet still current · FDIC module revised October 2025 · SR 26-2 replaced SR 11-7 on April 17, 2026 · OCC lending booklet Version 1.0, July 2026 · third-party guidance replacement proposed September 15, 2026.

14 terms
Borrowing base
Eligible collateral times advance rates, less reserves: the most the borrower may owe.
Certificate
The borrower's signed report of its borrowing base.
Excess availability
Borrowing base less the loan; triggers springing covenants.
Field exam
The lender's periodic test of the books and collateral; also field audit or collateral audit.
Data download
The files the borrower sends before the exam.
Workpaper
One test's record, each figure tied to its file and row.
Roll-forward
Last aging + sales − cash − credits − write-offs = this aging.
Ineligible
Collateral the agreement excludes from the base.
Cross-aging
All of a customer excluded once a set share is past due.
Credit and rebill
An invoice credited and reissued, often with a new date; a restart.
Dilution
Non-cash credits ÷ sales; returns, allowances, pricing credits.
Pre-billing
Invoicing before goods ship; the invoice counts only once the goods leave.
Verification
Asking customers directly what they owe, replies to the lender.
Test count
Counting selected items, sheet to floor and floor to sheet.
25 · Sources

Sources

Accessed October 2026. Regulatory status statements are as of October 2026.

  1. Board of Governors of the Federal Reserve System, Commercial Bank Examination Manual, section 2160 "Asset-Based Lending" (2160.1 effective May 1996), in the February 2026 edition of the manual. federalreserve.gov
  2. SPAR Group, Inc., Loan and Security Agreement of April 10, 2019 with North Mill Capital LLC d/b/a SLR Business Credit, as modified (Exhibit A to the Eighth Modification Agreement, October 9, 2025), section 2.9. sec.gov
  3. Culp, Inc., Second Amended and Restated Credit Agreement with Wells Fargo Bank of January 19, 2023, as amended by the Third Amendment of June 12, 2025 (8-K exhibit 10.1), sections 5.7 and 5.12(e). sec.gov
  4. FDIC, Examination Modules, "Commercial and Industrial Lending: Core Analysis Procedures" (10/25). fdic.gov
  5. OCC, Comptroller's Handbook, "Asset-Based Lending", Version 1.0, March 2014 (OCC Bulletin 2014-11, March 27, 2014); Version 1.1, January 27, 2017; reputation-risk references removed as of March 20, 2025 (OCC Bulletin 2025-4). occ.gov
  6. D. J. Flores, "An overemphasis on work papers has caused field exams to lose focus", ABF Journal, July 31, 2020. abfjournal.com
  7. D. Jung and T. Tanber, "Field Exams: Evolving Tools, Unchanging Purpose", The Secured Lender (Secured Finance Network), December 22, 2025. sfnet.com
  8. SEC, "Order Granting Approval of Auditing Standard Governing the Auditor's Use of Confirmation" (PCAOB AS 2310), 88 FR 84837, December 6, 2023. federalregister.gov
  9. Federal Reserve, SR 26-2, "Revised Guidance on Model Risk Management", and attachment, April 17, 2026. federalreserve.gov
  10. OCC Bulletin 2026-29, "Lending and Loan Portfolio Risk Management", new Comptroller's Handbook booklet (Version 1.0, July 2026), June 25, 2026. occ.gov
  11. Board of Governors, FDIC, NCUA and OCC, "Proposed Third-Party Risk Management Guidance", 91 FR 58536, September 15, 2026. federalregister.gov
  12. OCC Bulletin 2026-13, "Model Risk Management: Revised Guidance", and FDIC FIL-15-2026, April 17, 2026. occ.gov
  13. Board of Governors, FDIC and OCC, "Interagency Guidance on Third-Party Relationships: Risk Management", 88 FR 37920, June 9, 2023. federalregister.gov
  14. Unifi, Inc., First Amendment to Second Amended and Restated Credit Agreement, September 5, 2024 (Form 8-K, exhibit 4.1), section 2.10(c). sec.gov
  15. Flexsteel Industries, Second Amendment to Credit Agreement with Wells Fargo Bank, May 24, 2023 (Form 10-K exhibit 10.25), section 2.10(c). sec.gov
  16. United States v. Carboni, 204 F.3d 39 (2d Cir. 2000), decided February 18, 2000. law.resource.org
  17. E. Eypasch, R. Lefering, C. K. Kum and H. Troidl, "Probability of adverse events that have not yet occurred: a statistical reminder", BMJ 311:619 (1995). doi.org
  18. United States v. Herman Jacobowitz et al. (Allou Health & Beauty Care), indictment, U.S. District Court, Eastern District of New York (2003). justice.gov
  19. SEC, Litigation Release No. 18751, SEC v. Jacobowitz et al. (2004). sec.gov
  20. N. DeHoratius and A. Raman, "Inventory Record Inaccuracy: An Empirical Analysis", Management Science 54(4), 627–641 (2008). ideas.repec.org
  21. D. F. Clarke, "Changed for Good? Completing Field Exams in a New Normal", ABF Journal, June 17, 2021. abfjournal.com
  22. FinCEN, The SAR Activity Review: Trends, Tips & Issues, Issue 18 (October 2010), "Conviction for Making False Statements". fincen.gov
  23. Fifth Third Bancorp, Form 8-K (alleged external fraudulent activity, asset-backed finance loan), September 2025. sec.gov
  24. American Banker, "FirstSun joins list of banks hit by borrower fraud", July 10, 2026. americanbanker.com
  25. NBC News, "Tricolor executives indicted", December 17, 2025, reporting the S.D.N.Y. indictment. nbcnews.com
  26. IRS Criminal Investigation, "First Brands executives charged with multibillion-dollar fraud" (U.S. Attorney, S.D.N.Y., 26 Cr. 29 and 26 Cr. 25), January 29, 2026. irs.gov
  27. FirstSun Capital Bancorp, Form 8-K, July 9, 2026. sec.gov
  28. Secured Finance Network, Asset-Based Lending Survey, 2024 Q4 & Annual (non-participant report), February 2025. sfnet.com
  29. Secured Finance Network, "SFNet Data Highlights Strong Year-End Performance in ABL and Factoring", April 14, 2026. sfnet.com
  30. ABF Journal, "SFNet Releases Q2 ABL Index as Lender Optimism Continues", October 1, 2026. abfjournal.com
  31. M. Ocejo, "Field Examinations in 2022 and Beyond", The Secured Lender, October 5, 2022. sfnet.com
  32. Secured Finance Network, "Interview with Denise Albanese", The Secured Lender (2020). sfnet.com
  33. O*NET OnLine, "Accountants and Auditors" (13-2011.00), median wage $83,680 a year (BLS 2025 wage data). onetonline.org
Next step

See it on your own data downloads.

Explore the solution, or bring a past data download from one of your borrowers with your exam program and report format, and we will prepare the exam with you, every finding tied to its workpaper and file.

botminds.ai The complete guide to asset-based lending field exams · October 2026. Halverson Ridge Business Credit, Tamsin Industrial Supply, Holloway Packaging, Pembury Conveyor, Ardent Robotics, Galloran Truck Bodies, every other borrower and customer, every person and every figure in the example and the screens are fictional. Court and agency records are cited from their public sources. Regulatory status is as of October 2026; check the sources before relying on it.